Tender Value
₹85.1 L
EMD Value
₹85,500
Closing Date
28 Oct 2026, 6:00 pm
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Executive Engineer, Panchayat Road and Building Division, Morbi
Construction of Samtherva to Nagalpar Road KM. 0/0 To 2/30 (Non Plan), Taluka: Wankaner, Dist: Morbi (Under MMGSY (BUJ) Yojna Year 2022-23) (Remaining Work)
354832
85/2026
Open
Civil - All
Works
Morbi
12 documents required · 12 mandatory
₹2,400
Executive Engineer, Panchayat Road and Building Division, MORBI
₹85,500
14 Oct 2026
14 Oct 2026
14 Oct 2026
28 Oct 2026
14 Oct 2026
Name of Work :- Construction of Samtherva to Nagalpar Road KM. 0/0 To 2/30 (Non Plan),
Taluka: Wankaner, Dist: Morbi (Under MMGSY (BUJ) Yojna Year 2022-
23) (Remaining Work)
Memorandum showing items of works to be carried out
Item Quanties Estimated Item of work Estimated Rates Unit Total amount
Item Quanties Estimated Item of work Estimated Rates Unit Total amount
No. but may be more or In Figure In Words. according to
less. Rs. Ps estimated
1 0.000 Hect Clearing and Grubbing road length 32361.26 Rupees Thirty One quantieis.
including uprooting wild vegetation, Two Thousand
grass bushes, shrubs, saplings and Sixty One and
trees girth up to 300 mm removal of Paise Twenty Six
stumps of trees cut earlier and only
disposal of unserviceable materials
and stacking of serviceable
materials to be use of ouctioned
upto all lead. including removal and
disposal of top organic soil for all
thickness. (c) By Mechanical means
in area of light Jungle.
2 14.570 Cum Earthwork for embankment 160.25 Rupees One One
including breaking clods, dressing Hundred Sixty
and Paise Twenty
etc complete with all lead and lift Five only metre
(Excluding watering and
consolidation) (A) From Borrow
Area with in all lead and lift.
3 32.400 Cum Earthwork in cutting in all sorts of 69.36 Rupees Sixty One
soil and soft murrum including Nine and Paise
Thirty Six only
conveying and pulling the stuff, in metre
spoil bank maintaining minimum
distance of five meter between top
edge of cutting and top of soli bank.
4 31.140 Cum Rolling & watering of earthwork in 18.68 Rupees One
layers with vibratory roller including Eighteen and
Paise Sixty Eight
filling in depressions which occur only metre
during the process as directed.
5 0.550 Cum Box Cutting the road surface to 69.36 Rupees Sixty One
proper slope and camber for making Nine and Paise
Thirty Six only
a base for road work including metre
removing the excavated stuff and
depositing on the road side slope as
directed upto all lead.
6 2196.000 Cum Providing and Laying granular sub- 648.59 Rupees Six One
base Grade-I C.B.R. not less than Hundred Forty
Eight and Paise
30% by providing coarse graded Fifty Nine only metre
matrerial.consisting of B.T. crushed
stone aggregates 53 mm to 26.5 mm
20%,2.36 mm to below @ 30%
coarse sand combination and stone
dust/grit spreading in uniform layers
with motor grader on prepared
surface, mixing by mix in Place
method with rotovator at O.M.C. to
required dry density including filling
the depressions which occred during
the process using vibratory roller 8-
T to 10-T complete as per Clause-
7 2136.700 Cum Providing, laying, spreading and 867.23 Rupees Eight One
compacting stone aggregates of 40 Hundred Sixty
Seven and Paise
to 63mm size with all lead to water Twenty Three only metre
bound macadam (W.B.M.)
specification including spreading in
uniform thickness, hand packing,
rolling with smooth wheel roller 80-
100 kN in siages to proper grade
and camber applying and broming,
stone screening / binding materials
to fill up to interstices of course
aggregate, watering and compacting
to the required density grading as
per Technical Specification Clause
405. By Mechinary Means
8 575.000 MT Providing and laying Built up spray 1975.10 Rupees One One
grout 37 50mm thick using asphalt Thousand Nine
Hundred Seventy
grade VG-30 & Emulsion RS-1 for Five and Paise Ton
tack coat at the rate of 2.50 Kg / 10 Ten only
sqmt on existing B.T. Surface and
using B.T. chips for required
gradation with the asphalt of grade
VG-30 at the rate of 1.99% i.e.
19.90 Kg / Mt by weight of mix
including heating and mixing in
drum mix plant, transporting the mix
and spreading the same by paver
finisher and consolidation as per
MOST specification including cost
of all materials, fuel, labours, tools,
and plants etc using contractor's own
drum mix plant etc complete.
9 403.000 MT Providing laying and rolling of 2799.73 Rupees Two One
25mm thick VG-30 open graded Thousand Seven
premix bitumenous carpet with B.T. Nine and Paise Ton
aggregate as specified and using Seventy Three
Emulsion RS-1 for tack coat at the only
rate of 2.50kg/10smt on B.T. (As
per IRC-16) and using bitumen for
mixing with aggregate at the rate of
3.36% i.e. 33.60 Kg MT of total
mix including heating and mixing in
drum mix plant, spreading the same
with paver finisher and
consolidation with vibratory roller
including necessary firewood, oil,
lubricants labour charges etc. using
equipments, tool etc. completed in
accordance with the requirement of
10 210.000 MT Providing and laying Seal Coat with 3192.56 Rupees Three One
B.T. aggregate as specified using Thousand One
aggregate at the rate of 0.18 Two and Paise Ton
Cum./10 Sqm. and bilumen for Fifty Six only
mixing with aggregate at the rate of
4.50% i.e. 45 Kg./M.Ton. of total
mix including heating and mixing in
drum mix plant and spreading the
same by paver finisher and
consolidation with vibratory roller
including necessary using
contractor's own drum mix plant,
machineries and equipment, tools
etc. complate in accordance with the
requirement of specification.
11 0.200 Cum Disnentaling the existing structure 590.70 Rupees Five One
including removing and stacking the Hundred Ninety
and Paise Seventy
dismentelled materials as and where only metre
directed for R.C.C. work
12 29.650 Cum Excavation for foundation up to all 161.20 Rupees One One
Depth including sorting out and Hundred Sixty
stacking of useful malerials and Twenty only metre
disposing of the excavated stuff up
to all lead in Dense or Hard soil
13 18.040 Cum Excavation for foundation up to all 274.67 Rupees Two One
Depth including sorting out and Hundred Seventy
stacking of useful materials and Sixty Seven only metre
disposing of the excavated stuff up
to Jall lead in Hard murrum.
14 42.450 Cum Providing and filling in foundation 2216.45 Rupees Two One
with ordinary cement concrete M- Thousand Two
Hundred Sixteen
100 mix and providing necessary and Paise Forty metre
vertical pin headers incl Formwork, Five only
vibrating, ramming and curing
complete as directed
15 476.600 Cum Providing and casting in situ 2823.76 Rupees Two One
ordinary cement concrete M-150 Thousand Eight
mix and providing necessary pin Three and Paise metre
headers including shuttering, Seventy Six only
scaffolding, laying vibrating, curing
and finishing complete. Without V -
Grooves upto all height as directed.
16 50.300 Cum Providing and casting in situ 3905.82 Rupees Three One
controlled cement concrete M-200 Thousand Nine
Hundred Five and
for average 150 mm thick wearing Paise Eighty Two metre
coat laid as directed including only
lamping, vibrating, finishing, curing
and filling in joints with bitumen
17 0.620 Cum Providing and casting in situ 4923.75 Rupees Four One
controlled trimix cement concrete M- Thousand Nine
300 for avg. 200mm thick road Three and Paise metre
work laid as directed included Seventy Five only
providing and laying MS side rail of
road thickness with necessary nut
bolts pristes fixing as per width
applying plate vibrator (Electric or
Diesel) on channel compressor with
vacume dewatering system by using
all necessary equipments and
materials and machinery such as
stock hardner powder and
machinery such as running cred
vibrator on prepared M.S. Channe
for levelling Vacumme pump
floating and power trovelling etc
with filling the joints with bitumen
as directed etc complete
18 4.043 MT Providing and fixing in position FE 71278.13 Rupees Seventy One
500/500D TMT bar reinforcement One Thousand
including cutting, bending and tying Seventy Eight and Ton
complete as per detailed drawings Paise Thirteen
(A Solid Slab / App. slab / Wearing only
Coat (B) Pier (C) Abutment (D)
RCC Return & Wall/caps/Coping
19 0.000 Rm Supplying, fixing and joining 682.59 Rupees Six One
reinforced concrete heavy duty non- Hundred Eighty
pressure pipe carrying indian Fifty Nine only metre
railway standard with collars for
culverts carrying heavy traffic as per
Indian railway standard
specification including setting and
joining the pipe in cement mortar
1:2 watering or laying (to level or
slopes) of I.S. class NP3 300mm dia
20 30.000 Rm Supplying and lixing reinforced 6267.87 Rupees Six One
concre.e heavy duly non-pressure Thousand Two
pipes with collars for culverts Seven and Paise metre
carrying heavy traffic as per IS 458- Eighty Seven only
1991 specifications including setting
the pipes in C.M 1.2 watering and
laying (to level or slopes) of class
NP3 of internal daimete's 1200 mm
dia.with all lead and lift as directed.
21 376.000 Cum Filling available excavated earth 88.86 Rupees One
(excluding rock) in trenches, plinth, Eighty Eight and
Paise Eighty Six
sides of foundation etc layers not only metre
exceeding 20 cm in depth
consolidating each deposited layer
by ramming and watering.
22 9.000 No Providing and fixing Hectometer as 295.88 Rupees Two One
per 4.R.C type design including Hundred Ninety
painting lettering etc complete (ii) Eighty Eight only
fixing in Cement concretc 1:5:10.
23 168.000 No Providing and fixing guard stone as 65.76 Rupees Sixty One
per I.R.C. type design including Five and Paise
Seventy Six only
white wasins etc. complete (1)
Fixing in earth.
24 3.000 No Providing and fixing ordinary 515.41 Rupees Five One
Kilometer stone of precast CC. 12.4 Hundred Fifteen
and Paise Forty
including necessary reinforcement One only
as per IRC type design in C.C 1:4
including painting lettering etc
25 103.000 No Providing and Fixing indicator stone 281.04 Rupees Two One
of approved stone as per IRC type Hundred Eighty
design in CC 4:8 including white Four only
washing etc. complete (in) Fixing in
26 3.000 No Supplying and foung Junction Board 5453.10 Rupees Five One
of MS plates and angles as per IRC Thousand Four
design including fixing in C.C.1:4:8, Three and Paise
with necessary excavation, painting Ten only
figuring and lettering on board etc.
27 2.000 No Providing and fixing Village Name 3773.26 Rupees Three One
board as per Standard IRC type Thousand Seven
Hundred Seventy
design of steel plate including Three and Paise
painting lettering etc complete with Twenty Six only
fixing in C.C 1:4 8 block with
necessary excavation.
28 16.000 No Supplying and fixing road sign 3356.49 Rupees Three One
board of M.S.plates and angle iron Thousand Three
Hundred Fifty Six
including painting, lettering etc. and Paise Forty
complete including fixing in CC 148 Nine only
with necessary excavation etc
complete as per IR C. type design.
(ii) Reflective type.
29 2.000 No Informatory Signs:-Providing and fixing 3375.58 Rupees Three One
sing boards made out of 2mm aluminum Thousand Three
Hundred Seventy
sheet: size 90 x 60cms rectangle as per
the design of IRC-67-1977 pre treated
Fifty Seven only
with phospheting process & acid
teching; coated with one coat of
epoxyprimer and two coats of best
qualityepoxy paint; reflectorised with
retro refiective sheeting as per latest
M.O.ST Specifications; 3.1m long stand
postand frame fabricated from suitable
sizeiron angle of 35 x 35 x
3mm75x75x6mm as required; painted
with best qualityepoxy coatings lin
black and whitebends. the details of
symbol for eachboard shall details of
symbol for eachboard shall be as per the
instruction ofengineer in charge. The
fixing at site shall be in 1:2:4 CC block
of size 45 >45 x 60cms. for each leg.
including excavation curing tec.
complete under the supervision of
engineer in charge (A) Engineer Grade
30 2.000 No Proading and Firing Flood Guage 1164.70 Rupees One One
Post mark of "C" channle angle size Thousand One
100mm x 50mm x 5mm thick (in Four and Paise
head wall 0.500 Mt and 1 50 MI Seventy only
outside with painting and lettering
with radium color as direcle.
31 2.000 No Cautionary Warning Sign :- Providing 3341.64 Rupees Three One
and fixing sing boards made out of 2min Thousand Three
a uminun: sheet; size 90 x 90 x 190 cms,
equilateral triangle as per design of IRC-
Sixty Four only
67-1977. Pre treated with phospheling
process & acid etching; coated with one
coat of epoxy primer and two coats of
best quality epoxy paint reflectorised
with retro reficctivesheeting as per latest
M.O.S.T.Specifications; 3.1m long
stand postand frame fabricated from
suitable sizeiron angle of 35 x 35 x
3mm, 75 x 75 x 6mm as required;
painted with bestquality epoxy coatings
lin black andwhite bends. The details of
symbol foreach board shall be as per
theinstruction of engineer in charge. The
lixing at site shall be in 1:2:4 CC blocko
size 45 x 45 x 60 Cms. for leach
leg.including excavation, curing
etc.complete uncer the supervision of
engineer in charce (A) Engineer Grade.
32 0.000 Rm Providing temporary diversion 200.99 Rupees Two One
suitable for traffic during the Hundred and
Paise Ninety Nine
construction period of the bridge/cd only metre
works by levelling existing ground
and supplying and spreading quarry
spall in layers etc. complete. As
Rupees Eighty Five Lakh Thirteen Thousand Three Hundred Ninety and Paise Eighteen
I \ We am \ are willing to carry out the work at ……………………… % above \ bellow percent ( Should be
written in figures and words ) of the estimated rate mentioned above. Amount of My \ Our tender works put as
* Estimated Amount * Estimated Amount
Put to tender Rs…………………… Put to tender Rs……………………
Deduct……..……..% Belowe Rs…………..….……. Add……..……..% Above Rs…………..….…….
In words………………….……………… In words………………….………………
Note 1 All works shall be carried out as Public Works Department Handbook and other specifications of Division or
:- as directed.
GM\W ! AW] H SFD AF\WSFD lJEFU GL 5]:TLSF VG[ 0LJLhGGL ALHL BF; lJUT D]HA ;]RGF 5|DF6[ SZL VF5JFG]\ ZC[X[P
Note 2 All the columns in Schedule-B should be filled in Ink and the total of the entries in the last column should be
:- struck by the contractor under his singnature.
GM\W Z VG];]RLDF\ AWF BFGFGL lJUTM ;CLYL EZJL VG[ K[<,F BFGFGL GM\WMGM ;ZJF/M SZL SMg8=FS8Z[ 5MTFGL ;CL SZJLP
Note 3 Rules Quoted include clearance of site ( Prior commencement of work and at its close) respect and hold
:- good for work under all condition, site, moisture, weather etc.
GM\W # 8F\S[,F NZDF\ :Y/GL sSFD VFZ\E[ VG[ 5]Z] YFI T[ JBT[ f NZ[S ZLT[ ;FO;]OL SZJFGM ;DFJ[X YFI K[P VG[ T[ NZ TDFD
Note 4 5lZl:YlT4
be continued lJU[Z[ C[9sheets,if
on additional / SFD DF8[found
GM\W $ H~Z H6FI tIF\ JWFZFGF SFU/M HM0L RF,] ZFBJ]P
Signature of Contractor
Deputy Executive Engineer Executive Engineer
Panchayat R.& B. Sub Division Panchayat R.& B. Division
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
1 B-1 Samtherva nagalpar Road Remaining Work.pdf
2 specification Samtherva Nagalpar Compress.pdf
3 Sch -B.pdf
4 Circular Compress.pdf
5 Qty Sheet Samtherva.pdf
6 Cement Steel Asphalt Con.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .