| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L2₹1.2 LAccepted-Finance KOOTTUPURAKKAL | ₹1.2 L | L2 | Accepted-Finance SECOND LOWEST |
| 2 | LI₹1.2 LAccepted-Finance | ₹1.2 L | LI | Accepted-Finance LOWEST |
| Sl No | Description | Qty | Unit | MUHAMMEDBASHEER.KA L2 | M KAJHA HUSSAIN L1 |
|---|---|---|---|---|---|
| 1.00LBMC Left bank ch:14/500 to 14/650 km | |||||
| 1.00 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 2.03 | cum | 260 ₹528.32 | 257.6 ₹523.44 |
| 1.00 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 2.03 | cum | 8,000 ₹16,256 | 7,932.1 ₹16,118.03 |
| 1.00 | 4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 0.06 | cum | 9,300 ₹595.20 | 9,235.05 ₹591.04 |
| 1.00 | 4.1.6:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded
stone aggregate 40 mm nominal size derived from natural sources) | 6.48 | cum | 8,400 ₹54,406.80 | 8,363.73 ₹54,171.88 |
| 1.00 | 4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns | 31.11 | sqm | 400 ₹12,446 | 386.12 ₹12,014.12 |
| 1.01 | 50.13.1:9 mm cement plastering of mix : 1:3 (1 cement : 3 fine sand ) including all cost of materials, labour charges etc complete | 18.41 | sqm | 350 ₹6,445.25 | 343.76 ₹6,330.34 |
| 1.01 | 2.25:Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m. | 2.03 | cum | 340 ₹690.20 | 318.44 ₹646.43 |
| 1.01 | 50.2.25.1:Filling with contractor's own earth ( excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m as per direction of site Engineer-in-charge | 39 | cum | 750 ₹29,253 | 727.77 ₹28,385.94 |
Tender Value
₹1.2 L
EMD Value
₹2,971
Closing Date
19 Feb 2026, 5:00 pmClosed
Assistant Executive Engineer
Assistant Executive Engineer canal sub div alathur
GENERAL EMERGENCY WORK 202526 Lining of LBMC Left bank Ch14500 to 14600 kmGeneral Civil Work
2026_Irrig_835665_1
37IRR/PI/TR/7647/2025_5_1_1/1
Open Tender
Civil Works - Canal
60 days
alathur
Please refer Tender documents.
7 documents required · 7 mandatory
₹555
Yes
₹2,971
Yes
24 Feb 2026
11 Feb 2026
21 Feb 2026
11 Feb 2026
19 Feb 2026
11 Feb 2026
11 Feb 2026 - 13 Feb 2026
LBMC Left bank ch:14/500 to 14/650 km
2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil
4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources)
4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources)
4.1.6:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 40 mm nominal size derived from natural sources)
4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns
50.13.1:9 mm cement plastering of mix : 1:3 (1 cement : 3 fine sand ) including all cost of materials, labour charges etc complete
2.25:Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m.
50.2.25.1:Filling with contractor's own earth ( excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m as per direction of site Engineer-in-charge
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
finance_1406113.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.05 MB
BOQ_1406113.xls
BOQ • 0.30 MB
viewsbd.pdf
Tender Documents • 1.73 MB
Requisition.pdf
Other Document • 0.00 MB
Pr.pdf
Other Document • 0.16 MB
Affidavit.pdf
Other Document • 0.01 MB
IntegrityPact.pdf
Additional Documents • 0.08 MB
Letter.pdf
Additional Documents • 0.01 MB
Download all tender documents and submit your bid