Loading…
Loading…
Tender ID
Tender Value
₹5.8 Cr
EMD Value
₹5.8 L
Closing Date
1 Apr 2026, 6:00 pmClosed
Deputy Municipal Commissioner, Gandhinagar Municipal Corporation – Gandhinagar
Construction of RCC Road At Indroda Village Under GMC Area, Gandhinagar
287354
179 of 2025-26
Open
Civil - All
Works
Gandhinagar
3 documents required · 3 mandatory
₹14,160
Deputy Municipal commissioner Gandhinagar Municipal Corporation, Gandhinagar
₹5.8 L
17 Mar 2026
17 Mar 2026
17 Mar 2026
1 Apr 2026
17 Mar 2026
Name of Work: Construction of RCC Road At Indroda Village Under GMC Area, Gandhinagar
BILL OF QUANTITY
SR.No Item Description Unit Qty Rate in Figure Rate in Wors Amount
Demolition including stacking of serviceable materilas Rupees One
and disposal of unserviceable materials with all lead Thousand One
1 and lift. (i) R.C.C. work cu.m 6,991.50 1110.75 Hundred Ten
Box cutting the road surface to proper slope and
camber for making a base for road work including
2 removing the excavated stuff and depositing on the cu.M 10,487.25 109.24
road side slope as directed up to 50 meters lead. FOUr Only
Providing and laying cement concrete 1:3:6 (1-Cement : Rupees Three
3- coarse sand : 6- hand broken stone aggregates 40 Thousand Two
3 mmnominal size) and curing complete including cost of cu.M 5,243.64 3233.01 Hundred Thirty
formwork in (A) Foundation and Plinth Three Paise One
Providing TMT Bar FE 415 reinforcement for R.C.C work
4 including bending,biding and placeing in position Kg. 98,777.73 68.33 eight Paise Thirty
complete up to floor two level. Three Only
Providing and Laying M -250 Controlled Cement
Concrete Road Trimix Vaccum Dewatering System with
providing and fixing & Removing of "C" Channel as per Rupees Four
required level slopeand thicknessof concrete and Thousand Four
5 leveling and finishing the concreteusing surface cu.M 5,243.64 4495.51 Hundred Ninty
vibrator , power floater and trowel light brooming on Five Paise Fifty
as directed including making joint using concrete cutter One Only
machine and Filling joint With Bitumen etc, Complete.
Earthwork in cutting including preparing the slope and
camber andstacking or utilising the cutting stuff in bank Rupees Five
6 as directed upto 200 Meters from the end of cutting cu.M 3,381.84 500.04 Hundred Paise
with all lead and lift.(i) Hard murrum. Four Only
RCC precast M.H. frame & cover manufacture, supply &
Delivery at store or at site of work precast RCC M
Frame & cover suitable to drainage M.H. and as per
type design and drawing including cost of
reinforcement M.S. Angles or Flate, curring mold work
Frame suitable for 50cm opening of MH
A Nos 100.00 1132.21 Hundred Thirty
Twenty One only
Cover suitable for 50 cm opening of MH (Heavy duty) Rupees One
Repairing damaged I.C/Raising Removing damaged Rupees One
brick work and repairing by brick masonary in C.M 1:5 Thousand Three
8 and Plaster in CM 1:3 and fixing C.I Step and existimg NO. 250.00 1355.42 Hundred Fifty
chamber sheet cover remoivng thedebris from Five Paise Forty
chamber and carting the same as directed Two Only
I / We am / are willing to carry out the work at __________% above / below __________ percentage (should be written in
Estimated Amount put to Estimated Amount put to
Deduct _________ % Below. Add _________ % Above.
Notes 1 - All work shall be carried out as per Public Works Department Handbook and other specifications of Division or as directed.
Notes 2 - All the columns in Schedule should be filled in ink and the total of the entries in the last column should be struck by the contractor
Notes 4 - To be continued on additional sheets, if found necessary .
I / We am / are willing to carry out the work at __________% above / below
__________ percentage (should be written in figures and words) of the
estimated rates mentioned above. Amount of my/our tender works out as under.
Estimated Amount put to Estimated Amount put to
Deduct _________ % Below. Add _________ % Above.
Notes 1 - All work shall be carried out as per Public
Works Department Handbook and other specifications of
Division or as directed.
Notes 2 - All the columns in Schedule should be filled in
ink and the total of the entries in the last column should
be struck by the contractor under his signature.
Notes 3 - Rates quoted include clearance of site (prior to
commencement of work and at its close ) in all respects
and hold good for work under all conditions, site,
moisture, weather etc.
Notes 4 - To be continued on additional sheets, if found
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
BOQ (2).pdf
CIVIL MAKE LIST (3).pdf
General Specification booklet.pdf
other specification.pdf
SBD.pdf
Specification (2).pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .