Loading…
Loading…
Tender Value
₹17.5 L
EMD Value
₹35,000
Closing Date
15 Oct 2026, 2:00 pm
No
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
45 days
Expenditure
Capital (Works)
SRDEE TRD
14 conditions · 2 needing a document upload
All the tenderers/Contractors have to deposit full earnest money and tender document cost as stipulated for the tender, through online modes as permitted in IREPS application through multiple banks net banking, debit and credit cards . All documents related to Partnership deed/Joint venture/ Consortium/ MOU, duly signed by the notary public, should be uploaded failing which offer will be summarily rejected.
I/We also hereby agree to abide by the Indian Railways Standard General Conditions Of Contract, with all correction slips up-to- date and to carry out the work according to the Special Conditions of Contract and Specifications of materials and works as laid down by Railway in the annexed Special Conditions of contract , General Instructions and conditions , explanatory notes of schedule of work and Annexures.
I/We hereby Confirm that the rates, rebates and/or other financial terms, if any, quoted by us in the relevant fields of the Financial Bid page will only be the ruling terms for deciding the inter-se ranking, and any such condition having financial repercussions, if quoted by us anywhere else including attached documents shall not be considered for deciding inter-se ranking
However, Railways shall have the right to incorporate any such condition quoted by us, in the contract, at their discretion, if contract is placed on us.
Manual submission of EMD and cost of tender form cannot be entertained/Considered and hence no need of uploading the scanned copy of financial instruments
Whether GST registration available or not?
The contractor has to submit the EPF Code as per the EPFO Act and also has to submit a statement in this regard.
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
The bidder has to fill in his quoted rate against each item in the Bid rate / Unit rate column. The bidding rate is Rs./ unit, the bidder has to quote his rate for the individual item only
Replacement of overaged insulators on age cum condition basis under TVC Division.
V_TRD_OT_06_2026-27item2~SR
V_TRD_OT_06_2026-27item2
Open
Works - General
180 Days
Thiruvananthapuram, Kerala
₹0
₹35,000
18 Sept 2026
18 Sept 2026
1 Oct 2026
7 items across 1 schedule
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| — | — | — | 17,47,627.41 | ||
| — | 737.00 | — | — | ||
| Erection of bracket insulators including dismantling of existing insulator | — | — | — | 7,83,865.83 | |
| — | 661.00 | — | — | ||
| Erection of stay insulators including dismantling of existing insulator | — | — | — | 7,34,787.43 | |
| — | 173.00 | — | — | ||
| Erection of 9 tonne cut in insulators including dismantling of existing insulator | — | — | — | 2,28,974.15 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
tenderdocument.pdf
ATTACHMENT
GCCApril2022_1.pdf
ATTACHMENT
GCCcorrectionslipNo.10.pdf
ATTACHMENT
GCCApril2022Correctionslip1.pdf GCC Works correction slip1
ATTACHMENT
GCC2022correctionslipNo.2.pdf
ATTACHMENT
GCC2022AprilCorrectionslip3.pdf GCC Works correction slip3
ATTACHMENT
GCC Works correction slip4
ATTACHMENT
GCC2022correctionslipNo.5.pdf
ATTACHMENT
GCC Works correction slip6
ATTACHMENT
jpo.pdf
ATTACHMENT
GCC_April_2022_ACS-7.pdf
ATTACHMENT
GCC Works correction slip8
ATTACHMENT
GCC Works correction slip9
ATTACHMENT
GCCACSno11.pdf
ATTACHMENT
BGformat_1.pdf
ATTACHMENT
GCCApril2022Correctionslip1.pdf
ATTACHMENT
GCC2022AprilCorrectionslip3.pdf
ATTACHMENT
GCC_April-2022_Correctionslip4.pdf
ATTACHMENT
GCC_April-2022_Correctionslip6.pdf
ATTACHMENT
GCC_Apr_2022_ACS-8_20-12-24.pdf
ATTACHMENT
GCC_Apr_2022_ACS-9_9-1-25.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .