Tender Value
₹4.8 Cr
EMD Value
₹1 L
Closing Date
22 Mar 2021, 4:00 pmClosed
Superintending Engineer
Superintending EngineerPH Circle Muvattupuzha
construction of electrical control rooms supply erection and commissioning of 400 KVA AND 500 KVA transformers and allied works and pump sets
2021_KWA_412231_1
Re-50/2020-21/SE/PHC/MVPA
Open Tender
Civil Works - Water Works
Item Rate
270 days
Kattappana and Ayyappancovil Panchayath
as per NIT
6 documents required · 6 mandatory
₹8,400
₹1 L
20 Apr 2021
5 Feb 2021
24 Mar 2021
5 Feb 2021
22 Mar 2021
5 Feb 2021
5 Feb 2021 - 11 Feb 2021
Amount
Civil Works
Design and Construction of Electrical Control room, foot bridge and waste water drain at Raw water pumping station Thonithady and Design and Construction of Electrical Control room,concrete road and retaining wall at Water Treatment Plant Alady
Electromechanical works
Supply, erection, testing and commissioning of 400 KVA Transformer and allied works at Alady plant compound and f 500 KVATransformer and allied works at Thonithady raw water pump housecompound- (1)- 11 KVsubstation and HT equipments(2)- LT / MVPANELS & ACCESSORIES(3)-DISTRIBUTION BOARDS, SWITCHGEAR & ACCESSORIES- (4)- CABLES ,WIRES & ACCESSORIES- (5)- EARTHING &ACCESSORIE-(6) SUBSTATIONEQUIPMENTS & MISCELENEOUS-(7) - SCHEME APPROVAL & POWER ALLOCATION.Preparing the as laid drawings of cables, electromechanical accessories etc laid as part of the contract, Maintaining the components supplied, installed and constructed as part of this contract during the maintenance period of 12months within a guarantee period of 24 months from the date of commissioning of the scheme in a satisfactory manner acceptable to the Executive Engineer, in accordance with NIT Vol.II
Supply, erection, testing and commissioning of motor pump set
Supply, Erection, Testing and Commissioning of (1) 2 Nos new VT motor Pumpset (working voltage 3300V) having discharge of 80 lps against a total head of 180 M. suction head 20.30m at Thonithady rawwater pump house,(2)2 Nos C/F pump set -Discharge of 3.50 lps, head - 173 M at Nariyanpara pump house,(3)2 Nos C/F pump sets - discharge -22 lps, head - 113 M at Nariyanpara pump house ,(4)2 Nos C/F pump sets,discharge-11 lps, head - 19 M at Kalthotty pump house (5)2 Nos C/F pump sets, discharge - 11 lps, head -184 M at Kalthotty pump house (6)2 Nos C/F Pump set , discharge - 5 lps , head of 81 M. suction head 5m at WTP sump (7),2 Nos new C/F pump set,discharge - 65 lps , head -125 M. suction head 5m speed 1450 rpm at WTP sump, Extension of three phase line to Kalthotti and Nariyanpara pumping station, Preparing the as laid drawings of cables, electromechanical accessories etc laid as part of the contract, Maintaining the components supplied, installed and constructed as part of this contract during the maintenance period of 12months within a guarantee period of 24 months from the date of commissioning of the scheme in a satisfactory manner acceptable to the Executive Engineer, in accordance with NIT Vol.II
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
finance_585729.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .