Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
Tender Value
Refer Docs
Closing Date
7 Aug 2023, 6:55 pmClosed
Executive Engineer Mech. Irrig. DIv. Baramulla
Mech. Irrig. DIv. Baramulla
Rewinding of 3-Phase 1450RPM 50 HP Horizontal Motor at Lift Irrigation Scheme Saifkhul of MISD Sopore.
2023_IFC_224345_22
eNIT 09 of 2023-24
Open Tender
Repair and Maintenance Works
Item Rate
7 days
Sopore
Please refer Tender documents.
8 documents required · 8 mandatory
₹50
Yes
Executive Engineer Mech. Irrig. DIv. Baramulla
Yes
12 Aug 2023
1 Aug 2023
8 Aug 2023
1 Aug 2023
7 Aug 2023
1 Aug 2023
Amount
Disconnecting of all motor leads, dismantling of motor, taking out the rotor from the stator, and complete disassembly as per requirement of job.
Mechanical transportation, loading, unloading and handling of pump using appropriate means of transport like Tata Mobile upto a lead of 24 Km per trip.
Complete rewinding of 3-phase 1450 RPM 50HP Horizontal motor by standard specific gauge of copper wire required for 50HP motor. Approximate wt 26kgs.
Providing and fitting of insulating material viz., insulating paper, tapping , connecting wires complete.
Assembling of all motor parts, coupling and alignment with pump, reconnecting of leads and testing on full load.
Deduct cost of old scrap extracted from the equipment.( 80% or as per actual).
Asif Engineering Works
City Engineering Works
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .