Tender Value
₹6.3 Cr
EMD Value
₹12.6 L
Closing Date
25 Jun 2021, 12:00 pmClosed
Executive Engineer SYL WS Division Ambala
Executive Engineer SYL WS Division Ambala
Construction of RCC open trough from RD 19100 to 15335 of Ambala Drain including 04 bridges
2021_HRY_176028_1
22/06/2021
Open Tender
Civil Works
Item-rate/Agreement basic
365 days
Ambala
Please refer Tender documents.
2 documents required · 2 mandatory
₹20,000
Yes
₹12.6 L
Yes
20 Sept 2021
16 Jun 2021
25 Jun 2021
16 Jun 2021
25 Jun 2021
16 Jun 2021
Amount
Earth work in excavation by mechanical means (Hydraulic excavator)/manual over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead up to 50 m and lift up to 1.5 m, as directed by Engineer-in-charge. All kind of soil.
Excavating, supplying and filling of local earth (including royalty) by mechnical transport of all lead & lift including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, side of foundation etc complete.
Centering and Shuttering including strutting, propping etc. And removal of form work for: Retaning walls, return walls, walls (any thickness) including attcahed pilasters, buttresses, plinth and string course fillets, kerbs and step etc.
Centering and Shuttering including strutting, propping etc. And removal of form work for: Foundations, footings, bases for columns
Centering and shuttering including strutting, propping etc. and removal of form for Suspended Floors, Roofs, Landings, Balconies complete .
Providing and laying in position ready mixed plain cement concrete, with cement content as per approved deign mix and manufactured in fully automatic batching plant and transported to site of work in transit mixer for all leads, having continuous agitated mixer, manufactured as per mix design of specified grade for plain cement concret work, including pumping of R.M.C. from transit mixer to site of laying and curing, excluding the cost of centering, shuttering and finishing, including cost of curing, admixtures in recommended proportions as per IS: 9103 to accerlate/retard setting of concrete, improve workability without impairing strength and durability as per direction of the Engineer-in-charge.(Note :- Less cement used as per design mix is recoverable. However no extra payment shall be made if excess cement is used as per design mix). All works upto plinth level. M-15 grade plain cement concrete cum (cement content considered @ 240kg/cum)
Providing and laying in poistion machine batched and machine mixed design mix M-30 grade cement concrete for reinforced cement concrete work, using cement concrete as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforecement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer-in-charge. All work upto plinth level. Extra for providing richer mixes upto plinth and at all floor levels. (Note: Less cement used as per design mix is recoverable However no extra payment shall be made if excess cement is used as per deign mix). (Note:- Cement content considered in M-30 is @ 340 kg/cum)
Providing and laying in poistion machine batched and machine mixed design mix M-30 grade cement concrete for reinforced cement concrete work, using cement concrete as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforecement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer-in-charge. All work above plinth level up to floor IV level. Extra for providing richer mixes upto plinth and at all floor levels. (Note: Less cement used as per design mix is recoverable However no extra payment shall be made if excess cement is used as per deign mix). (Note:- Cement content considered in M-30 is @ 340 kg/cum)
Steel reinforcement for R.C.C. work, where not included in the complete rate of RCC, including straightening, cutting, bending, placing in position, binding, wastage, overlaps, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire etc. complete in all respect below plinth level Note:- Reinforcement shall be measured in length including hooks, if any, separately for different diameters as actually used in work , excluding overlaps. Wastage, overlaps, couplings, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire or other methods of binding & placing shall not be measured and cost of these items shall be deemed to be included in the rates for reinforcement. Thermo-Mechanically Treated bars of grade FE-500 D or more.
Providing and placing in poistion suitable PVC water stoper Seal 225 mm wide (8-11 mm thick)
Brick Work with common burnt clay non modular bricks of class designation 7.5 in foundation and plinth in: Cement Mortar 1:4 (1 cement : 4 coarse sand)
Brick Work with common burnt clay non-modular bricks of class designation 7.5 in superstructure above plinth level up to floor IV level in all shapes and size in: Cement Mortar 1:4 (1 cement : 4 coarse sand)
12 mm cement plaster of mix: 1:3 (1 cement: 3 fine sand)
Demolishing brick work manually/ by mechanical means including stacking of servicable material and disposal of unserviceable material within 50 meter lead as per direction of Engineer-in-charge. In Cement Mortar
Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 meters lead as per direction of Engineer-in-charge. Nominal concrete 1:2:4 or leaner mix (i/c equivalent cum design mix).
Demolishing R.C.C work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 meters lead as per direction of Engineer-in-charge
Providing, lowering, laying, cutting (cut surface to be uniformly finished), jointing with rubber rings marked with IS: 5382 and testing of SPIGOT AND SOCKETTED RCC, NP-2 MARKED WITH IS: 458-1988 and specials into trenches for all depths including carriage, loading, unloading, stacking, handling, re-handling etc. complete is all respects to the satisfaction to the Engineer- in- charge. 300 mm dia.
Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in poistion and applying a priming coat of approved steel primer using structural steel etc as required. In grating, frames, guard bar,ladder, railing, brackets, gates and similar works.
Painting on Steel Surface Providing and applying two coats of ready mix paint approved brand on steel surface after through cleaning of surface to give an even shade
Pile dia 500 mm Bored cast-in-situ M-35 grade RCC, pile using Hydraulic Rig excluding reinforecement complete as per drawing and technical specification and removal of excavated earth with all lifts and lead upto 1000 m MORT&H clause 1100 & 1700.
Removing hume pipe- NP-2/NP-3/NP-4 including excavation and taking out the pipes manually/ by mechanical means and stacking the pipes within standard leads as per direction of Engineer-in-charge. Up to 600 mm dia
Credit of NP-2 300 mm dia pipe
Credit of dismantled Brick Work
Credit of old Steel Scrape
TEJWANT RAI GOVT CONTRACTOR
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.PDF
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .