Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹48.9 LAccepted-AOC SHIDDHI ASHRAM SHIBPOLLI AGARTALA WEST TRIPURA TRIPURA | AGARTALA | WEST TRIPURA | TRIPURA | L1 | Accepted-AOC L1 | |
| 2 | L2₹56.4 L+₹7.5 L (15.3%)Rejected-AOC HOUSE OF SANJAY NAG TO HOUSE OF BIMAL BISWAS AIRPORT BOUNDARY | L2 | Rejected-AOC L2 | |
| 3 | L3₹56.7 L+₹7.8 L (15.9%)Rejected-AOC 2 D OFFICE LANE AGARTALA WEST TRIPURA | AGARTALA | WEST TRIPURA | TRIPURA | 799001 | L3 | Rejected-AOC L3 |
Tender Value
₹55.0 L
EMD Value
₹1.1 L
Closing Date
29 Sept 2026, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer, Div-II, AMC
O/O the Executive Engineer, Div-II, AMC
Development of road by R.wall and paver block from the H.O Kalipada Debnath to the H.O Nipendra Sarkar via main road at Lankamura Sharmalunga, under ward no.02, AMC
2026_SAMC_77083_1
32 /Div-II/AMC/2026-27
Open Tender
Civil Works
Percentage
120 days
Ward No.02, AMC
Please refer Tender documents.
4 documents required · 4 mandatory
₹4,000
₹1.1 L
19 Nov 2026
22 Sept 2026
29 Sept 2026
22 Sept 2026
29 Sept 2026
22 Sept 2026
90 days
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. | 271.02 | Cum | 231.6 | ₹62,767.54 |
| 2 | Supplying and filling in plinth, under floor, foundations etc. with sand (fine) from local quarry with all lifts including spreading in horizontal layers, watering, grading to required slope, ramming, consolidating and compacting each layer by using plate compactor or by any suitable method
complete. | 108.42 | Cum | 1,177.3 | ₹1,27,645.22 |
| 3 | Providing and laying in position cement concrete of
specified grade excluding the cost of centring and
shuttering --All work upto plinth level: 1:3:6 ( 1 Cement: 3 fine sand : 6 graded well burnt brick
aggregate 20 mm nominal size) | 38.92 | Cum | 9,938.6 | ₹3,86,830.19 |
| 4 | Providing and laying in position specified grade of
reinforced cement concrete excluding the cost of
centring, shuttering, finishing and reinforcement--All work upto plinth level: 1:1½:3 ( 1 Cement: 1½ fine sand : 3 graded stone aggregate 20 mm nominal size) | 63.28 | Cum | 12,073.8 | ₹7,64,030.06 |
| 5 | Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or
more | 7,593.6 | Kg | 103.9 | ₹7,88,975.04 |
| 6 | Centering shuttering including struttings, propping etc. and removal of form work for: Lintels, beams, plinth beams, girders, bressumers and
cantilevers with shuttering ply | 112.8 | Sqm | 499.4 | ₹56,332.32 |
| 7 | Centering shuttering including struttings, propping etc. and removal of form work for: Columns, Pillars, Piers, Abutments, Posts and Struts with
shuttering ply | 104 | Sqm | 625.6 | ₹65,062.4 |
| 8 | First class brick work in foundation and plinth including cost of all materials as required complete. In cement mortar 1 : 4 (1 cement : 4 fine sand). | 179.92 | Cum | 9,845.2 | ₹17,71,381.86 |
| 9 | 12 mm cemen plaster of mix Cement mortar 1:4 (1 cement : 4 fine sand). Neat cement punning. | 696.53 | Sqm | 281 | ₹1,95,724.93 |
| 10 | Providing and laying dry flat brick flooring in required pattern complete. | 193.5 | Sqm | 701.2 | ₹1,35,682.2 |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_78463.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.38 MB
DNIet32.pdf
Tender Documents • 2.89 MB
BOQ_78463.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .