Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.3 CrAccepted-AOC | ₹1.3 Cr | L1 | Accepted-AOC l1 |
| 2 | L2₹1.3 CrRejected-AOC | ₹1.3 Cr | L2 | Rejected-AOC l2 |
| 3 | L3₹1.4 CrRejected-AOC | ₹1.4 Cr | L3 | Rejected-AOC l3 |
| 4 | L4₹1.4 CrRejected-AOC VILL CHAKRAMNATH P O P S KULPI SOUTH 24 PARGANAS 743351 | KULPI | SOUTH 24 PARGANAS | WEST BENGAL | 743351 | ₹1.4 Cr | L4 | Rejected-AOC l4 |
| 5 | L5₹1.4 CrRejected-AOC UTTAR SONAKHALI NARAYANTALA BASANTI SOUTH 24 PARGANAS | BASANTI | SOUTH 24 PARGANAS | WEST BENGAL | ₹1.4 Cr | L5 | Rejected-AOC l5 |
| Sl No | Description | Qty | Unit | SILVER LINE ELECTRICALS L1 | M/S B M INDUSTRIES L2 | M/S. AVISIKTA L4 | TARUN ENTERPRISE L5 | RKS ENGINEER & CONTRACTOR L3 |
|---|---|---|---|---|---|---|---|---|
| 1.00Drawal of 33 KV UG Cable | ||||||||
| 1.01 | Survey of HT Cable Route & Submission of route survey drawing | 9.82 | KM | 2,907 ₹28,552.55 | 3,000 ₹29,466 | 3,000 ₹29,466 | 2,700 ₹26,519.40 | 3,000 ₹29,466 |
| 1.02 | Erection of 9M PCC Double Pole Structue with Complete fittings | 4 | Nos | 9,145 ₹36,580 | 20,500 ₹82,000 | 8,922 ₹35,688 | 8,922 ₹35,688 | 8,922 ₹35,688 |
| 1.03 | Erection of 33 KV , 900MM CD composite polymer Pin Insulator | 36 | NOS | 69 ₹2,484 | 75 ₹2,700 | 72 ₹2,592 | 72 ₹2,592 | 72 ₹2,592 |
| 1.04 | Erection of HT Stay Set | 32 | NOS | 621.13 ₹19,876.16 | 950 ₹30,400 | 641 ₹20,512 | 641 ₹20,512 | 641 ₹20,512 |
| 1.05 | Erection of Earthing Complete | 16 | NOS | 303.3 ₹4,852.80 | 750 ₹12,000 | 313 ₹5,008 | 313 ₹5,008 | 313 ₹5,008 |
| 1.06 | Excavation of Soil for formation of trial hole (1.0X0.5X1.2) as per instruction Site Engineer Including Backfilling of excavated soil | 6.6 | CUM | 149.23 ₹984.92 | 35 ₹231 | 72 ₹475.20 | 65 ₹429 | 54 ₹356.40 |
| 1.07 | Excavation of Soil for formation of cable trenches & Re-instatement of cable trenches with Excavated Soil as per instruction of Site engineer(single cable) | 3,344 | CUM | 149 ₹5.0 L | 35 ₹1.2 L | 134 ₹4.5 L | 128 ₹4.3 L | 100 ₹3.3 L |
| 1.08 | Supply of klin -burnt 1st class bricks having proper size & shape suitable for cable protective cover as per instruction of site engineer | 53,496 | Nos | 9.69 ₹5.2 L | 8 ₹4.3 L | 10 ₹5.3 L | 8.5 ₹4.5 L | 9 ₹4.8 L |
| 1.09 | Laying of Bricks as per drawing and instruction of site engineer | 53,496 | Nos | 1.09 ₹58,310.64 | 2 ₹1.1 L | 1.12 ₹59,915.52 | 1.12 ₹59,915.52 | 1 ₹53,496 |
Tender Value
Refer Docs
EMD Value
₹2.8 L
Closing Date
26 Dec 2025, 2:00 pmClosed
ACE AND ZONAL MANAGER, BURDWAN ZONE,WBSEDCL
Office of the Zonal Manager 2nd Floor, New Administrative Building Power House complex, Frazer Avenue Purba Burdwan 713101
DRAWAL OF 33KV UG CABLE LINE FROM PANAGARH INDUSTRIAL PARK 132/33KV SUB-STATION TO IJJATGANJ 33/11KV SUB-STATION UNDER DURGAPUR DIVISION, PASCHIM BARDHAMAN,WEST BENGAL.
2025_WBSED_960620_1
ZM/BDN/IJJATGANJ/25-26/1647
Open Tender
Miscellaneous Services
90 days
IJJATGANJ UNDER DURGAPUR DIVISION, WBSEDCL
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹2.8 L
BURWAN ZONAL OFFICE,WBSEDCL
30 Mar 2026
26 Nov 2025
30 Dec 2025
27 Nov 2025
26 Dec 2025
9 Dec 2025
5 Dec 2025
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.43 MB
BOQ_2316324.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid