Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.7 LAccepted-AOC AT MAHUABHATTA PO NUAPADA BLOCK NUAPADA DIST NUAPADA ODISHA PIN 766105 | NUAPADA | NUAPADA | ODISHA | 766105 | ₹5.7 L | L1 | Accepted-AOC Accepted |
| 2 | L1₹5.7 LRejected-AOC | ₹5.7 L | L1 | Rejected-AOC Reject |
| 3 | L1₹5.7 LRejected-AOC | ₹5.7 L | L1 | Rejected-AOC Reject |
| 4 | L1₹5.7 LRejected-AOC AT MAIN ROAD PO LAMTAPUT PS LAMTAPUT DIST KORAPUT PIN 764081 | KORAPUT | ODISHA | 764081 | ₹5.7 L | L1 | Rejected-AOC Reject |
| 5 | L1₹5.7 LRejected-AOC AT MAHUABHATA TANWAT PO PS NUAPADA DIST NUAPADA ODISHA PIN 766105 | NUAPADA | NUAPADA | ODISHA | 766105 | ₹5.7 L | L1 | Rejected-AOC Reject |
Tender Value
₹5.7 L
EMD Value
₹5,700
Closing Date
10 Feb 2026, 5:00 pmClosed
Executive Engineer
O/o the S.E.R.W.Division,Nuapada
S/R to Saliha to Tongopani Part-II Road for the year 2025-26
2026_CERWI_125444_15
RWNPD-10(Online) 2025-26
National Competitive Bid
Civil Works - Roads
30 days
NUAPADA
As per DTCN
2 documents required · 2 mandatory
₹4,000
₹5,700
Yes
17 Apr 2026
3 Feb 2026
11 Feb 2026
3 Feb 2026
10 Feb 2026
3 Feb 2026
3 Feb 2026 - 9 Feb 2026
Earth work in excavation of foundation in hard soil with all leads and lift including rough dressing breaking clods and leveling bed and depositing the excavated materials away from the working area etc. complete as directed E.I.C.
P.C.C.( 1:3:6 ) in foundation using 40 mm size H.G. metal well rammed with cost, conveyance, royality, taxes of all materials and all labour, T&P, etc. complete.
Construction of un-reinforced plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M-30 (Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the form work as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction, expansion and construction joints, applying sealant, admixtures as approved, curing of concrete slabs for 14-days, curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification as per direction of the Engineer-in-Charge.
Please Enable Macros to View BoQ information
stage.html
html • 0.11 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.77 MB
BOQ_579059.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid