| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹21.4 LAdmitted-Finance | -0.55% | ₹21.4 L | L1 | Admitted-Finance |
| 2 | L2₹21.8 L+₹33,416.25 (1.56%)Admitted-Finance | +1.00% | ₹21.8 L+₹33,416.25 (1.56%) | L2 | Admitted-Finance |
Tender Value
₹22.0 L
EMD Value
₹44,000
Closing Date
11 Jun 2026, 6:00 pmClosed
EO Nagar Palika, Itawa
EO Nagar Palika, Itawa
Construction of Cluster level Federation CLF Workshop formed under Rajvika (Dr. Shyama Prasad Mukherjee Distt. Upliftment Scheme)
2026_DLB_563825_1
NIT No. 02/2026-27 (No. 1215-1218)
Open Tender
Civil Works
Percentage
270 days
Kota
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
EO Nagar Palika, Itawa
₹44,000
Yes
18 Jun 2026
1 Jun 2026
12 Jun 2026
1 Jun 2026
11 Jun 2026
1 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation in foundation, trenches etc. including dressing of sides and ramming of bottoms, including getting out the excavated material, refilling after laying pipe/ foundation and disposal of surplus excavated material at a lead upto 50m suitable site as per direction of Engineer for following depths, below natural ground / Road top level. In all types soils/ saturated soil such as moorum, sand, sandy silt, clay, black cotton soil, kankar, etc. | 95.46 | Cum | 229.5 | ₹21,908.07 |
| 2 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work upto plinth level 1:4:8 (1 Cement : 4 fine coarse sand : 8 graded stone aggregate 40 mm nominal size). | 16.92 | Cum | 3,712.5 | ₹62,815.5 |
| 3 | Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centering, shuttering, finishing and reinforcement - All work upto plinth level :1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 55.79 | Cum | 4,575 | ₹2,55,239.25 |
| 4 | Centering and shuttering with plywood or steel sheet upto two stories or height upto 7.5 metre above plinth level including strutting, propping etc. and removal of form for : Foundations, footings, bases of columns, etc. for mass concrete. | 337.99 | Cum | 236.5 | ₹79,934.64 |
| 5 | Reinforcement for R.C.C. work at all levels including straightening, cutting, bending, placing in position and binding all complete. Hard drawn steel wire | 5,969.28 | Kg | 78.5 | ₹4,68,588.48 |
| 6 | Random rubble masonry with hard stone in foundation and plinth : Cement mortar 1:6 (1 cement : 6 coarse sand) | 49.06 | Cum | 3,063.78 | ₹1,50,309.05 |
| 7 | Supply of earth up to 1 km lead | 40 | Cum | 125.56 | ₹5,022.4 |
| 8 | Earth filling with available surplus soil excavated from foundations and taken only from outside of building plinth in layers not exceeding 20cm in depth, consolidating each deposited layer including ramming and watering and consolidation with lead up to 50 m and lift upto 1.5 m. | 40 | Cum | 159 | ₹6,360 |
| 9 | Random rubble dry stone Kharanja (soling) under floor. | 95.47 | Cum | 915 | ₹87,355.05 |
| 10 | Brick work with FPS bricks of class designation 75 in superstructure above plinth level upto two stories in all shapes and sizes in : Cement mortar 1:6 (1 cement : 6 coarse sand) | 41.37 | Cum | 5,400 | ₹2,23,398 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.41 MB
BOQ_1003550.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .