| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹20.4 LAccepted-AOC H NO 245 A NEAR PRIMARY SCHOOL NIRMALANAGAR XELDEM QUEPEM GOA 403705 | XELDEM | QUEPEM | GOA | 403705 | L1 | Accepted-AOC work order | |
| 2 | L2₹20.4 L+₹2,058.94 (0.10%)Rejected-Finance | L2 | Rejected-Finance L2 |
| Sl No | Description | Qty | Unit | Shanta Kulkarni L2 | M/S UNIQUE CONSTRUCTIONS L1 |
|---|---|---|---|---|---|
| 1.00 | Earthwork in excavation by mechanical/ manual means in all type of strata comprising any of the materials such as soil, sand, silt, clay, gravel, moorum of all varieties, shingles, pebbles all types of conglomerates, laterite rock, soft rock, ordinary rock, disintegrated rock or weathered rock, fissured/shattered, decomposed rock and all such other material either in full or in parts, as the case may be by adopting any approved method or methods as may be convenient or permitted incl. of chiseling, wedging etc. but blasting prohibited in all condition such as dry, moist, saturated, submerged, foul conditions etc including pumping or bailing out water/dewatering including setting out construction of shoring, strutting and bracing, removal of stump and other deleterious matter, dressing of sides and bottom, providing barricading, danger lighting, guarding etc. and backfilling the excavated earth to the extent required and disposal of surplus excavated soil/rock at specified areas with all leads and all lifts etc complete as per specification and drawing and as directed by the Engineer-in-charge etc. complete. | 250.44 | Cum | 301 ₹75,382.44 | 300.5 ₹75,257.22 Lowest |
| 2.00 | Rubble packing with hard laterite stone under floors including watering ramming and consolidating etc. in pipeline trenches and other foundations complete. | 20.7 | Cum | 2,322 ₹48,065.4 | 2,319 ₹48,003.3 Lowest |
| 3.00 | Centering and shuttering including struttings, propping etc. and removal of formwork for : a)Foundations, footings, bases for columns and mass concrete. | 352.34 | Sqm | 428 ₹1,50,801.52 | 426 ₹1,50,096.84 Lowest |
| 4.00 | Providing & laying cement concrete 1:2:4 (1 cement: 2 coarse sand: 4 graded granitic or basaltic stone aggrt. 20 mm. nominal size) excluding cost of centering, shuttering and finishing in: a. All works upto plinth level | 186.61 | Cum | 7,150 ₹13,34,261.5 | 7,144 ₹13,33,141.84 Lowest |
| 5.00 | Providing and fixing 40 mm dia G.I. Pipe railing in 3 rows complete with G.I. Fittings incl. Painting of pipes and fittings with white paint of approved quality incl. A priming coat with a ready mixed primer for new works incl. Providing R.C.C. 1:2:4 rail posts of size 0.15 x 0.15 x 1.00 M with base of 0.25 x 0.25 x 0.3 m at every 2 mts intervals and double rail post with a bar drawings inclusive of cost of reinforcement etc. all complete including white wash washing of rail posts etc. all complete. | 116 | RM | 1,016.7 ₹1,17,937.2 Lowest | 1,019 ₹1,18,204 |
Tender Value
₹19.4 L
EMD Value
₹38,805
Closing Date
16 Jun 2025, 4:00 pmClosed
EE XI, WRD
Ravonfond, Navelim
Restoration of eroded bank of existing field bund near Khanidev Temple in village Shiroda of Ponda Taluka
2025_WRD_22947_1
WDXI/PB/F.24/2025-26/378/Sr1
Open Tender
Miscellaneous Works
Item Rate
45 days
Ravonfond, Navelim
Please refer Tender documents.
3 documents required · 3 mandatory
₹3,000
₹38,805
1 Oct 2026
26 May 2025
18 Jun 2025
26 May 2025
16 Jun 2025
26 May 2025
Amount
Earthwork in excavation by mechanical/ manual means in all type of strata comprising any of the materials such as soil, sand, silt, clay, gravel, moorum of all varieties, shingles, pebbles all types of conglomerates, laterite rock, soft rock, ordinary rock, disintegrated rock or weathered rock, fissured/shattered, decomposed rock and all such other material either in full or in parts, as the case may be by adopting any approved method or methods as may be convenient or permitted incl. of chiseling, wedging etc. but blasting prohibited in all condition such as dry, moist, saturated, submerged, foul conditions etc including pumping or bailing out water/dewatering including setting out construction of shoring, strutting and bracing, removal of stump and other deleterious matter, dressing of sides and bottom, providing barricading, danger lighting, guarding etc. and backfilling the excavated earth to the extent required and disposal of surplus excavated soil/rock at specified areas with all leads and all lifts etc complete as per specification and drawing and as directed by the Engineer-in-charge etc. complete.
Rubble packing with hard laterite stone under floors including watering ramming and consolidating etc. in pipeline trenches and other foundations complete.
Centering and shuttering including struttings, propping etc. and removal of formwork for : a)Foundations, footings, bases for columns and mass concrete.
Providing & laying cement concrete 1:2:4 (1 cement: 2 coarse sand: 4 graded granitic or basaltic stone aggrt. 20 mm. nominal size) excluding cost of centering, shuttering and finishing in: a. All works upto plinth level
Providing and fixing 40 mm dia G.I. Pipe railing in 3 rows complete with G.I. Fittings incl. Painting of pipes and fittings with white paint of approved quality incl. A priming coat with a ready mixed primer for new works incl. Providing R.C.C. 1:2:4 rail posts of size 0.15 x 0.15 x 1.00 M with base of 0.25 x 0.25 x 0.3 m at every 2 mts intervals and double rail post with a bar drawings inclusive of cost of reinforcement etc. all complete including white wash washing of rail posts etc. all complete.
Shanta Kulkarni (BID ID -49687)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .