Loading…
Loading…
Tender ID
Tender Value
Refer Docs
EMD Value
₹2,600
Closing Date
8 May 2026, 5:00 pmClosed
EE M G C C Div 8 Bulandshahr
M G C C Div 8 Bulandshahr
Lot 3 Construction of VRB cum Fall at Km. 3.640 of Tail Dy.
2026_UPIDC_1144439_4
01.EE.2026-27
Open Tender
Civil Works - Canal
Item Rate
45 days
SAMBHAL
2 documents required · 2 mandatory
₹856
₹2,600
Yes
2 May 2026
2 May 2026
11 May 2026
2 May 2026
8 May 2026
2 May 2026
2 May 2026 - 8 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork in Excavation of foundation in ordinary soil including all lift & lead and including back filling, watering and ramming excavated earth into the trenches or into the space between the structure and the side of foundation trenches with removal and disposal of surplus earth as direction of engineer-in-charge from the foundation trenches including cost of labour, all T & P, leads and lift etc. | 0.4 | CUM | - | - |
| 2 | Providing and Laying M-10 (C.C.1:3:6) cement concrete including cost of all materials, labour T & P, all lifts and leads etc. complete. | - | CUM | - | - |
| 3 | Providing first class M-100 brick work in 1:4 CM including cost of all materials, labour T & P, all lifts and leads etc. for proper completion of work. | 1 | CUM | - | - |
| 4 | Providing and Laying lean concrete (1:4:8) cement concrete including cost of all materials,, labour, T&P, all lifts and leads etc. complete. | - | CUM | - | - |
| 5 | Providing and Laying M-15 C.C. (1:2:4) cement concrete including cost of all materials, labour T & P, all lifts and leads etc. complete. | 0.6 | CUM | - | - |
| 6 | Providing and Laying M-20 C.C.1:1.5:3 cement concrete including cost of all materials, labour T & P, all lifts and leads etc. complete. | - | CUM | - | - |
| 7 | Providing and Laying M-20 R.C.C.1:1.5:3 cement concrete including cost of all materials, labour T & P, all lifts and leads etc. complete. | - | CUM | - | - |
| 8 | Providing and Laying M-25 C.C.1:1:2 cement concrete including cost of all materials, labour T & P, all lifts and leads etc. complete. | - | CUM | - | - |
| 9 | Providing and fixing steel reinforcement including cost of steel, binding wire, bending, binding, welding, cutting, placing in proper position, all lifts and leads, all labour and T&P etc. | 1 | MT. | - | - |
| 10 | Providing and fixing Centering & shuttering for C.C. works (form work of concrete) including cost of all material, labour, T&P, all lifts and leads, etc for proper completion of work. | 0.6 | SQM | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.37 MB
TD31EE2627.pdf
Tender Documents • 1.86 MB
BOQ_2138402.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .