Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.5 CrAccepted-AOC VILLAGE VILLAGE TEHSIL BAIJNATH DISTRICT KANGRA | MANDI | HIMACHAL PRADESH | 175013 | ₹1.5 Cr | L1 | Accepted-AOC work awarded |
| 2 | L2₹1.6 Cr+₹14.1 L (9.35%)Rejected-Finance | ₹1.6 Cr+₹14.1 L (9.35%) | L2 | Rejected-Finance L2 |
| 3 | L3₹1.7 Cr+₹15.1 L (10.0%)Rejected-Finance AT GROUND FLOOR MAIN BAZAAR MEHRE TEHSIL BARSAR DISTT HAMIRPUR H P PIN CODE 174305 | HAMIRPUR | HIMACHAL PRADESH | 174305 | ₹1.7 Cr+₹15.1 L (10.0%) | L3 | Rejected-Finance L3 |
| 4 | L4₹1.8 Cr+₹33.0 L (21.9%)Rejected-Finance VILLAGE DOHAL PO PATTI TEHSIL PALAMPUR DISTRICT KANGRA | KANGRA | HIMACHAL PRADESH | 175013 | ₹1.8 Cr+₹33.0 L (21.9%) | L4 | Rejected-Finance L4 |
| 5 | L5₹1.9 Cr+₹39.6 L (26.3%)Rejected-Finance | ₹1.9 Cr+₹39.6 L (26.3%) | L5 | Rejected-Finance L5 |
| Sl No | Description | Qty | Unit | PARVEEN KATNA L2 | AMIT CHOUDHARY L1 | Shashank Jagota Govt. Contractor L5 | GANTANTAR THAKUR L4 | Ravi Kumar L3 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | Excavation in foundation , trecnches etc., in all kinds of soil such as pickwork, jumper work blasting work,kankar moorum,singles including decomposed soft and hard rock,including chiselling wedging clearance of bushes etc.including shoring, dewatering etc. in all leads and lifts stacking the excavated soil not more than 3 meters clear from the edge of excavation and then returning the stacked soil in 15cm layers when required into plinth and sides of foundation etc. consolidating each deposited layers by remming and watering and then disposing of all surplus earth within all leads and lifts complete to the entire satisfaction as directed by the Engineer-in-charge of the site of work.(PJ) Pick work 20% and Jumper Work 80% | 138.87 | Cum. | 800 ₹1,11,096 | 600 ₹83,322 | 700 ₹97,209 | 700 ₹97,209 | 304 ₹42,216.48 Lowest |
| 2.00 | Providing and laying cement concrete 1:4:8(1cement:4sand:8 graded crushed stone aggregate 40mm nominal size) and curing complete excluding cost of form work in foundation and plinth including carriage of materials in all leads and lifts. | 18.69 | Cum. | 6,800 ₹1,27,092 | 7,200 ₹1,34,568 | 7,000 ₹1,30,830 | 7,800 ₹1,45,782 | 5,200 ₹97,188 Lowest |
| 3.00 | Providing and laying cement of grade M-25 not leanar than: concrete work 1:1½:3(M:25 grade)(1cement:1½sand: 3 crushed stone aggregate 20mm nominal size & curing complete excluding the cost of form work and reinforcement for reinforced concrete work in following items including carriage of material in all leads & lifts. Foundation footing, bases of columns etc. | 48.63 | Cum. | 9,200 ₹4,47,396 | 9,500 ₹4,61,985 | 9,500 ₹4,61,985 | 15,500 ₹7,53,765 | 9,006 ₹4,37,961.78 Lowest |
| 3.20 | Column, pillars, posts and struts upto floor two level | 14.58 | Cum. | 9,900 ₹1,44,342 | 10,000 ₹1,45,800 | 9,500 ₹1,38,510 | 15,500 ₹2,25,990 | 9,006 ₹1,31,307.48 Lowest |
| 3.30 | suspended floors,roofs,landing shelve and their supports balconies beams,girders bressumers and centilevers upto floor two level | 86.87 | Cum. | 9,500 ₹8,25,265 | 9,500 ₹8,25,265 | 9,500 ₹8,25,265 | 15,000 ₹13,03,050 | 9,006 ₹7,82,351.22 Lowest |
| 3.40 | Stair cases (except spiral stair cases) excluding landing but including preparing of the surface and finishing of nosing upto floor two level | 6.34 | Cum. | 9,200 ₹58,328 | 10,000 ₹63,400 | 9,500 ₹60,230 | 15,000 ₹95,100 | 9,006 ₹57,098.04 Lowest |
| 4.00 | Providing form work with steel plates 3.15 mm thick welded with angle iron in frame 30x30x5mm so as to give a fair finish including centring, shuttering, strutting and propping etc. with wooden battens and ballies, height of propping and centring blow supporting floor to ceiling not exceeding 4 mtrs. and removal of the same for insitu-reinforced concrete & plain concrete work in following item including carriage of material in all leads & lifts..Foundation, footings basis of columns etc. and mass concrete. | 72.9 | Sqm. | 325 ₹23,692.5 Lowest | 420 ₹30,618 | 350 ₹25,515 | 450 ₹32,805 | 340 ₹24,786 |
| 4.10 | flat surface such as soffits of suspended floors, roofs, landings and like floors etc. upto 200mm in thickness | 395.8 | Sqm. | 450 ₹1,78,110 Lowest | 660 ₹2,61,228 | 500 ₹1,97,900 | 700 ₹2,77,060 | 601 ₹2,37,875.8 |
| 4.20 | Columns, pillars, posts and struts Square, rectangular or polygonal in plan. | 70.87 | Sqm. | 500 ₹35,435 Lowest | 760 ₹53,861.2 | 500 ₹35,435 Lowest | 780 ₹55,278.6 | 601 ₹42,592.87 |
| 4.30 | Stair cases with sloping or stepped soffits excluding landing. | 39.03 | Sqm. | 350 ₹13,660.5 | 340 ₹13,270.2 Lowest | 500 ₹19,515 | 350 ₹13,660.5 | 700 ₹27,321 |
Tender Value
₹1.8 Cr
EMD Value
₹2.6 L
Closing Date
19 Sept 2025, 11:00 amClosed
EXECUTIVE ENGINEER
JAL SHAKTI DIVISION DHARMSHALA
Construction of Rest House Civil work Electrical Wiring Fitting Fixtures Sanitary Water Supply etc
2025_HPIPH_114164_1
NO. EE-JSD-EA-2025- 8550-8649
Open Tender
Civil Works
Item Rate
365 days
DHARAMSHALA
Please refer Tender documents.
8 documents required · 8 mandatory
₹5,000
EE JAL SHAKTI DIVISION
₹2.6 L
30 Oct 2025
9 Sept 2025
19 Sept 2025
9 Sept 2025
19 Sept 2025
12 Sept 2025
9 Sept 2025 - 12 Sept 2025
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .