Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹20.5 LAccepted-AOC | ₹20.5 L | L1 | Accepted-AOC LOW RATE BIDDER |
| 2 | Not Admitted-Finance | - | - | Not Admitted-Finance Not qualified for AOC |
| 3 | Not Admitted-Finance | - | - | Not Admitted-Finance Not qualified for AOC |
Tender Value
Refer Docs
EMD Value
₹50,000
Closing Date
30 May 2023, 10:30 amClosed
SIYA RAM GAUTAM
VPO BUDHEWAL DISTT LUDHIANA
FABRICATION AND ERECTION
2023_Coop_102728_1
FABRICATION AND ERECTION 2023 24
Open Tender
Job Works
Item Rate
180 days
BUDHEWAL
FABRICATION AND ERECTION
3 documents required · 3 mandatory
₹1
₹50,000
28 Jul 2023
19 May 2023
30 May 2023
19 May 2023
30 May 2023
19 May 2023
Amount
(i)Sulphur Furnace scrubber from M.S. Plate from 10mm (including all connections with pipe lines) complete jobs D, F & E
(ii)Replacement of cooling pipes of Scrubber.
(iii) Top Cover of Scrubber.
Sulphur Furnace melter/ receiver from M.S. Plate from 10mm (including all connections with pipe lines) A) Dismantling
B) Fabrication
C) Erection
Juice heater outer shell from MS plate 10mm A) Dismantling
B) Fabrication
C) Erection
i) Fabrication & Erection of mud mixture shaft side plates with proper Alignment
ii) Fabrication & Erection of bottom curved portion of mud mixture with proper Alignment
(i)clarifier inside compartment coil from M.S. Pipe 5" with all nipple, flanges etc. complete job (as where it is) A)Dismantling
B) Fabrication
C) Erection
(ii)Replacement of Stirrers arms of clarifier
Dismantling, Fabrication & erection of distance piece of diameter 400mm. Upto 1.5-meter length (M.S. Plate 8mm).
500 mm up to 1.5-meter length (M.S. Plate 8mm).
600 mm up to 1.5-meter length (M.S. Plate 8mm).
700 mm up to 1.5-meter length (M.S. Plate 8mm).
800 mm up to 1.5-meter length (M.S. Plate 8mm).
900 mm up to 1.5-meter length (M.S. Plate 8mm).
(i)Dismantling, Fabrication & Erection of Juice Heater (top & bottom) compartment partition plate with rubber fitting channels from M.S/EN-8 square bar & rubber strip fitting to make it leak proof (to avoid short circuiting)
(ii) Replacement of compartments partition plates of Juice Heater. (a) Top
(b) Bottom
PAN Body Shell from M.S Plate 12mm A) Dismantling
B) Fabrication
C) Erection
Top cone from M.S Plate 12mm A) Dismantling
B) Fabrication
C) Erection
Umbrella from M.S Plate 10mm A) Dismantling
B) Fabrication
C) Erection
Down Take from M.S Plate 12mm A) Dismantling
B) Fabrication
C) Erection
Save all of PANs (i) Complete Jobs from M.S. Plate 10mm and 8mm plate. A) Dismantling
B) Fabrication
C) Erection
(ii) Outer shell (D,F & E)
(iii) Inner portion (D,F & E)
(iv) Top cover (D, F & E) with strengthening
(a) Syrup/ Molasses tank from M.S plate 8mm A) Dismantling
B) Fabrication
C) Erection
b) Patch work of Syrup/ Molasses storage tanks of all PANs.
Replacement of worn-out of M.S. Runner of inter carrier, elevator, RBC, cross carrier & Cane Carrier Chains.
Replacement of rail line of cane unloader with 50mm square bar
Molasses Storage Tank (a) Replacement of worn out body shell of final molasses storage tank with M.S. Plate
(b) Patch work of Molasses storage tanks.
Dismantling, Fabrication & Erection of Suction Pipes of injection pumps
Dismantling, Fabrication & erection of cooling coils including connection pipe of Crstallizers
Replacement of worn-out ducting of boiler & APCD including angle, channel, Flats & Flanges
Replacement of side plates of cane carrier chain/RBC/cross elevator/Baggasse elevator
Replacement of trough RBC/ trough cross elevator/ trough Bagasse Elevator
Mill house screw conveyor assembly (complete with bearings) A) Dismantling
B) Fabrication
C) Erection
Mill house screw conveyor trough only
Dismantling, Fabrication & Erection both top juice receiving tanks and bottom drain tanks of DSM screen
Replacement of worn out portion of APCD includes casing/scrubber and flue gas entry connected to chimney portion etc.
Cane Cutter hood and chopper top plate from 12mm thick M.s plate A) dismantling
B) Fabrication
C) Erection
Dismantling , Fabrication & Erection of worn out portion of Chute cane carrier to 1st mill
Dismantling , Fabrication & Erection of Juice Tray of mill No. 1 & 2 from M.S. plate 8mm
Dismantling , Fabrication & Erection of Juice Tray of mill No. 1 & 2 from S.S. plate 6mm
Repair of rotary baggase feeders of boilers A) Body
B) Rotor
Replacement of casing of boiler (both plate & supporting angle)
(a) Replacement of Magma mixture body including driving units in all aspects (Complete Job). A- magma
B- magma
(b) Shell of A, B & C magma mixers.
Replacement of worn out portion of crystallizer body
Repair and fitting of bush to Crystallizer's Central shaft
Replacement of worn out condensate receiving bottles
Replacement of worn out down take of quad
Dismantling, Fabrication & Erection of Dorr's scrapper (complete job).
I.D Fan worn out casting of both boilers A) Dismantling
B) Fabrication
C) Erection
Replacement of the expansion joints of boilers
Replacement of worn out ducting the boilers
Erection and Fabrication of any thing from scrap
Replacement of (i) S.S ventury of Condensor
(b) Cone of condensor from S.S plate
Replacement of tail pipe of pan
Replacement of inter carrier side plates
Replacement of scrapper bar side plates size :- 1 meter square
Replacement of the casing of air heater
Replacement of condenser jet box
Replacement of the bottom curved portion of pug mill (centrifugal machine)
Replacement of the outer shell of the clarifier
Replacement of the worn-out portion of cane carrier
D.F. & E. Of shaft & string pedals of (i) A- massecuite pugmill
(ii) B- massecuite pugmill
a) Conversion of B& C double cured crystallizers as A-vacuum crystallizer with complete shell fabrication, erection alongwith drives and commissiong of the crystallizer with satisfactory trials.
a) Replacement of broken arms of Dry seed cryst.
a) Replacement of dropping Massecuite gutter of A-, B- & C of PANs
b) Replacement of Massecuite gutter of Crystallizers
(PART B) (General) Pipe Line M.S 1" to 12" dia a) Dismantling
b) Erection
Pipe Line M.S above 12'' dia upto 32". (other than vapour pipe of pan and quad A) Dismantling
B) Fabrication
C) Erection
Pipe Line S.S 1" TO 12" dia A) Dismantling
b) Erection
Pipe Line C.I. 1'' TO 12" dia A) Dismantling
B) Erection
Steam Pipe Line 1" to 12" dia A) Dismantling
b) Erection
Steam Pipe Line bends A) Dismantling
b) Erection
A) Bend M.S upto 12" dia a) Dismantling
b) Fabrication
c) Erection
B) Bend M.S. above 12" dia up to 32" dia
Welding joints of Water, Juice, Vapour and Exhaust Pipe Line of all sizes
Man hole of all sizes a) Dismantling
B) Fabrication
C) Erection
Flanges a) Dismantling
b) Fabrication
c) Erection
Tee/ Nipple/ Cross/ Reducers (M.S) a) Dismantling
b) Fabrication
c) Erection
Dismantling, Fabrication and Erection of a) M.S Coil
b) M.S Steam Coil
Platform A) Dismantling
B) Fabrication
C) Erection
M.S Structure work (Factory Building) a) Dismantling
b) Fabrication
c) Erection
D, F & E of M.S. Tank having round, concial & rectangular bottoms (other than ms tank of syrup and molasses) (i) Syrup Extraction bottles of Pumps.
(ii) Catchers of Juice Pumps.
(iii) Molasses run off tanks of machies.
Trusses, Perlins, Columns & Beams (Factory Building) a) Dismantling
b) Fabrication
c) Erection
Platform Pipe Line & Railing of all sizes A) Dismantling
b) Erection
Electric Panel, DB and other machinery shed GI/ACC/MS Sheet a) Dismantling
B) Fabrication & Erection
Dismantling, Fabrication and Erection of Pump and Motor Bed a) Below 15 H.P. Motor
b) Above 15 H.P Motor
Valves:- Sluice/Angle/N.R.V/Butterfly Type a) Dismantling
b) Erection
Vapour/ Exhaust pipe Line of quad and pan from M.S. plate (8mm) a) Dismantling
B) Fabrication
C) Erection
Cone from M.S Plate (10mm) upto 1.5 meter mean dia. A) Dismantling
B) Fabrication
C) Erection
Gutter from M.S. plate 5mm of centrifugal machine. a) Dismantling
B) Fabrication
C) Erection
Sight Glass a) Replacement
Crystallizer Slide gate a) Dismantling
B) Fabrication
C) Erection
Vapour pipe bend of Quad & Pan A) Dismantling
B) Fabrication
C) Erection
a) Patch work of B.H equipment's
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .