Tender Value
₹3.0 Cr
EMD Value
₹16.9 L
Closing Date
25 Sept 2026, 12:00 pm3d left
S.E. Sitapur/Kheri Circle, U.P.P.W.D
OFFICE OF SUPERINTENDING ENGINEER, SITAPUR/KHERI CIRCLE, PWD, SITAPUR
New construction of the Raipur (Revenue Village Dulhi) link road. (Dhaurahara)
2026_CEUCZ_1186325_5
4070/352C/ETENDER/2026 Dated 25.08.2026
Open Tender
Civil Works - Roads
Fixed-rate
365 days
LAKHIMPUR KHERI
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,715
₹16.9 L
Yes
OFFICE OF SUPERINTENDING ENGINEER, SITAPUR/KHERI C
16 Sept 2026
16 Sept 2026
25 Sept 2026
16 Sept 2026
25 Sept 2026
16 Sept 2026
18 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Construction of embankment with approved material obtained from availble land as permitted and approved by Engineer-in-Charge and as per Technical Specitaion Clause 301.3.4.1, with all lifts and leads, spreading, grading to required slope and compacti | 15,000 | Cum | 62 | ₹9,30,000 |
| 2 | Excavation for road work in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the em | 166 | Cum | 37 | ₹6,142 |
| 3 | Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired den | 575 | Cum | 5,095 | ₹29,29,625 |
| 4 | Providing, laying and spreading Material on a prepared sub grade adding cement @2% by weight to the spread material manually mixing in place with rotavator and compacting with the road roller at OMC to achieve the desired unconfined compresive strength and to form a layer of subbase. | 866 | Cum | 5,570 | ₹48,23,620 |
| 5 | Providing, laying and spreading Material on a prepared sub base cement @4% by weight to the spread material manually mixing in place with rotavator and compacting with the road roller at OMC to achieve the desired unconfined compresive strength and to form a layer of base.(WMM) | 1,080 | Cum | 5,751 | ₹62,11,080 |
| 6 | Providing ,Laying ,spreading and compacting stone aggregates of 53-22.4 mm size to water bound macadam specification including spreading in uniform thickness , hand packing ,rolling with Smooth wheel roller 80-100 KN in stages to proper grade and camber ,applying and brooming ,Stone screening to fill up the nterstices of coarse aggregate ,watering and compacting to the required density | 180 | Cum | 6,109 | ₹10,99,620 |
| 7 | Providing and applying tack coat with VG-10 using Bitumen distributor at the rate of 0.35 kg per sqm on the prepared surface cleaned with hydraulic broom . | 11,666 | sqm | 24 | ₹2,79,984 |
| 8 | Providing laying & rolling of open graded premix carpet of 20 mm thickness composed of 13.2mm to 5.6 mm aggregates either using penetration grade bitumen or emulsion to required line ,grade and level to serve as wearing course on a previously prepared base including mixing in a suitable plant ,laying and rolling with a three wheel 80-100 KN static roller capacity finished to required level and grades to be followed by seal coat. | 11,666 | sqm | 239 | ₹27,88,174 |
| 9 | Providing and laying seal coat 'C' Type sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall . | 11,666 | sqm | 94 | ₹10,96,604 |
| 10 | Construction of un-reinforced, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M 30 (Grade), coarse and fine aggregates conforming to IS: 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with construction joints, admixtures as approved, curing of concrete slabs for 14-days, curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501. | 336 | Cum | 9,350 | ₹31,41,600 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.97 MB
Tendernotice_2.pdf
PDF • 1.51 MB
BOQ_2232783.xls
BOQ • 0.25 MB
Corrigendumcd1LMP.pdf
PDF • 0.53 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .