| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.4 LAccepted-AOC | ₹5.4 L Quoted ₹5.8 L | L1 | Accepted-AOC I lowest |
| 2 | L2₹6.6 L+₹72,186.66 (12.4%)Rejected-AOC | ₹6.6 L+₹72,186.66 (12.4%) | L2 | Rejected-AOC II lowest |
Tender Value
₹5.6 L
EMD Value
₹13,900
Closing Date
14 May 2026, 4:00 pmClosed
Executive Engineer,PMU,Kottarakkara
PMU, Electrical Circle,Kottarakkara
Construction of HT line from Malayil to Mavila for rerouting Pooyappally feeder under Electrical Section Veliyam of Electrical Division,Kundara
2026_KSEB_848764_1
E-TENDER/2026-27/4153/25E dated 21-04-2026
Open Tender
Electrical Works
Percentage
120 days
Electrical Section, Veliyam
Please refer Tender documents.
8 documents required · 8 mandatory
₹1,416
₹13,900
21 Jul 2026
29 Apr 2026
18 May 2026
29 Apr 2026
14 May 2026
29 Apr 2026
29 Apr 2026 - 14 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Fitting and erecting one HT PSC Single Pole in position, including fitting cross arm, digging and backfilling pit in ordinary soil (as per standards), drawing sufficient length of GI earthing leads from F clamp through V cross arm to the ground for earthing (excluding provision of earthing). | 31 | No | 3,274.36 | ₹1,01,505.16 |
| 2 | Fitting one Additional 2.4m/3m Channel cross arm (100x50x6mm), in existing 11KV DP including conveyance of materials. | 10 | No | 564.55 | ₹5,645.5 |
| 3 | Transporting poles by hired vehicle to a distance up to 5km and carrying up to 4 numbers of poles excluding loading & unloading charges. | 11 | Trip | 3,142.26 | ₹34,564.86 |
| 4 | Labour charges for loading HT PSC pole from the stacking place and unloading the same at work site (transportation by any vehicle). | 39 | No | 762.14 | ₹29,723.46 |
| 5 | Additional rate for providing one disc set, PG clamp etc. complete, on any type of HT pole for making cut point. | 105 | No | 158.91 | ₹16,685.55 |
| 6 | Fitting one Additional 75x40mm, 1.8m channel cross arm in existing single pole including conveyance of materials | 14 | No | 481.95 | ₹6,747.3 |
| 7 | Fitting one Additional V cross arm in existing single pole including conveyance of materials. | 1 | No | 481.95 | ₹481.95 |
| 8 | Labour charges for loading HT A type pole from the stacking place and unloading the same at work site (transportation by any vehicle). | 5 | No | 906.41 | ₹4,532.05 |
| 9 | Fitting and erecting one HT A type single Pole in position, including fitting cross arm, digging and back filling pit in ordinary soil (as per standards), drawing sufficient length of GI earthing leads from F clamp through V cross arm to the ground for earthing (excluding provision of earthing). | 5 | No | 4,143.14 | ₹20,715.7 |
| 10 | Fitting and providing one HT stay for 11KV pole including digging and back filling pit in ordinary soil. | 30 | No | 1,373.73 | ₹41,211.9 |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1434646.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.24 MB
Tenderdocuments25E.pdf
Tender Documents • 1.00 MB
BOQ_1434646.xls
BOQ • 0.40 MB
Corrigendum25E.pdf
PDF • 0.37 MB
dateextensioncorrigendum25E.pdf
PDF • 0.21 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .