Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.9 LAccepted-Finance | ₹3.9 L | L1 | Accepted-Finance Lowest |
| 2 | L2₹3.9 L+₹2,940 (0.75%)Rejected-Finance NOT SPECIFIED | ₹3.9 L+₹2,940 (0.75%) | L2 | Rejected-Finance Other than lowest |
| 3 | L3₹4.0 L+₹12,660 (3.25%)Rejected-Finance | ₹4.0 L+₹12,660 (3.25%) | L3 | Rejected-Finance Other than Lowest |
| Sl No | Description | Qty | Unit | Chandan Parkash L3 | Jitender Kumar L2 | Devansh L1 |
|---|---|---|---|---|---|---|
| 1.00 | Hiring of Hydraulic Excavator cum loader for cutting in earth work, removal of slips, cleaning of drains and catch pit /dressing of berm in all kinds of soil and trimming of side slopes and disposing of earth upto any lead from various sites of work with in all leads and lifts and to entir satisfaction of Engineer in Charge. Any loss to the public / private property or any accident etcetera happened during the course of hiring period shall be absolute responsibility of the contractor. The repair and spares including watch and ward of machines shall also be borne by the contractor /owner. The daily log book will be maintained at site which should be duly verified by the Engineer - in - Charge. | 150 | Hour | 1,400 ₹2,10,000 | 1,380 ₹2,07,000 | 1,370 ₹2,05,500 Lowest |
| 2.00 | Hiring of Tipper 5.50 cum /10 tonne capacity (five point five cubic metre / ten tonne capacity) for carriage of earth /debries, boulder and other construction materials from various location etc. complete including wages of tipper driver, cleaner and P.O.L. any repair / damage during work will be absolute responsibility of the contractor/owner Tipper has to work whole day Only actual working hour will be accounted for the payment. No payment will be made for sunday and holidays as well as certain day if ther is no work to the entire satisfaction of the Engineer-in-Charge. | 15 | Days | 4,000 ₹60,000 | 3,830 ₹57,450 | 3,800 ₹57,000 Lowest |
| 3.00 | Carriage of steel including loading, unloading and stacking within the site for lead up to 50 metres or part thereof as directed by the Engineer-in-Charge. | 150 | Cum | 400 ₹60,000 | 383 ₹57,450 | 380 ₹57,000 Lowest |
| 4.00 | Removal / Clearance of all kinds of silt from buildings upto all depths in all kind of classification of soil such as pick work, jumper work, saturated soil with in all leads and lifts and as per the direction and entire satisfaction of the Engineer-in-Charge. | 108 | Cum | 670 ₹72,360 | 655 ₹70,740 | 650 ₹70,200 Lowest |
Tender Value
₹3.1 L
EMD Value
₹6,650
Closing Date
30 Jun 2026, 5:00 pmClosed
Executive Engineer
EE JSV Mandi
Removal of Silt and carriage/stacking of steel material within the permises of Divisional Store Raghunath Ka Padhar
2026_HPIPH_137099_1
8121-8220
Open Tender
Miscellaneous Works
Item Rate
90 days
Mandi
Please refer Tender documents.
6 documents required · 6 mandatory
₹350
₹6,650
14 Jul 2026
20 Jun 2026
1 Jul 2026
20 Jun 2026
30 Jun 2026
20 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Hiring of Hydraulic Excavator cum loader for cutting in earth work, removal of slips, cleaning of drains and catch pit /dressing of berm in all kinds of soil and trimming of side slopes and disposing of earth upto any lead from various sites of work with in all leads and lifts and to entir satisfaction of Engineer in Charge. Any loss to the public / private property or any accident etcetera happened during the course of hiring period shall be absolute responsibility of the contractor. The repair and spares including watch and ward of machines shall also be borne by the contractor /owner. The daily log book will be maintained at site which should be duly verified by the Engineer - in - Charge. | 150 | Hour | - | - |
| 2 | Hiring of Tipper 5.50 cum /10 tonne capacity (five point five cubic metre / ten tonne capacity) for carriage of earth /debries, boulder and other construction materials from various location etc. complete including wages of tipper driver, cleaner and P.O.L. any repair / damage during work will be absolute responsibility of the contractor/owner Tipper has to work whole day Only actual working hour will be accounted for the payment. No payment will be made for sunday and holidays as well as certain day if ther is no work to the entire satisfaction of the Engineer-in-Charge. | 15 | Days | - | - |
| 3 | Carriage of steel including loading, unloading and stacking within the site for lead up to 50 metres or part thereof as directed by the Engineer-in-Charge. | 150 | Cum | - | - |
| 4 | Removal / Clearance of all kinds of silt from buildings upto all depths in all kind of classification of soil such as pick work, jumper work, saturated soil with in all leads and lifts and as per the direction and entire satisfaction of the Engineer-in-Charge. | 108 | Cum | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.58 MB
Form6.pdf
Tender Documents • 0.67 MB
Form8.pdf
Tender Documents • 1.04 MB
BOQ_202916.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .