Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance 121004 | Admitted-Finance |
| 2 | Admitted-Finance 101 PRIDE KUMAR SENATE BUILDING SENAPATI BAPAT ROAD SENAPATI BAPAT ROAD PUNE MAHARASHTRA 411016 | PUNE | MAHARASHTRA | 411016 | Admitted-Finance |
| 3 | Admitted-Finance 0 601 RUNWAL ANTHURIUM TOWER NO 5 OPP VEENA NAGAR L B S MULUND WEST MUMBAI MAHARASHTRA 400080 | MUMBAI SUBURBAN | MAHARASHTRA | 400080 | Admitted-Finance |
| 4 | Admitted-Finance N A | PALWAL | HARYANA | 121004 | Admitted-Finance |
| 5 | Admitted-Finance 121004 | Admitted-Finance |
Tender Value
Refer Docs
Closing Date
13 Sept 2021, 3:00 pmClosed
R. Govindarajan
Technip India Ltd. 19, Velachery Main Road, Guindy, Chennai - 600032.
Design, Engineering, Manufacturing, Inspection including inspection by TPIA, testing at manufacturers work, Packing, Supply of API 610 Multistage Centrifugal Pumps
2021_REFHQ_138970_1
TP/077154C001/603/0910-002/013
Limited
Mechanical - Pumps, Compressors, Steam Turbines and Other Equipment
Supply
240 days
IOCL Gujarat - Vadodara
Please refer Tender documents.
5 documents required · 5 mandatory
Exempted
27 Jan 2022
30 Jul 2021
14 Sept 2021
30 Jul 2021
13 Sept 2021
25 Aug 2021
30 Jul 2021 - 7 Sept 2021
Design, Engineering, Manufacturing, Procurement of Materials and Bought out Components, Assembly at Shop, Testing at Manufacturer's Works, Inspection by TPIA (Bidder to arrange TPIA including all TPIA charges), Packing, Supply of the following Pumps as specified in the document, including Supply of all Commissioning Spares (Please refer Note-3) & Special Tools and Tackles, all Auxiliaries & Documentation as per the enclosed Standard Specifications, Job Specification, Data Sheets etc. and other Codes and Standards attached or referred in Material Requisition.
LCN SPLITTER BOTTOM PUMPS: 603-P-27 A/B (N)
Supervision at Site:
Supervision during Erection, Pre-Commissioning and Commissioning (Refer Note: 7 above) - Per diem charges for upto 8 hours work on normal working days
Supervision during Erection, Pre-Commissioning and Commissioning (Refer Note: 8 above) - Overtime rate/hour beyond normal 8 Hours work on normal working days
Supervision during Erection, Pre-Commissioning and Commissioning (Refer Note: 8 above) - Overtime rate/hour for work on weekly off days / Holidays (as applicable to project site)
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .