Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹393.0 CrAccepted-AOC | 1 | Accepted-AOC L1 Bidder | |
| 2 | 2₹405 Cr+₹12.0 Cr (3.05%)Rejected-Finance 401 THE GRAND MALL OPP STATE BANK ZONAL OFFICE S M ROAD AMBAWADI AHMEDABAD 380015 | AHMADABAD | GUJARAT | 380015 | 2 | Rejected-Finance L2 Bidder | |
| 3 | 3₹409.4 Cr+₹16.4 Cr (4.17%)Rejected-Finance 605 607 6 FLOOR SHRIKANT CHAMBERS PHASE 1 6 FLOOR ADJACENT TO R K STUDIOS MUMBAI 400071 MAHARASHTRA INDIA | 3 | Rejected-Finance L3 Bidder |
| Sl No | Description | Qty | Unit | Capacite Infraprojects Limited L3 | Dineshchandra R Agrawal Infracon Pvt. Ltd. L2 | PSP Projects Limited L1 |
|---|---|---|---|---|---|---|
| 1.01 | 1200007313
C - EXCAVATION -ALL DEPTHS - LEAD l.5KM
Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means (if required) for all type of soil in both dry and wet conditions, sand, gravel, hard Murrum / completely weathered rock, all area, all depth including removal of stumps of trees of girth of all sizes, shuttering, shoring, strutting or any other safe methods for protection of excavated surface, dressing of sides and ramming of bottom, and transporting the excavated material within a lead of 1.5 KM radius, stacking, spreading and levelling, etc. as per detailed technical specifications and as directed by Engineer-in-charge.
Note -
a. Plan area of base PCC as per structural drawing shall be measured for payment (unless otherwise specified). Contractor shall quote the rate for excavation with additional quantity for surrounding working space (which shall not be paid)
b. Rate shall be inclusive of dewatering work (if required) while any earth work activity in under water condition or during rain or due to any other reason. | 1,24,835 | M3 | 243 ₹3,03,34,905 | 179.55 ₹2,24,14,124.25 Lowest | 362 ₹4,51,90,270 |
| 1.02 | 1200007314
C - FILLING - EXCAVATED SOIL- 20CM LAYER
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, for all lead and lifts, including dewatering (pumping out water/ mud) etc complete as per detailed technical specifications and as
directed by engineer in charge. | 37,635 | M3 | 162 ₹60,96,870 Lowest | 213.75 ₹80,44,481.25 | 213 ₹80,16,255 |
| 1.03 | 1200007315
C - FILLING - RIVER SAND/ CRUSHED SAND
Supplying and filling in plinth with river sand/ manufactured sand conforming to Zone - V, for all lead and lifts under floors/ in plinth etc including, watering,
_a_m_ming consolidating and dressing complete as per detailed technical specifications and as directed by engineer in charge. | 1,100 | M3 | 1,263 ₹13,89,300 Lowest | 2,479.5 ₹27,27,450 | 2,192 ₹24,11,200 |
| 1.04 | 1200007316
C-PRE-CONSTRUCTION ANTI-TERMITE TREATMNT
Providing and injecting Chemical emulsion for PRE - CONSTRUCTIONAL anti-termite treatment and creating a chemical barrier on the top surface of plinth filling, inside junction of wall and floor, on top of damp proof course or on masonry at level of plinth filling as per IS 6313 (Part-2)-2013 using chemical like lmidacloprid 30.5% SC (CIB approved) and proportion of dilution with water shall be as per manufacturer's specification. The emulsion shall be applied as mentioned below, all as per detailed technical specifications and directions of Engineer-in-charge. Plinth area in plan at GF shall only be measured and paid. A guarantee bond of 10 years shall be furnished in prescribed proforma. Rate shall be inclusive of material required for Anti Termite Treatment and labour and equipment's required for applying in any condition all etc. complete as directed by engineer in charge. (Stage of treatment may be vary as per site condition. Contractor shall be approved by Engineer in charge before execution.)
a) Treatment to soil below raft- Before laying the rubble soling and PCC, the compact and levelled soil shall be treated at 5 liters per sq m. OR In case of soils/sand filled above the raft, the treatment at 5 liters per sq m shall be carried out on the top surface of filled soil/sand.
b) Treatment to soil along the retaining wall - The soil retained by the walls (soil coming in contact with retaining wall) shall be treated at the rate of 7.5 liter per sq m of the vertical surface in full depth.
c) Treatment of soil along external perimeter of building- After the building is complete, the earth along the external perimeter of the building shall be rodded at intervals of 150 mm and to a depth of 300 mm. The rods should be moved backward and forward, parallel to the wall to break up the earth and emulsion poured along the wall at the rate of 7.5 liter per square meter of vertical surfaces.
d) Top surface of the plinth filling including damp proof courses at the rate of 5 liter /sqm of internal plinth area (if required)( As per IS:6313 Part 11-2013). For any area without basement, treatment shall be done as per IS:6313 Part-11-2013.
e) Treatment of soil surrounding pipes, wastes and conduits - When pipes, wastes and conduits enter the soil inside the area of the foundation, soil surrounding the point of entry shall be loosened around each of such pipe, waste or conduits for a distance of 150mm and up to a depth of 75 mm before the treatment is commenced. When they enter the soil external to the foundation, they shall be similarly treatment for a distance of 300 mm, unless they stand clear of the walls of the building are about 75 mm.
f) 1 liter/ linectr meter alon unction of wall and floor at all stages
g) 2 litre per linear meter for expansion joints in touch with soil/sand.
Plinth area of Ground Floor of the building shall be considered for payment in sqm. | 4,775 | M2 | 190 ₹9,07,250 | 133 ₹6,35,075 | 118 ₹5,63,450 Lowest |
| 1.05 | 1200007317
C - P&L - PLAIN CEMENT CONCRETE - M l5
Providing and laying in position ready mixed design mix cement concrete for MlS grade plain cement concrete work; using coarse aggregate and fine aggregate as per CPWD/BIS specifications, Portland Pozzolana/ Portland slag cement, admixtures in recommended proportions as per IS:9103 to accelerate/ retard select of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, dewatering (pumping or bailing out water/ mud and removing slush), curing, carriage for all leads, cost of centering, shuttering and finishing as per direction of Engineer in charge; for all height/ depth, etc. all complete as per detailed technical specifications and as directed by Engineer-in-charge.
Note - PPC (Pozzolana Portland Cement) shall be used for all concrete work having minimum 25% fly ash content as per Green building norms except in self
compacting concrete (SCC). | 870 | M3 | 7,809 ₹67,93,830 | 7,322.75 ₹63,70,792.5 | 6,678 ₹58,09,860 Lowest |
| 1.06 | 1200007318
C - P&L - RUBBLE SOLING -AVG 230MM THK
Providing and laying rubble soling in foundation and for plinth protection, of average 230 mm thickness (compacted), filling, covering and levelling the surface with a layer of sand after filling the voids (up to 25%) with smaller sized black trap stones 20-40mm, 40-63mm, 63-90, 90-150mm size of stone/ metals or stone chips, including watering, dewatering (pumping or bailing out water/ mud and removing slush) ramming well and consolidating each layer by plate compactor /static roller/vibratory roller of required capacity for all lead and lifts/ depth as per detailed technical specifications and as directed by Engineer-in charge | 1,210 | M3 | 3,126 ₹37,82,460 | 2,859.5 ₹34,59,995 | 2,124 ₹25,70,040 Lowest |
| 1.07 | 1200007319
C - P&F-TMT BARS INCL. COUPLER - FE 550D
Reinforcement for R.C.C.work including straightening, cutting, bending, placing in position and binding (with GI wire) all complete for all leads and lifts, all level, all floors including the basement. Reinforcement work shall be including lapping, providing necessary chairs,pins, spacers and also including Providing and fixing parallel threaded couplers/ reducer conforming to IS :16172 on to reinforcement bars including threading, enlargement at connection by forging, protecting the prepared reinforcement bars and related operations as required to complete the works as per detailed technical specifications and as per direction of Engineer in-Charge. Position of coupler shall be approved by Engineer in charge. Contractor shall use SAIL, TATA (TISCO), RINL, JSW steel, JSPL tmt bars make for the work and couplers of sanfield, dextra, halfen moment, G-tech or equivalent approved make.
Thermo-Mechanically Treated bars TMT (Fe 550 D)
No separate payment for chairs, laps, pins, spacers, wastage and binding wire will be made. | 6,350 | MT | 1,19,509 ₹75,88,82,150 | 1,12,969.31 ₹71,73,55,118.5 | 99,170 ₹62,97,29,500 Lowest |
| 1.08 | 1200007320
C - P&L - RCC INCLUDING FORMWORK - M25
Providing and laying in position ready mixed design mix cement concrete for reinforced cement concrete work, using coarse aggregate and fine aggregate as per CPWD/BIS specifications, Portland Pozzolana/ Portland Slag cement,·admixtures in recommended proportions as per IS:9103 to accelerate/ retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, dewatering (if required), curing, carriage for all leads, centering and shuttering; but excluding the cost of reinforcement as per direction of engineer in charge; for all floor, all height/ depth, all level etc. all complete as per detailed technical specifications and as directed by Engineer-in-charge.
Note-
1) This item shall also include cost of transportation of concrete from plant to site and within site.
2) Item includes cost of cement as approved in design mix. Nothing extra shall be paid or recovered on account of quantity of cement.
3) All type of shuttering shall be designed by contractor and submitted to Engineer in charge along with design calculations (if required) for approval. Shuttering shall be executed as per approved shop drawing and design calculation. No extra payment for the above.
4) Rate shall be inclusive of dewatering (if required) while any construction activity in under water condition.
5) Rate shall be inclusive of providing grooves, drip moulds, pockets, cut-outs etc. and co-ordination of insert sleeves, insert plate(cost of insert plate shall be paid separately), encasing if any wherever required while casting for all level all height.
6) PPC (Pozzolana Portland Cement) shall be used for all concrete work having minimum 25% fly ash content as per Green building norms except in self compacting concrete (SCC).
7) Any Special formwork/ provisions, if required, for SCC shall be provided by the contractor and nothing extra shall be payable on this account.
Concrete of M 25 grade | 1,035 | M3 | 11,894 ₹1,23,10,290 | 18,142.17 ₹1,87,77,145.95 | 8,054 ₹83,35,890 Lowest |
| 1.10 | 1200007321
C - P&L - RCC INCLUDING FORMWORK - M30
Providing and laying in position ready mixed design mix cement concrete for reinforced cement concrete work, using coarse aggregate and fine aggregate as per CPWD/BIS specifications, Portland Pozzolana/ Portland Slag cement, admixtures in recommended proportions as per IS:9103 to accelerate/ retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, dewatering (if required), curing, carriage for all leads, centering and shuttering; but excluding the cost of reinforcement as per direction of engineer in charge; for all floor, all height/ depth, all level etc. all complete as per detailed technical specifications and as directed by Engineer-in-charge.
Note-
1) This item shall also include cost of transportation of concrete from plant to site and within site.
2) Item includes cost of cement as approved in design mix. Nothing extra shall be paid or recovered on account of quantity of cement.
3) All type of shuttering shall be designed by contractor and submitted to Engineer in charge along with design calculations (if required) for approval. Shuttering shall be executed as per approved shop drawing and design calculation. No extra payment for the above.
4) Rate shall be inclusive of dewatering (if required) while any construction activity in under water condition.
5) Rate shall be inclusive of providing grooves, drip moulds, pockets, cut-outs etc. and co-ordination of insert sleeves, insert plate(cost of insert plate shall be paid separately), encasing if any wherever required while casting for all level all height.
6) PPC (Pozzolana Portland Cement) shall be used for all concrete work having minimum 25% fly ash content as per Green building norms except in self compacting concrete (SCC).
7) Any Special formwork/ provisions, if required, for SCC shall be provided by the contractor and nothing extra shall be payable on this account.Concrete of M 30 grade | 10 | M3 | 13,768 ₹1,37,680 Lowest | 18,216.5 ₹1,82,165 | 13,903 ₹1,39,030 |
| 1.11 | 1200007322
C - P&L - RCC INCLUDING FORMWORK - M35
Providing and laying in position ready mixed design mix cement concrete for reinforced cement concrete work, using coarse aggregate and fine aggregate as per CPWD/BIS specifications, Portland Pozzolana/ Portland Slag cement, admixtures in recommended proportions as per IS:9103 to accelerate/ retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, dewatering (if required), curing, carriage for all leads, centering and shuttering; but excluding the cost of reinforcement as per direction of engineer in charge; for all floor, all height/ depth, all level etc. all complete as per detailed technical specifications and as directed by Engineer-in-charge.
Note-
1) This item shall also include cost of transportation of concrete from plant to site and within site.
10 2) Item includes cost of cement as approved in design mix. Nothing extra shall be paid or recovered on account of quantity of cement. M3
3) All type of shuttering shall be designed by contractor and submitted to Engineer in charge along with design calculations (ifrequired) for approval. Shuttering shall be executed as per approved shop drawing and design calculation. No extra payment for the above.
4) Rate shall be inclusive of dewatering (if required) while any construction activity in under water condition.
5) Rate shall be inclusive of providing grooves, drip moulds, pockets, cut-outs etc: and co-ordination of insert sleeves, insert plate(cost of insert plate shall be paid separately), encasing if any wherever required while casting for all level all height.
6) PPC (Pozzolana Portland Cement) shall be used for all concrete work having minimum 25% fly ash content as per Green building norms except in self compacting concrete (SCC).
7) Any Special formwork/ provisions, if required, for SCC shall be provided by the contractor and nothing extra shall be payable on this account.Concrete ofM 35 grade | 15,555 | M3 | 13,846 ₹21,53,74,530 | 10,520.24 ₹16,36,42,333.2 Lowest | 11,870 ₹18,46,37,850 |
Tender Value
Refer Docs
EMD Value
₹3.9 Cr
Closing Date
23 Feb 2024, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
MD and Group CEO, GIFTCL
EPS Building 49A, Block 49, Zone 4, Gyan Marg, GIFT City, Gandhinagar, Gujarat, 382355
Construction of Fintech building at GIFT City, Gujarat
2024_GIFTC_184852_1
CW-01
Open Tender
Civil Works - Buildings
Item Rate
1095 days
As per Tender Document
As per Tender Document
4 documents required · 4 mandatory
₹10,000
Gujarat International Finance Tec-City Company Lim
₹3.9 Cr
16 Mar 2024
7 Feb 2024
23 Feb 2024
7 Feb 2024
23 Feb 2024
7 Feb 2024
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0.000 | 1200007313
C - EXCAVATION -ALL DEPTHS - LEAD l.5KM
Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means (if required) for all type of soil in both dry and wet conditions, sand, gravel, hard Murrum / completely weathered rock, all area, all depth including removal of stumps of trees of girth of all sizes, shuttering, shoring, strutting or any other safe methods for protection of excavated surface, dressing of sides and ramming of bottom, and transporting the excavated material within a lead of 1.5 KM radius, stacking, spreading and levelling, etc. as per detailed technical specifications and as directed by Engineer-in-charge.
Note -
a. Plan area of base PCC as per structural drawing shall be measured for payment (unless otherwise specified). Contractor shall quote the rate for excavation with additional quantity for surrounding working space (which shall not be paid)
b. Rate shall be inclusive of dewatering work (if required) while any earth work activity in under water condition or during rain or due to any other reason. | 1,24,835 | M3 | - | - |
| 0.000 | 1200007314
C - FILLING - EXCAVATED SOIL- 20CM LAYER
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, for all lead and lifts, including dewatering (pumping out water/ mud) etc complete as per detailed technical specifications and as
directed by engineer in charge. | - | M3 | - | - |
| 0.000 | 1200007315
C - FILLING - RIVER SAND/ CRUSHED SAND
Supplying and filling in plinth with river sand/ manufactured sand conforming to Zone - V, for all lead and lifts under floors/ in plinth etc including, watering,
_a_m_ming consolidating and dressing complete as per detailed technical specifications and as directed by engineer in charge. | - | M3 | - | - |
| 0.000 | 1200007316
C-PRE-CONSTRUCTION ANTI-TERMITE TREATMNT
Providing and injecting Chemical emulsion for PRE - CONSTRUCTIONAL anti-termite treatment and creating a chemical barrier on the top surface of plinth filling, inside junction of wall and floor, on top of damp proof course or on masonry at level of plinth filling as per IS 6313 (Part-2)-2013 using chemical like lmidacloprid 30.5% SC (CIB approved) and proportion of dilution with water shall be as per manufacturer's specification. The emulsion shall be applied as mentioned below, all as per detailed technical specifications and directions of Engineer-in-charge. Plinth area in plan at GF shall only be measured and paid. A guarantee bond of 10 years shall be furnished in prescribed proforma. Rate shall be inclusive of material required for Anti Termite Treatment and labour and equipment's required for applying in any condition all etc. complete as directed by engineer in charge. (Stage of treatment may be vary as per site condition. Contractor shall be approved by Engineer in charge before execution.)
a) Treatment to soil below raft- Before laying the rubble soling and PCC, the compact and levelled soil shall be treated at 5 liters per sq m. OR In case of soils/sand filled above the raft, the treatment at 5 liters per sq m shall be carried out on the top surface of filled soil/sand.
b) Treatment to soil along the retaining wall - The soil retained by the walls (soil coming in contact with retaining wall) shall be treated at the rate of 7.5 liter per sq m of the vertical surface in full depth.
c) Treatment of soil along external perimeter of building- After the building is complete, the earth along the external perimeter of the building shall be rodded at intervals of 150 mm and to a depth of 300 mm. The rods should be moved backward and forward, parallel to the wall to break up the earth and emulsion poured along the wall at the rate of 7.5 liter per square meter of vertical surfaces.
d) Top surface of the plinth filling including damp proof courses at the rate of 5 liter /sqm of internal plinth area (if required)( As per IS:6313 Part 11-2013). For any area without basement, treatment shall be done as per IS:6313 Part-11-2013.
e) Treatment of soil surrounding pipes, wastes and conduits - When pipes, wastes and conduits enter the soil inside the area of the foundation, soil surrounding the point of entry shall be loosened around each of such pipe, waste or conduits for a distance of 150mm and up to a depth of 75 mm before the treatment is commenced. When they enter the soil external to the foundation, they shall be similarly treatment for a distance of 300 mm, unless they stand clear of the walls of the building are about 75 mm.
f) 1 liter/ linectr meter alon unction of wall and floor at all stages
g) 2 litre per linear meter for expansion joints in touch with soil/sand.
Plinth area of Ground Floor of the building shall be considered for payment in sqm. | - | M2 | - | - |
| 0.000 | 1200007317
C - P&L - PLAIN CEMENT CONCRETE - M l5
Providing and laying in position ready mixed design mix cement concrete for MlS grade plain cement concrete work; using coarse aggregate and fine aggregate as per CPWD/BIS specifications, Portland Pozzolana/ Portland slag cement, admixtures in recommended proportions as per IS:9103 to accelerate/ retard select of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, dewatering (pumping or bailing out water/ mud and removing slush), curing, carriage for all leads, cost of centering, shuttering and finishing as per direction of Engineer in charge; for all height/ depth, etc. all complete as per detailed technical specifications and as directed by Engineer-in-charge.
Note - PPC (Pozzolana Portland Cement) shall be used for all concrete work having minimum 25% fly ash content as per Green building norms except in self
compacting concrete (SCC). | - | M3 | - | - |
| 0.000 | 1200007318
C - P&L - RUBBLE SOLING -AVG 230MM THK
Providing and laying rubble soling in foundation and for plinth protection, of average 230 mm thickness (compacted), filling, covering and levelling the surface with a layer of sand after filling the voids (up to 25%) with smaller sized black trap stones 20-40mm, 40-63mm, 63-90, 90-150mm size of stone/ metals or stone chips, including watering, dewatering (pumping or bailing out water/ mud and removing slush) ramming well and consolidating each layer by plate compactor /static roller/vibratory roller of required capacity for all lead and lifts/ depth as per detailed technical specifications and as directed by Engineer-in charge | - | M3 | - | - |
| 0.000 | 1200007319
C - P&F-TMT BARS INCL. COUPLER - FE 550D
Reinforcement for R.C.C.work including straightening, cutting, bending, placing in position and binding (with GI wire) all complete for all leads and lifts, all level, all floors including the basement. Reinforcement work shall be including lapping, providing necessary chairs,pins, spacers and also including Providing and fixing parallel threaded couplers/ reducer conforming to IS :16172 on to reinforcement bars including threading, enlargement at connection by forging, protecting the prepared reinforcement bars and related operations as required to complete the works as per detailed technical specifications and as per direction of Engineer in-Charge. Position of coupler shall be approved by Engineer in charge. Contractor shall use SAIL, TATA (TISCO), RINL, JSW steel, JSPL tmt bars make for the work and couplers of sanfield, dextra, halfen moment, G-tech or equivalent approved make.
Thermo-Mechanically Treated bars TMT (Fe 550 D)
No separate payment for chairs, laps, pins, spacers, wastage and binding wire will be made. | - | MT | - | - |
| 0.000 | 1200007320
C - P&L - RCC INCLUDING FORMWORK - M25
Providing and laying in position ready mixed design mix cement concrete for reinforced cement concrete work, using coarse aggregate and fine aggregate as per CPWD/BIS specifications, Portland Pozzolana/ Portland Slag cement,·admixtures in recommended proportions as per IS:9103 to accelerate/ retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, dewatering (if required), curing, carriage for all leads, centering and shuttering; but excluding the cost of reinforcement as per direction of engineer in charge; for all floor, all height/ depth, all level etc. all complete as per detailed technical specifications and as directed by Engineer-in-charge.
Note-
1) This item shall also include cost of transportation of concrete from plant to site and within site.
2) Item includes cost of cement as approved in design mix. Nothing extra shall be paid or recovered on account of quantity of cement.
3) All type of shuttering shall be designed by contractor and submitted to Engineer in charge along with design calculations (if required) for approval. Shuttering shall be executed as per approved shop drawing and design calculation. No extra payment for the above.
4) Rate shall be inclusive of dewatering (if required) while any construction activity in under water condition.
5) Rate shall be inclusive of providing grooves, drip moulds, pockets, cut-outs etc. and co-ordination of insert sleeves, insert plate(cost of insert plate shall be paid separately), encasing if any wherever required while casting for all level all height.
6) PPC (Pozzolana Portland Cement) shall be used for all concrete work having minimum 25% fly ash content as per Green building norms except in self compacting concrete (SCC).
7) Any Special formwork/ provisions, if required, for SCC shall be provided by the contractor and nothing extra shall be payable on this account.
Concrete of M 25 grade | - | M3 | - | - |
| 0.000 | 1200007321
C - P&L - RCC INCLUDING FORMWORK - M30
Providing and laying in position ready mixed design mix cement concrete for reinforced cement concrete work, using coarse aggregate and fine aggregate as per CPWD/BIS specifications, Portland Pozzolana/ Portland Slag cement, admixtures in recommended proportions as per IS:9103 to accelerate/ retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, dewatering (if required), curing, carriage for all leads, centering and shuttering; but excluding the cost of reinforcement as per direction of engineer in charge; for all floor, all height/ depth, all level etc. all complete as per detailed technical specifications and as directed by Engineer-in-charge.
Note-
1) This item shall also include cost of transportation of concrete from plant to site and within site.
2) Item includes cost of cement as approved in design mix. Nothing extra shall be paid or recovered on account of quantity of cement.
3) All type of shuttering shall be designed by contractor and submitted to Engineer in charge along with design calculations (if required) for approval. Shuttering shall be executed as per approved shop drawing and design calculation. No extra payment for the above.
4) Rate shall be inclusive of dewatering (if required) while any construction activity in under water condition.
5) Rate shall be inclusive of providing grooves, drip moulds, pockets, cut-outs etc. and co-ordination of insert sleeves, insert plate(cost of insert plate shall be paid separately), encasing if any wherever required while casting for all level all height.
6) PPC (Pozzolana Portland Cement) shall be used for all concrete work having minimum 25% fly ash content as per Green building norms except in self compacting concrete (SCC).
7) Any Special formwork/ provisions, if required, for SCC shall be provided by the contractor and nothing extra shall be payable on this account.Concrete of M 30 grade | - | M3 | - | - |
| 0.000 | 1200007322
C - P&L - RCC INCLUDING FORMWORK - M35
Providing and laying in position ready mixed design mix cement concrete for reinforced cement concrete work, using coarse aggregate and fine aggregate as per CPWD/BIS specifications, Portland Pozzolana/ Portland Slag cement, admixtures in recommended proportions as per IS:9103 to accelerate/ retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, dewatering (if required), curing, carriage for all leads, centering and shuttering; but excluding the cost of reinforcement as per direction of engineer in charge; for all floor, all height/ depth, all level etc. all complete as per detailed technical specifications and as directed by Engineer-in-charge.
Note-
1) This item shall also include cost of transportation of concrete from plant to site and within site.
10 2) Item includes cost of cement as approved in design mix. Nothing extra shall be paid or recovered on account of quantity of cement. M3
3) All type of shuttering shall be designed by contractor and submitted to Engineer in charge along with design calculations (ifrequired) for approval. Shuttering shall be executed as per approved shop drawing and design calculation. No extra payment for the above.
4) Rate shall be inclusive of dewatering (if required) while any construction activity in under water condition.
5) Rate shall be inclusive of providing grooves, drip moulds, pockets, cut-outs etc: and co-ordination of insert sleeves, insert plate(cost of insert plate shall be paid separately), encasing if any wherever required while casting for all level all height.
6) PPC (Pozzolana Portland Cement) shall be used for all concrete work having minimum 25% fly ash content as per Green building norms except in self compacting concrete (SCC).
7) Any Special formwork/ provisions, if required, for SCC shall be provided by the contractor and nothing extra shall be payable on this account.Concrete ofM 35 grade | - | M3 | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
BOQ_202377.xls
BOQ Document • 1.22 MB
138946840.pdf
Tender Document • 0.11 MB
Tender_Document.pdf
Tender Document • 6.74 MB
Techncial_Specification_MEPF.pdf
Tender Document • 4.30 MB
Link_Tender_Drawing.pdf
Tender Document • 0.07 MB
Addendum1.pdf
Tender Document • 0.06 MB
Addendum2.pdf
Tender Document • 0.07 MB
PreBid_Clarifications_and_Addendum_03.pdf
Tender Document • 0.10 MB
Updated_Drawings_for_Fintech_Building.pdf
Tender Document • 0.06 MB
Updated_Bill_of_Quantities.pdf
Tender Document • 1.49 MB
Addendum4.pdf
Tender Document • 0.07 MB
138946842.html
Tender Document • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .