Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹5.0 LAdmitted-Finance | -38.08% | ₹5.0 L | L1 | Admitted-Finance |
| 2 | L2₹5.4 L+₹38,600.28 (7.72%)Admitted-Finance | -33.30% | ₹5.4 L+₹38,600.28 (7.72%) | L2 | Admitted-Finance |
| 3 | L3₹5.5 L+₹49,098.27 (9.82%)Admitted-Finance | -32.00% | ₹5.5 L+₹49,098.27 (9.82%) | L3 | Admitted-Finance |
| 4 | L4₹5.5 L+₹52,166.91 (10.4%)Admitted-Finance | -31.62% | ₹5.5 L+₹52,166.91 (10.4%) | L4 | Admitted-Finance |
| 5 | L5₹5.7 L+₹65,168.26 (13.0%)Admitted-Finance | -30.01% | ₹5.7 L+₹65,168.26 (13.0%) | L5 | Admitted-Finance |
Tender Value
₹8 L
EMD Value
₹16,000
Closing Date
8 Jun 2026, 1:00 pmClosed
Executive Engineer CMD PDC Udhampur
Executive Engineer CMD PDC Udhampur
Construction of R/Wall at Mandal near RD 4844m and RD 4900m for protection of Water conductor of CHEP I
2026_SPDC_310033_3
eNIT 01 of 2026-27
Open Tender
Civil Works
Percentage
45 days
Udhampur
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
CPAO Jammu
₹16,000
Office of Chief Engineer CIandD Wing JKPDC Jammu
2 Jul 2026
18 May 2026
10 Jun 2026
18 May 2026
8 Jun 2026
18 May 2026
18 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge.
All Kind of Soils | 36.22 | Cum | 592.9 | ₹21,474.84 |
| 2 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:
1:4:8 (1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size) | 5.1 | Cum | 5,202.9 | ₹26,534.79 |
| 3 | Random Rubble masonry with hard stone in foundation and plinth including leveling up with cement concrete 1:6:12 (1 Cement : 6 coarse sand : 12 graded stone aggregate 20mm nominal size) upto plinth level and
curing complete with:
Cement mortar 1:6 (1 Cement : 6 coarse sand) Nallah Stone | 90 | Cum | 5,402.9 | ₹4,86,261 |
| 4 | Stone boulder (nallah) nominal size 225 mm | 43.8 | Cum | 931 | ₹40,777.8 |
| 5 | Providing and laying damp-proof Course 50 mm thick with cement concrete 1:2:4 (1 cement:2 coarse sand: 4 graded stone aggregate 20 mm nominal size) and curing complete | 15 | Sqm | 416.5 | ₹6,247.5 |
| 6 | Providing and laying in position cement concrete of specified grade including curing but
excluding the cost of centring and shuttering. All work upto plinth level with:
1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | 23.25 | Cum | 6,591.25 | ₹1,53,246.56 |
| 7 | Providing and fixing 110 mm dia PVC Pipe for weep holes | 90 | meter | 235.41 | ₹21,186.9 |
| 8Carriage of Materials by Mechanical Transport: | |||||
| 8.1 | Cement 10 Km Avg | 15.62 | MT | 248.03 | ₹3,874.23 |
| 8.2 | Sand 15 Km Avg | 43.42 | CuM | 344.49 | ₹14,957.76 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.16 MB
SBDW3.pdf
Other Document • 0.55 MB
BOQ_1003233.xls
BOQ • 0.39 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .