Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹72.6 CrAccepted-AOC P 43 OXYGEN HOUSE TARATALA ROAD KOLKATA KOLKATA WEST BENGAL 700088 | KOLKATA | WEST BENGAL | 700088 | ₹72.6 Cr | L1 | Accepted-AOC L1 Bidder |
Tender Value
Refer Docs
EMD Value
₹24.5 L
Closing Date
24 Jul 2020, 2:00 pmClosed
Puneet Khanna (Head-Supply Chain Management)
WORLEY India Private Limited, New Energy House , Ramakrishna Mandir Road, Kondivita, Andheri (East), Mumbai-400 059, India
Compressed Air and Nitrogen Generation System
2020_REFHQ_116846_1
44AC9100-00-ER-370001
Open Tender
Lump Sum TurnKey
480 days
IOCL GUJARAT REFINERY, INDIA
Please refer Tender documents
10 documents required · 10 mandatory
₹24.5 L
Yes
WORLEY India Private Limited
7 Feb 2021
11 May 2020
27 Jul 2020
11 May 2020
24 Jul 2020
3 Jun 2020
26 May 2020
Amount
Residual Process Engineering, Detailed Design Engineering including HAZOP/HAZID/SIL Study & Other Safety Studies as mentioned in Bidding Documents, Project Management, Topography Survey and Soil Investigation, Site enabling jobs including area filling and grading upto FGL, Total Procurement (including first fill, consumables, special tools and tackles, Pre-Commissioning Spares, Commissioning Spares, Start-up spares & Mandatory spares), Fabrication, Manufacturing, Quality Assurance, Inspection & Expediting, Third Party Inspection, Supplies, Transportation, Insurance, Handling & Storage of all Equipment, Materials, items and other Construction Materials at yard/site, Fabrication, Assembly, Construction, Erection, Installation of all plant machinery including civil, Structural, Mechanical, Piping, Electrical and Instrumentation including tie-ins, Testing, Insulation, Painting, First fill of lubricants, Obtaining all Statutory Approvals (except for Environment Clearance), pre commissioning & Mechanical Completion of Plant, Preparation of plant specific operating manuals, Start-up, Commissioning and Performance Guarantee Test Runs (PGTR), Training of Owner’s O&M personnel, consumables (Chemicals & Lubricants) for 6 (six) months operation, Contract closure activities , Final invoice/ billing & document hand over and handing over of the facilities with Final and “As Built” documentation for LSTK-C Package comprising of Compressed Air & Nitrogen Generation System of Acrylic/Oxo-Alcohol Project at IOCL Dumad Complex, Near Gujarat Refinery
FOREIGN CURRENCY PART
INDIAN CURRENCY PART
Description of Work / Item(s)
Amount
Lumpsum Price for Supply portion for completion of Scope of Work as per Bidding Document
FOREIGN CURRENCY PART
INDIAN CURRENCY PART
Description of Work / Item(s)
Amount
ENGINEERING PRICE ( DESIGN AND DETAILED ENGINEERING OF COMPRESSED AIR & NITROGEN GENERATION SYSTEM AS PER REQUIREMENTS DETAILED OUT IN VARIOUS SECTIONS OF BIDDING DOCUMENT
FOREIGN CURRENCY PART
INDIAN CURRENCY PART
LUMPSUM PRICE FOR CONNSTRUCTION / INSTALLATION, START-UP, PRECOMMISSIONING, COMMISSIONING, PGTR, TRAINING PORTION AS PER REQUIREMENTS DETAILED OUT IN VARIOUS SECTIONS OF BIDDING DOCUMENT
FOREIGN CURRENCY PART
INDIAN CURRENCY PART
Description of Work / Item(s)
Amount
Tax Details
GST ON SUPPLY OF INDIGENOUS GOODS (PART BREAK-UP OF SP-1 )
Customs Duty on Foreign Component of SP-1
SWS on Customs duty on Foreign Component of SP-1
IGST/ (CGST+SGST) on (Foreign Component of SP-1 + (Customs duty at Sr.2.1 + SWS at 2.2 above))
GST ON SUPPLY OF SERVICES (PART BREAK-UP OF SP-2)
Description of Work / Item(s)
Amount
AMOUNT OF FOREIGN COMPONENT
AMOUNT OF INDIAN COMPONENT
Description of Work / Item(s)
Amount
Annual charges for Post Warranty maintenance for ALL TYPES OF ANALYSERS (including GCs) / ANALYSER SHELTERS as per technical portion of bidding document for the following periods:
First year after expiry of defect liability
Second year after expiry of defect liability
Third year after expiry of defect liability
Fourth year after expiry of defect liability
Fifth year after expiry of defect liability
Annual charges for Post Warranty maintenance for PLC as per technical portion of bidding document for the following periods:
First year after expiry of defect liability
Second year after expiry of defect liability
Third year after expiry of defect liability
Fourth year after expiry of defect liability
Fifth year after expiry of defect liability
Description of Work / Item(s)
Amount
GUARANTEED POWER CONSUMPTION FOR COMPRESSED AIR & NITROGEN GENERATION SYSTEM AS PER BIDDING DOCUMENT
GUARANTEED POWER CONSUMPTION FOR COMPRESSED AIR & NITROGEN GENERATION SYSTEM AS PER MR
US Dollar
European Euro
British Pound
Japanese yen
Singapore Dollar
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Download all tender documents and submit your bid