Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹39.0 LAccepted-AOC | L1 | Accepted-AOC Below Rate | |
| 2 | L2₹39.6 L+₹59,889.83 (1.54%)Rejected-AOC | L2 | Rejected-AOC Below Rate |
Tender Value
Refer Docs
EMD Value
₹39,670
Closing Date
22 Apr 2025, 3:00 pmClosed
Block Development Officer(V.P)
Block Development Office, Thanthoni Block
Providing Cement Concrete, Threshing Floor, Cremation Shed and Pond H/O Kakkavadi Panchayat
2025_RDTN_546643_1
Thanthoni Block - AGAMT-II-2025-26
Open Tender
Civil Works
Item Rate
90 days
Thanthoni Block
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹39,670
17 Jun 2025
16 Apr 2025
22 Apr 2025
16 Apr 2025
22 Apr 2025
16 Apr 2025
Amount
1)Name of the Work : Providing cement Concrete Pavement in Sadaigoundanpudur Ist street (129m) in Kakkavadi Panchayat
Earth work excavation for foundation in all clauses of soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and boiling out water whenever necessary et complete complying with standard specification
Cement concrete 1:4:8 mix using 40mm iss HBG metal for foundation & flooring including labour charges etc., complete
Supplying ertecting and shuttering including necessary supports for plane surfaces in fondaion and basement and in all floors for slabs and beams complying with standard
Cement concrete 1:3:6 mix using 20mm iss HBG metal for foundation & flooring including labour charges etc., complete
Cement concrete 1:2:4 mix using 20mm iss HBG metal for foundation & flooring including labour charges etc., complete
Provision for Bitumen Pad
2)Name of the Work : Providing cement Concrete Pavement at Kullampatti - Rathinapuri Nagar Main Ist street H/O Kakkavadi Panchayat
Earth work excavation for foundation in all clauses of soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and boiling out water whenever necessary et complete complying with standard specification
Cement concrete 1:4:8 mix using 40mm iss HBG metal for foundation & flooring including labour charges etc., complete
Supplying ertecting and shuttering including necessary supports for plane surfaces in fondaion and basement and in all floors for slabs and beams complying with standard
Cement concrete 1:3:6 mix using 20mm iss HBG metal for foundation & flooring including labour charges etc., complete
Cement concrete 1:2:4 mix using 20mm iss HBG metal for foundation & flooring including labour charges etc., complete
Provision for Bitumen Pad
3)Name of the Work : Construction of Cremation shed , Compound wall (12m) with CC Road with Culvert (15m) and Water Supply in Samathuva sudugadu @ Melpasupathipalayam H/O Kakkavadi Panchayat
Earth work excavation for foundation in all clauses of soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and boiling out water whenever necessary et complete complying with standard specification
Cement concrete 1:4:8 mix using 40mm iss HBG metal for foundation & flooring including labour charges etc., complete
Brickwork in CM 1:5 using country bricks ground moulded 23x11x7 cm for the following including aving etc., complete
Supplying ertecting and shuttering including necessary supports for plane surfaces in fondaion and basement and in all floors for slabs and beams complying with standard
Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel grills for all RCC works as per design given including cost of steel and G.I. binding wire in all floors etc. complete complying with standard specification. (Contractor has to make his own arrangements for the supply of steel and binding wire)
Cement Concrete 1:1-1/2:3 (One Cement, One and a half crushed stone M.Sand and Three hard broken stone jelly) using 20 mm gauge hard broken granite stone jelly for all RCC items of works excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary and bearing surfaces of walls, beams etc. shall be finished smooth with Cement Mortar 1:3 (One Cement and Three M.Sand) and kraft paper laid over it without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers
Special ceiling plastering and finishing the exposed surface of all RCC items of work such as slabs, beams, sunshades, facia, canopy slab, staircase waist slab, landing slab etc., with Cement Mortar 1:3 (One Cement and Three M.Sand) 10mm thick including hacking the surfaces, providing cement mortar nosing, beading for sunshades, staircases, steps, landing slabs and curing, etc., in all floors complying with standard specification and as directed by the departmental officers
Plastering in cm 1:5 12 mm thick for superstructure complying with std specifications as directed etc complete
Painting two coats of newly plastered wall surface with ready mixed plastic emulsion paint of first class quality and of approved colour over a priming coat including thorough scrapping, clean removal of dirt, and including necessary plaster of paris putty, wherever required etc., complete complying with standard specification.
Cement concrete 1:2:4 mix using 20mm iss HBG metal for foundation & flooring including labour charges etc., complete
Sub Estimate : Construction of compound wall in Samathuva sudugadu
Earth work excavation for foundation in all clauses of soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and boiling out water whenever necessary et complete complying with standard specification
Cement concrete 1:4:8 mix using 40mm iss HBG metal for foundation & flooring including labour charges etc., complete
Cement concrete 1:3:6 mix using 40mm iss HBG metal for foundation & flooring including labour charges etc., complete
Brickwork in CM 1:5 using country bricks ground moulded 23x11x7 cm for the following including aving etc., complete
Supplying ertecting and shuttering including necessary supports for plane surfaces in fondaion and basement and in all floors for slabs and beams complying with standard
Plastering in cm 1:5 12 mm thick for superstructure complying with std specifications as directed etc complete
Painting two coats of newly plastered wall surface with ready mixed plastic emulsion paint of first class quality and of approved colour over a priming coat including thorough scrapping, clean removal of dirt, and including necessary plaster of paris putty, wherever required etc., complete complying with standard specification.
Sub Estimate : Providing CC pavement with Pipe Culvert in Samathuva Sudugadu
Earth work excavation for foundation in all clauses of soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and boiling out water whenever necessary et complete complying with standard specification
Cement concrete 1:4:8 mix using 40mm iss HBG metal for foundation & flooring including labour charges etc., complete
Cement concrete 1:3:6 mix using 20mm iss HBG metal for foundation & flooring including labour charges etc., complete
Supplying ertecting and shuttering including necessary supports for plane surfaces in fondaion and basement and in all floors for slabs and beams complying with standard
Laying for RCC 900mm chain of span pipe including cost and supply of materials in all labour charges etc complete
Cement concrete 1:2:4 mix using 20mm iss HBG metal for foundation & flooring including labour charges etc., complete
Cost and Supply and fixing of Bitumen bad charges
Sub Estimate : Providing For Water Supply Arrangements in Samathuva sudugadu
Supply of 63mm OD PVC pipe 4ksc Pipes including all charges etc
Supply of 50mm GI Pipes including all charges etc
Earth work excavation for foundation in all clauses of soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and boiling out water whenever necessary et complete complying with stand
Laying and Jonting of PVC and GI pipe intio the trench with proper grade and aligment (63mm OD PVC &
63mm OD PVC 4ksc Pipes
Labour Charges for Refilling of Pipe line trench with Excavated Earth
Provision for 500 Ltr Capacity HDPE tank
4)Name of the Work : Construction of Thresing Floor @ Kullamaptty H/o Kakkavadi Pt
Earth work excavation for foundation in all clauses of soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and boiling out water whenever necessary et complete complying with standard specification
Cement concrete 1:4:8 mix using 40mm iss HBG metal for foundation & flooring including labour charges etc., complete
Cement concrete 1:3:6 mix using 40mm iss HBG metal for foundation & flooring including labour charges etc., complete
Cost of centering MS sheets , MS angle , Silver Oak Joists and Casurina pumps for 10m2rough stone and bond stones with simultaneous pointing with same morter etc., completed
Refilling the basement with excavated earth including all labour charges for filling as per standard specification
Brickwork in CM 1:5 using country bricks ground moulded 23x11x7 cm for the following including aving etc., complete
Granolithick Floor Finishing in CC 1:2:4 mix using 10-12mm metal including cost and conveyance of all materials and all labour charges etc.,
Cement concrete 1:2:4 mix using 40mm iss HBG metal for foundation & flooring including labour charges etc., complete
Plastering in cm 1:5 12 mm thick for superstructure complying with std specifications as directed etc complete
Colour washing two coats in all floors using best freshly burnt white shell lime and best quality of approved variety of colouring pigment including cost of lime, colouring pigments, fevicol type gum, brushes, scaffolding charges etc., complete complying with standard specification. Mineral colouring pigments not affected by lime should only be used (stainers and colour solutions should not be used.)
Supply and Fixing of GI Pipes and Specials including all complying the Standard specification
Supplying and fixing colour galvalume sheet roof of 0.47mm thickand steel tubular box section of 100x50x3mm of 1meter interval including priming coat fixing in position with all necessary accessories complete complying with standard specification and as directed by the departmental officers.
Painting two coats of newly plastered wall surface with ready mixed plastic emulsion paint of first class quality and of approved colour over a priming coat including thorough scrapping, clean removal of dirt, and including necessary plaster of paris putty, wherever required etc., complete complying with standard specification.
5)Name of the Work : Construction of Baby Pond, Bhathing ghat and strengthenning the bund at Ammaiappagoundanpudur Pond in Kakkavadi Pt
Earth work excavation for foundation in all clauses of soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and boiling out water whenever necessary et complete complying with standard specification
Sub Estimate : Construction of Bathing Ghat at Ammaiappagoundanpudur pond H/O Kakkavadi Panchayat
Earth work excavation for foundation in all clauses of soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and boiling out water whenever necessary et complete complying with standard specification
Cement concrete 1:4:8 mix using 40mm iss HBG metal for foundation & flooring including labour charges etc., complete
Cement concrete 1:3:6 mix using 40mm iss HBG metal for foundation & flooring including labour charges etc., complete
Supplying ertecting and shuttering including necessary supports for plane surfaces in fondaion and basement and in all floors for slabs and beams complying with standard
GST Amount for providing Service to Government Contract Works for the above ConstructionWorks. GST Amount is the Total GST Amount for overall quoted amount above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
K.Murugesan (BID ID -1304635)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .