Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.1 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹7.1 L+₹2,236.18 (0.32%)Rejected-AOC K K PATHY POST 678101 | L2 | Rejected-AOC L2 | |
| 3 | L3₹7.1 L+₹7,404.03 (1.05%)Rejected-AOC | L3 | Rejected-AOC L3 | |
| 4 | L4₹7.2 L+₹9,471.26 (1.34%)Rejected-AOC | L4 | Rejected-AOC L4 | |
| 5 | L5₹7.2 L+₹18,776.20 (2.66%)Rejected-AOC | L5 | Rejected-AOC L5 |
| Sl No | Description | Qty | Unit | manoj.k L1 | TOMEY RAPHAEL L6 | SIVADAS C L5 | Rahulan C L4 | Mani PWD Contractor L2 | SURESH M L3 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00Modernization of field channel offtaking from 29/000 Km of Kunnamkattupathy main canal. | |||||||||
| 1.00 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 36.74 | cum | 245.68 ₹9,026.53 Lowest | 280.58 ₹10,308.79 | 252.16 ₹9,264.61 | 248.93 ₹9,145.94 | 246.41 ₹9,053.35 | 248.21 ₹9,119.48 |
| 1.00 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size) | 36.74 | cum | 5,418.16 ₹1,99,068.62 Lowest | 6,187.65 ₹2,27,340.45 | 5,560.96 ₹2,04,315.23 | 5,489.56 ₹2,01,691.92 | 5,434.03 ₹1,99,651.7 | 5,473.69 ₹2,01,108.84 |
| 1.00 | 4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns | 450.34 | sqm | 263.74 ₹1,18,772.67 Lowest | 301.98 ₹1,35,993.67 | 270.7 ₹1,21,907.04 | 267.22 ₹1,20,339.85 | 264.52 ₹1,19,123.94 | 266.45 ₹1,19,993.09 |
| 1.00 | 4.1.5:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 44.48 | cum | 5,852.72 ₹2,60,328.99 Lowest | 6,683.93 ₹2,97,301.21 | 6,006.97 ₹2,67,190.03 | 5,929.84 ₹2,63,759.28 | 5,869.86 ₹2,61,091.37 | 5,912.71 ₹2,62,997.34 |
| 1.00 | 5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size | 1.08 | cum | 7,163.83 ₹7,708.28 Lowest | 8,181.24 ₹8,803.01 | 7,352.63 ₹7,911.43 | 7,258.23 ₹7,809.86 | 7,184.81 ₹7,730.86 | 7,237.25 ₹7,787.28 |
| 1.01 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 96.24 | kilogram | 76.78 ₹7,389.31 Lowest | 88.48 ₹8,515.32 | 78.81 ₹7,584.67 | 77.8 ₹7,487.47 | 77.01 ₹7,411.44 | 77.58 ₹7,466.3 |
| 1.01 | 4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size) | 7.72 | cum | 6,308.16 ₹48,705.3 Lowest | 7,204.06 ₹55,622.55 | 6,474.41 ₹49,988.92 | 6,391.29 ₹49,347.15 | 6,326.64 ₹48,847.99 | 6,372.82 ₹49,204.54 |
| 1.01 | 13.16.1:6 mm cement plaster of mix:1:3 ( 1 cement : 3 fine sand) | 241.22 | sqm | 216.72 ₹52,277.2 Lowest | 248.28 ₹59,890.1 | 222.43 ₹53,654.56 | 219.58 ₹52,967.09 | 217.36 ₹52,431.58 | 218.94 ₹52,812.71 |
| 1.01 | 2.25:Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m. | 12.89 | cum | 204.9 ₹2,641.98 | 200.43 ₹2,584.34 Lowest | 223.25 ₹2,878.59 | 220.38 ₹2,841.58 | 218.15 ₹2,812.83 | 219.74 ₹2,833.33 |
Tender Value
₹10.3 L
EMD Value
₹25,845
Closing Date
8 Jul 2025, 5:00 pmClosed
Assistant Executive Engineer
O/o Office of the Assistant Executive Engineer, Irrigation Sub Division III Chittoor
GENERAL CPP KKPS CADA 2025 26 Modernization of field channel offtaking from Ch 29 000 km of Kunnamkattupathy main Canal General Civil Work
2025_Irrig_773088_1
IRR/PI/TR/3225/2025_5_1_1/1
Open Tender
Civil Works - Canal
Item Rate
365 days
KUNNAMKATTUPATHY
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,760
Yes
₹25,845
Yes
2 Sept 2025
1 Jul 2025
10 Jul 2025
1 Jul 2025
8 Jul 2025
1 Jul 2025
Amount
Modernization of field channel offtaking from 29/000 Km of Kunnamkattupathy main canal.
2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil
4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size)
4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns
4.1.5:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)
5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size)
13.16.1:6 mm cement plaster of mix:1:3 ( 1 cement : 3 fine sand)
2.25:Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m.
Mani PWD Contractor (BID ID -2243668)
SURESH M (BID ID -2241912)
Rahulan C (BID ID -2244401)
SIVADAS C (BID ID -2244305)
TOMEY RAPHAEL (BID ID -2243640)
Bidder Name
TOMEY RAPHAEL
SIVADAS C
Mani PWD Contractor
manoj.k
Rahulan C
SURESH M
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1262406.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .