Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹12.9 LAdmitted-Finance | -26.87% | ₹12.9 L | L1 | Admitted-Finance |
| 2 | L2₹14.1 L+₹1.2 L (9.52%)Admitted-Finance | -19.91% | ₹14.1 L+₹1.2 L (9.52%) | L2 | Admitted-Finance |
| 3 | L3₹15.4 L+₹2.5 L (19.4%)Admitted-Finance | -12.71% | ₹15.4 L+₹2.5 L (19.4%) | L3 | Admitted-Finance |
| 4 | L4₹15.7 L+₹2.8 L (21.5%)Admitted-Finance | -11.12% | ₹15.7 L+₹2.8 L (21.5%) | L4 | Admitted-Finance |
| 5 | L5₹16.7 L+₹3.8 L (29.6%)Admitted-Finance | -5.21% | ₹16.7 L+₹3.8 L (29.6%) | L5 | Admitted-Finance |
Tender Value
₹17.6 L
EMD Value
₹35,240
Closing Date
6 Jul 2026, 11:15 amClosed
xen west
jda jodhpur
protection wall construction work on road situated near gangana pond
2026_JDAJO_572723_1
JoDA/Nit-04/West/2026-27
Open Tender
Civil Works
Percentage
90 days
jda jodhpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
secretary jda jodhpur and md risl jaipur
₹35,240
Yes
6 Jul 2026
2 Jul 2026
6 Jul 2026
2 Jul 2026
6 Jul 2026
2 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic Excavator)/ manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including taking out the excavated soil and depositing and refilling of jhiri with watering & ramming and disposal of surplus excavated soil as directed with in a lead of 50 meter. All kinds of soils | 81 | Cum. | 178 | ₹14,418 |
| 2 | Providing and laying in position cement concrete including curing, compaction etc. complete in specified grade excluding the cost of centering and shuttering - All work up to plinth level. 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size). | 14 | Cum. | 3,302 | ₹46,228 |
| 3 | Random Rubble stone masonry for with hard stone in foundation and plinth in Cement Sand mortar above 30 CM thick wall in: Cement Mortar 1:6 ( 1-Cement : 6-Sand). | 169 | Cum. | 2,838 | ₹4,79,622 |
| 4 | Random Rubble stone masonry with hard stone in superstructure above plinth level and upto five level above 30cm. thick walls in : Cement Mortar 1:6 ( 1-Cement : 6-Sand). | 169 | Cum. | 3,479 | ₹5,87,951 |
| 5 | Add extra for facing as per design and detailed specifications including additional cost of stones Course rubble facing Second sort. | 750 | Sqm. | 491 | ₹3,68,250 |
| 6 | Plaster on new surface on walls in cement sand mortar 1:4 including racking of joints etc. complete fine finish : 20mm thick . | 750 | Sqm. | 202 | ₹1,51,500 |
| 7 | Cement concrete flooring 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate) finished with a floating coat of neat cement including cement slurry, making of lines or groove etc complete but excluding the cost of nosing of steps etc. complete. 40mm thick with 20mm thick nominal size aggregate. | 225 | Sqm. | 277 | ₹62,325 |
| 8 | Painting with synthetic enamel paint of approved brand and manufacture to give an even shade : Two or more coats on new work | 750 | Sqm. | 69 | ₹51,750 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.22 MB
gangana.pdf
Tender Documents • 1.58 MB
BOQ_1018769.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .