Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.9 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹3.0 L+₹13,132.46 (4.55%)Rejected-AOC | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | P G YESUDAS L2 | Viju P T L1 |
|---|---|---|---|---|---|
| 1.00Road Maintenanace | |||||
| 1.00 | OD259376/2024-2025:Sectioning up to 150mm and forming the surface for OLD road way
levelling, cambering etc complete as per direction of Engineer in charge | 9 | sqm | 29.11 ₹261.99 | 27.84 ₹250.56 Lowest |
| 1.00 | OD259381/2024-2025:Providing Plain cement concrete for ROAD WORK EXCLUSIVE OF FORMWORK CC
1:2:4 (1 cement: 2 fine aggregate: 4
course aggregate) laid to required slope and camber in panels (@ 3 m c/c) as required
including compaction USING NEEDLE VIBRATOR, finishing and tamping etc .complete. Max. size of course
aggregate not exceeding 25mm , mixed in concrete mixer etc complete as per
specification
(i) Nominal mix (1:2:4) Modified 75.8.1 | 1.35 | cum | 9,184.79 ₹12,399.47 | 8,785.45 ₹11,860.36 Lowest |
| 1.00 | 75.5.5.A.1pb:Modified Penetration Macadam 50 mm thick using Bitumen S-65 - Packed Bitumen Rates <br> Construction of penetration macadam over prepared base by providing a layer of compacted crushed coarse aggregate using chips spreader with alternate applications of bituminous binder and key aggregates and rolling with a three wheel 80-100 kN static roller to achieve the desired degree of compaction as per Technical Specification Clause 506. | 100.56 | sqm | 325.39 ₹32,721.22 | 311.25 ₹31,299.3 Lowest |
| 1.00 | 75.5.2.1pb:Tack Coat - With Packed Bitumen Rates <br> Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.20 to 0.25 kg per sqm on the prepared bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503. | 750 | sqm | 16.35 ₹12,262.5 | 15.64 ₹11,730 Lowest |
| 1.00 | 75.9.3.pb.pa:Plastic roads- Packed Bitumen Rate
20mm thick Open-Graded Premix Carpetusing Bituminous (penetration grade/modified bitumen) Binder -
Bitumen S-65 -Packed Bitumen and Shredded Plastic
Providing, laying and rolling of opengradedpremix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregateseither using penetration grade bitumen or emulsion to required line, grade and level toserve as wearing course on a previously prepared base, using HM Plant attached withopen pugmilll.Heating of aggregate at 150 degree Celsius to 170 degree Celsius, thentransferring the hot aggregate to pugmill and add shredded plastic @10.22 kg/100m2mixing well to form a uniform thin layer of plastic over - hot aggregate and adding hotbitumen (150 to 165 degree Celsius) @ 13.578 Kg/10m2 and mix well, laying and rollingwith a. three wheel 80-100 kN static roller capacity, finished to required level and gradesto be- followed by seal coat of either Type A or Type B or Type C as per TechnicalSpecification Clause 508
Case - I By Manual Means
(II) Bitumen (S-65),including supplying and stacking of materials. | 750 | sqm | 230.22 ₹1,72,665 | 220.21 ₹1,65,157.5 Lowest |
| 1.01 | 75.5.12.A.3.2pb:Seal Coat - Manual Means - Type C - Bitumen S-65 - Packed Bitumen Rates <br> Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type A, Type B and Type C as per Technical Specification Clause 510 <br> A. By Manual Means <br> Case III : Type C <br> (II) Bitumen (S-65) | 750 | sqm | 95.59 ₹71,692.5 | 91.43 ₹68,572.5 Lowest |
Tender Value
₹3.1 L
EMD Value
₹6,565
Closing Date
16 Dec 2024, 4:00 pmClosed
AE,LSGD.KANJOOR GP
AE,LSGD.KANJOOR GP
Annual Plan-KANJOOR GP-13/24-25- APPELI KADAVU ROAD NAVEEKARANAM REACH 3-WARD 10
2024_LSGD_711588_1
27/AE/LSGD/24-25
Open Tender
Civil Works - Roads
Item Rate
240 days
kanjoor gp
Please refer Tender documents.
7 documents required · 7 mandatory
₹580
₹6,565
16 Sept 2025
7 Dec 2024
17 Dec 2024
7 Dec 2024
16 Dec 2024
7 Dec 2024
Amount
Road Maintenanace
OD259376/2024-2025:Sectioning up to 150mm and forming the surface for OLD road way levelling, cambering etc complete as per direction of Engineer in charge
OD259381/2024-2025:Providing Plain cement concrete for ROAD WORK EXCLUSIVE OF FORMWORK CC 1:2:4 (1 cement: 2 fine aggregate: 4 course aggregate) laid to required slope and camber in panels (@ 3 m c/c) as required including compaction USING NEEDLE VIBRATOR, finishing and tamping etc .complete. Max. size of course aggregate not exceeding 25mm , mixed in concrete mixer etc complete as per specification (i) Nominal mix (1:2:4) Modified 75.8.1
75.5.5.A.1pb:Modified Penetration Macadam 50 mm thick using Bitumen S-65 - Packed Bitumen Rates <br> Construction of penetration macadam over prepared base by providing a layer of compacted crushed coarse aggregate using chips spreader with alternate applications of bituminous binder and key aggregates and rolling with a three wheel 80-100 kN static roller to achieve the desired degree of compaction as per Technical Specification Clause 506.
75.5.2.1pb:Tack Coat - With Packed Bitumen Rates <br> Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.20 to 0.25 kg per sqm on the prepared bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503.
75.9.3.pb.pa:Plastic roads- Packed Bitumen Rate 20mm thick Open-Graded Premix Carpetusing Bituminous (penetration grade/modified bitumen) Binder - Bitumen S-65 -Packed Bitumen and Shredded Plastic Providing, laying and rolling of opengradedpremix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregateseither using penetration grade bitumen or emulsion to required line, grade and level toserve as wearing course on a previously prepared base, using HM Plant attached withopen pugmilll.Heating of aggregate at 150 degree Celsius to 170 degree Celsius, thentransferring the hot aggregate to pugmill and add shredded plastic @10.22 kg/100m2mixing well to form a uniform thin layer of plastic over - hot aggregate and adding hotbitumen (150 to 165 degree Celsius) @ 13.578 Kg/10m2 and mix well, laying and rollingwith a. three wheel 80-100 kN static roller capacity, finished to required level and gradesto be- followed by seal coat of either Type A or Type B or Type C as per TechnicalSpecification Clause 508 Case - I By Manual Means (II) Bitumen (S-65),including supplying and stacking of materials.
75.5.12.A.3.2pb:Seal Coat - Manual Means - Type C - Bitumen S-65 - Packed Bitumen Rates <br> Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type A, Type B and Type C as per Technical Specification Clause 510 <br> A. By Manual Means <br> Case III : Type C <br> (II) Bitumen (S-65)
P G YESUDAS (BID ID -2021036)
Bidder Name
P G YESUDAS
Viju P T
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1123635.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .