| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.2 LAccepted-AOC KHASRA NO 687 DUHAI INDUSTRIAL AREA GHAZIABAD U P 201002 | GHAZIABAD | UTTAR PRADESH | 201002 | ₹7.2 L | L1 | Accepted-AOC Due to L1 |
| 2 | L2₹13.5 L+₹6.3 L (87.2%)Rejected-Finance D 25 BSR INDUSTRIAL AREA LAL KUAN GHAZIABAD U P 201001 | GHAZIABAD | GHAZIABAD | UTTAR PRADESH | 201001 | ₹13.5 L+₹6.3 L (87.2%) | L2 | Rejected-Finance higher than L1 bidder |
| 3 | L3₹13.7 L+₹6.5 L (89.5%)Rejected-Finance 904 27 BARAKHAMBA ROAD CENTRAL DELHI DELHI 110001 | NEW DELHI | DELHI | 110001 | ₹13.7 L+₹6.5 L (89.5%) | L3 | Rejected-Finance higher than L1 bidder |
| Sl No | Description | Qty | Unit | Turbo Tech Engineers L1 | M/S Multitech Enigneers L2 | NORTHERN POWER ERECTORS LIMITED L3 |
|---|---|---|---|---|---|---|
| 1.00O and M of Giri Power House | ||||||
| 1.01 | Repair of cast steel (13% chromium, 4% nickel) Francis runner by welding of all 11 Nos. runner blades of modified runner No. 3 dismantled from 30MW Unit-1 of Giri Power House. Grinding of pitted/notched/eroded area for proper building up of patches. Patch repair by welding with SS MO-309 welding electrodes on both sides of runner blades to match the original profile of the runner. Welding, grinding and machining the damaged portion of lower and upper labyrinths. Welding and grinding throughout the periphery of the runner's labyrinths to intact the upper and lower labyrinths with the runner. After welding it must be ensured that the defect has been completely removed. Welding to be done after preheating and post heating process. After welding final check by DP test and UT test to the entire statisfaction of Engineer-in-Charge complete in all respects. | 1 | Job | 5,16,000 ₹6,08,880 Lowest | 8,05,085 ₹9,50,000.3 | 8,10,000 ₹9,55,800 |
| 1.02 | Dynamic balancing of 30MW Cast steel Francis modified runner No. 3 repaired at Sr. No. 1 above at contractor's workshop complete in all respects. | 1 | Job | 10,000 ₹11,800 Lowest | 2,54,238 ₹3,00,000.84 | 2,58,000 ₹3,04,440 |
| 1.03 | Transporation of 30MW modified runner No. 3 to and fro from site to contractor's workshop including insurance, loading, unloading, and handling complete in alll respects. | 1 | Job | 85,000 ₹1,00,300 | 84,745 ₹99,999.1 Lowest | 90,000 ₹1,06,200 |
Tender Value
Refer Docs
EMD Value
₹9,870
Closing Date
23 Feb 2026, 11:00 amClosed
Superintending Engineer
Generation Circle HPSEBL Shaktinagar Nahan
E-Tender for Repair and dynamic balancing of 30MW Francis runner dismantled from Unit-1 of 2x30MW Giri Power House under GPHD Giri Nagar.
2026_HPSEB_128342_1
SEGN/DB-Bid-06/2025-26
Open Tender
Repair and Maintenance Works
Item Wise
30 days
Giri Power House Giri Nagar
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
₹9,870
10 Jun 2026
13 Feb 2026
24 Feb 2026
13 Feb 2026
23 Feb 2026
13 Feb 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1O and M of Giri Power House | |||||
| 1.01 | Repair of cast steel (13% chromium, 4% nickel) Francis runner by welding of all 11 Nos. runner blades of modified runner No. 3 dismantled from 30MW Unit-1 of Giri Power House. Grinding of pitted/notched/eroded area for proper building up of patches. Patch repair by welding with SS MO-309 welding electrodes on both sides of runner blades to match the original profile of the runner. Welding, grinding and machining the damaged portion of lower and upper labyrinths. Welding and grinding throughout the periphery of the runner's labyrinths to intact the upper and lower labyrinths with the runner. After welding it must be ensured that the defect has been completely removed. Welding to be done after preheating and post heating process. After welding final check by DP test and UT test to the entire statisfaction of Engineer-in-Charge complete in all respects. | 1 | Job | - | - |
| 1.02 | Dynamic balancing of 30MW Cast steel Francis modified runner No. 3 repaired at Sr. No. 1 above at contractor's workshop complete in all respects. | 1 | Job | - | - |
| 1.03 | Transporation of 30MW modified runner No. 3 to and fro from site to contractor's workshop including insurance, loading, unloading, and handling complete in alll respects. | 1 | Job | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.47 MB
SBD06pdf.pdf
Tender Documents • 3.29 MB
BOQ_189602.xls
BOQ • 0.25 MB
bid-6.pdf
PDF • 1.01 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .