Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹59,247.30Admitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹64,572.90+₹5,325.60 (8.99%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L3₹65,571.45+₹6,324.15 (10.7%)Admitted-Finance | L3 | Admitted-Finance | ||
| 4 | L4₹65,904.30+₹6,657 (11.2%)Admitted-Finance | L4 | Admitted-Finance |
Tender Value
₹66,570
EMD Value
₹1,331
Closing Date
3 Aug 2026, 6:55 pmClosed
Executive Engineer
Executive Engineer Mechanical and Hospital Division Baramulla
Routine / Corrective Maintenance to DRR No. 653 W/S pertaining to Mechanical and Hospitals Sub Division 1st Baramulla
2026_PWDJK_317459_1
MHDB/TS/2026-27/40
Open Tender
Repair and Maintenance Works
Percentage
10 days
M and H Sub-Division 1st Baramulla
Please refer Tender documents.
9 documents required · 9 mandatory
₹200
Accounts Officer, M and HED Kashmir
₹1,331
27 Aug 2026
23 Jul 2026
4 Aug 2026
23 Jul 2026
3 Aug 2026
23 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Repairs to canopy/awning assembly by straightening bent members, welding damaged portions, replacing/fabricating MS angle supports and vertical members wherever required, surface finishing and refitting complete assembly, complete in all respects. | - | Job | - | - |
| 2 | Repair, Calibration and performance testing of Fuel Injection Pump by dismantling the pump from the machine and shifting it to an authorized/local workshop. The job includes replacement of 04 Nos Nozzle elements, delivery valve, fuel pump repair kit, seals and other consumables as required, calibration on a fuel injection test bench, injector pressure testing, refitting of the pump assembly to the machine and satisfactory trial run. | - | Job | - | - |
| 3 | Repairs inside the Gearbox casing by way of removal of damaged studs on the sides of gearbox casing and providing and fitting the same with new ones along with drain plug and joint gasket on the top of the casing of gearbo and refitting the gearbox casing with rest of transmission system for perfect alignment, complete in all respects. | - | Job | - | - |
| 4 | universal bolt/ set screw (part No.-B-1-010) | - | No | - | - |
| 5 | Repairs to Radiator assembly by dismantling the radiator from the machine and shifting the same to an authorized/local workshop. The scope of work includes leak rectification of the radiator core and tank, brazing of damaged inlet and outlet tubes, patching of cracked/leaking portions, replacement of damaged radiator tubes wherever required, pressure testing to ensure leak-proof performance, refitting of radiator assembly to the machine, topping-up of coolant and satisfactory performance testing. | - | Job | - | - |
| 6 | P/F nuts and bolts of radiator assy. Of size 21 No. | - | No | - | - |
| 7 | Repairs to Lubrication oil sump by way of detaching the lubrication oil sump assembly which involves draining of M oil, cleaning of Bottom Surface of Lubrication sump and surface, prepration of Aluminium welding at two spots and removing of extra burrs produced due to welding and grinding at damaged places and checking for leakage after success | - | Job | - | - |
| 8 | Providing and Fitting of Nut & Bolt (N-4-014) (B-1-017) | - | No | - | - |
| 9 | Repairs to differential housing assembly by way of dismantling and removing the damaged housing, shifting the same to a local workshop for repairs, grinding and preparing the damaged surfaces, carrying out cast iron welding of damaged/cracked portions followed by machining and finishing to restore original dimensions, refitting the repaired differential housing with proper alignment, replenishing lubricant wherever required and conducting operational testing to ensure satisfactory performance, complete in all respects. | - | Job | - | - |
| 10 | Repairs to Front Fork and Steering Quadrant assembly by dismantling complete steering mechanism, removing damaged fork pin by drilling and reboring, carrying out neccessary welding and machining operations, fabrication and fitting of (01) new fork pin, (01) shoulder ring, (01) washer, (01) rectangular gib head key and (01) rectangular parallel rounded-end key conforming to the original dimensions, followed by reassembly, allignment, lubrication and functional testing of the complete steering assembly, complete in all respects. | - | Job | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.61 MB
NIT40.pdf
Tender Documents • 0.59 MB
BOQ_1040422.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .