Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹1.2 CrAccepted-AOC POLICE LINE ROAD KUMOUR PITHORAGARH | ₹1.2 Cr | 1 | Accepted-AOC L1 |
| 2 | 2₹1.2 Cr+₹1.5 L (1.29%)Rejected-AOC | ₹1.2 Cr+₹1.5 L (1.29%) | 2 | Rejected-AOC L2 |
| 3 | 3₹1.2 Cr+₹2.7 L (2.23%)Rejected-AOC 825 GANDHI CHOWK RANIKHET 263645 DISTRICT ALMORA | RANIKHET | ALMORA | UTTARAKHAND | 263645 | ₹1.2 Cr+₹2.7 L (2.23%) | 3 | Rejected-AOC L3 |
Tender Value
₹1.2 Cr
EMD Value
₹2.4 L
Closing Date
24 Apr 2023, 4:00 pmClosed
SUPERINTENDING ENGINEER
SE OFFICE EDC PITHORAGARH
Construction of 11 KV Line for providing connection to VASUKINAG Drinking Water Scheme Jal Jeewan Mission JJM on turn key basis under EDD PITHORAGARH under Deposit Head
2023_UPCL3_57059_2
33/EDC(P)/2022-23
Open Tender
Electrical Works
Turn-key
120 days
PITHORAGARH
Please refer Tender documents.
2 documents required · 2 mandatory
₹11,800
EE EDD UPCL PITHORAGARH
₹2.4 L
29 Sept 2023
17 Apr 2023
25 Apr 2023
17 Apr 2023
24 Apr 2023
17 Apr 2023
Amount
SUPPLY OF CENTRALISED MATERIAL
Pole STP SP23 8.5 Mtr long (Hot bouttom deep)
MS Channel 100x50mm
MS Angle 50x50x6mm
11 KV polymer Pin insulator with Nut
11 KV polymer Disc insulator with Nut
11 KV Disc fitting 45 KN
ACSR weasel conductor for earthing
ACSR Rabbit conductor
Stay Set 16x1800 mm
Stay wire 7/10 SWG
MS earth rod 20x2500mm
Earth wire 7/16 SWG
11 KV PRMC 20/5 (S/S side & end Side )
L.T. Pil.resi M.C. CTR for all ration (C.T. Accuracy Class-1)
11 KV FDR VCB Pannel 350/500 MVA
11 KV XLPE Cable 3x120 sqmm
11kv XLPE Cable jointing kit 3x120 sq mm Indoor
11kv XLPE Cable jointing kit 3x120 sq mm Outdoor
11 KV GO switch
11/0.4 KV,25 to 63 KVA T/F
LT XLPE 1X70sqmm
9 KV 5KA Lighting arrester polymer
MS earth rod 20x2500mm
GI wire 10 SWG for earthing
MS channel 75x75x8 mm
ACSR weasel conductor
Pole STP SP21 8.5 Mtr long (bottom portion hot dip galvanized)
Stay set 16x1800mm
Stay wire 7/10 SWG
SUPPLY OF NON CENTRALISED MATERIAL
Top Channel holding Clamp for SP23 with N&B
Bracing Clamp for Top with N&B
Bracing Clamp for Bouttom with N&B
Stay Clamp for SP23 with N&B D/E
Stay Clamp for SP23 with N&B S/E
Earth Wire Clamp with N&B
11 KV Fuse Set
Stay Insulator
Alu. Lugs HT
Alu. Lugs LT
Holding Clamp for T/F Base
LT Shackle insulator clamp for SP21
Shackle insulator for SP-21
LT Stay Clamp
LABOUR CHARGE
Cartage of pole road site of work by road transport.
STP SP23 8.5 mtr long
Cartage of other line matrials conductor, clamp, insulator, etc road site of work by road transport.
Cartage of 11 KV FDR VCB Pannel 350/500 MVA road site of work by road transport.
Head load Cartage of Pole & Other All material from road side to work side . Avgg. Dist. 4 km
STP SP23 8.5 mtr long
Small matrial
Excavation of earth for Pole of size 0.9x.6x1/6 of full length of pole for erecation of pole in all type of soil including as per dressing of sides and ramming of bottom including getting out the excavated soil and disposel surpplus excavated soil as directed complete work.
STP SP23 8.5 mtr long
Erecation of following Single/ Double pole of HT line in proper level and alignment along with fixing of all accessories like top channel and clamp as per RESPO
Four pole of SP-23
Double pole of SP-23
Single pole of SP-23
Grouting of pole in size .45x.45x1/9of the pole in 1:4:8 cc including cost of cement sand and stone ballast back filling of soil and bolder in pit and ramming and proper aligment leveeling as per RESPO
Muffing of poles 0.45x0.45x0.300 mm with 1:3:6 cc block and 45cm hight from ground level including cost of blast cement etc.
Fabrication of MS Channel angle iron after cutting in required sizes with drilling of holes upto good finish for top channel, bracing, and speecial type bracket etc.
Excavation of earth for Stay of size 0.6x.6x1.2 mtr in all type of soil including as per dressing of sides and ramming of bottom including getting out the excavated soil and disposel surpplus excavated soil as directed complete work.
Fixing, Tighting Stay and Nozzling sagging with pole and stay rod on required tension as per RESPO
11 KV Stay
Grouting of Stay in size 0.6x0.6x1.2 Mtr in 1:4:8 cc including cost of cement sand and stone ballast back filling of soil and bolder in pit and ramming and proper aligment leveeling as per RESPO
Earthing of support with MS earth rod of 2.5 mtr long to proper depth and connecting pole by earth wire as per RESPO
Laying, spreading, stringing and sagging of 11 KV line in 3 P 4 W of the Rabbit conductor with GI earth wire complete including fixing of all accessories in 3 Nos conductor in parallel with binding and jupering as per profile and sagging chart
ACSR Rabbit conductor 3 P 4 W.
Mounting & fixing of TPMO on doubal pole structure includng making of connection complete work.
Mounting & fixing of fuse set on doubal pole structure includng making of connection complete work.
Jointing and fixing of cable jointing kits indoor/outdoor for 11KV cable
Providing an dfixing of danger board and number plate complete by providing M Sflate clamp 50x6 mm with N&B
Installation of 11 KV Metering cubical in the metering room with grouting and making all connection. And CT&PT unit
Erecation of 11 KV VCB Pannel in all respect making connection testing in all respect at S/S
Route cleareance by of tree branches by looping and chopping of tree for 11 KV line
Retaing wall as per annexture -1
Cartage of other matrials from store center pithoragarh to road site of work including loading & unloding by road transport. Avgg. Dist. 125 km
11/0.4 KV, 63 KVA T/F
Head load cartage of the following transformer with loading and unloading T/F/Km Avg. Dist 4.00 Km
11/0.4 KV, 63 KVA T/F
Small matrial
Installation/mounting of new transformer on double pole structure and fixing of channel/angle.and making connection of HT/LT side and its complete connections.
11/0.4 KV, 63 KVA T/F
Grouting of earth rod 2500 mm 0.6 mtr. below from ground level and 2.5 mtr. away from the pole. Connection of earth rod with pole by G.I. wire and nut bolt.
Mounting and Fixing of L.A. Set (03 No./T/F) on double pole structure including making of all connection.Complete Job
Earthing of distribution transformer including digging of pit of size 2.5 mtr depth and make hole of size 150 mm placing of earthing electrode to (to be supplyed by contractors) connecting the same with GI strip of size 35x6mm minim length 6mtr,tretment of soil with highly conductive substance as per IS
Cartage of pole from store center pithoragarh to road site of work by road transport. Avgg. Dist. 125 km
STP SP21 8.5 mtr long
Cartage of other line matrials conductor, clamp, insulator etc.from store center pithoragarh to road site of work by road transport. Avgg. Dist. 50 km
Head load Cartage of Pole & Other material from road side to wotk side Approximate distance 4 km.
SP-21 pole
Small matrial
Excavation of earth for Pole of size 0.9x.6x1/6 of full length of pole for erecation of pole in all type of soil including as per dressing of sides and ramming of bottom including getting out the excavated soil and disposel surpplus excavated soil as directed complete work.
Erecation of following single pole in proper level and alignment along with fixing of all accessories like top channel and clamp as per RESPO
Single pole of SP21
Grouting of pole in size .45x.45x1/9of the pole in 1:4:8 cc including cost of cement sand and stone ballast back filling of soil and bolder in pit and ramming and proper aligment leveeling as per RESPO
Muffing of poles 0.45x0.45x0.300 mm with 1:3:6 cc block and 45cm hight from ground level including cost of blast cement etc.
Excavation of earth for Stay of size 0.6x.6x1.2 mtr in all type of soil including as per dressing of sides and ramming of bottom including getting out the excavated soil and disposel surpplus excavated soil as directed complete work.
Fixing, Tighting Stay and Nozzling sagging with pole and stay rod on required tension as per RESPO
LT Stay
Grouting of Stay in size 0.6x0.6x1.2 Mtr in 1:4:8 cc including cost of cement sand and stone ballast back filling of soil and bolder in pit and ramming and proper aligment leveeling as per RESPO
Laying, spreading , striging and sagging of LT line of thefollowing wire as phacomplete with binding and Jumpring as per RESPO
vijay electricals
M/s Kashmirilal Constructions Pvt. Ltd.
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .