Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.7 LAccepted-AOC | ₹5.7 L | L1 | Accepted-AOC lowest |
| 2 | L2₹6.0 LRejected-AOC | ₹6.0 L | L2 | Rejected-AOC sec lowest |
| Sl No | Description | Qty | Unit | Ramakrishnan k L2 | Jassir M L1 |
|---|---|---|---|---|---|
| 1.00building | |||||
| 1.00 | 15.3:Demolishing R.C.C. work manually / by mechanical means including stacking of steel bars and disposal of unserviceable material with in 50 metres lead as per direction of Engineer -in-Charge. | 0.28 | cum | 3,082.6 ₹853.88 | 2,951.1 ₹817.45 |
| 1.00 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 0.53 | cum | 302 ₹159.46 | 289.2 ₹152.70 |
| 1.00 | 4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 0.39 | cum | 7,753.8 ₹3,039.49 | 7,423.01 ₹2,909.82 |
| 1.00 | 50.6.7.2:Laterate masonry with neatly dressed laterate stone of size 40x20x15cm or nearest size in cement mortar 1:6 for super structure above plinth level up to floor two level including all cost of materials, labour charges etc. | 13.12 | cum | 7,586 ₹99,528.32 | 7,262 ₹95,277.44 |
| 1.00 | 5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers | 9.4 | sqm | 640.5 ₹6,023.90 | 613.5 ₹5,769.97 |
| 1.01 | 5.9.3:Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform | 6.02 | sqm | 807 ₹4,857.33 | 772.6 ₹4,650.28 |
| 1.01 | 5.3:Reinforced cement concrete work in beams, suspended floors, roofs, having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases up to floor five level excluding the cost of centering, shuttering, finishing and reinforcement, with1:1.5:3 (1 cement : 1.5 coarse sand (Zone III) derived from natural sources: 3 graded stone aggregate 20 mm nominal size derived from natural sources). | 1.21 | cum | 11,285 ₹13,654.85 | 1,083.5 ₹1,311.04 |
| 1.01 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 108.9 | kilogram | 94.4 ₹10,280.16 | 90.4 ₹9,844.56 |
| 1.01 | 5.47.2:Providing and fixing in position factory made precast RCC M-40 doors and win frames having excellent smooth finish as per IS:6523 with reinforcement of 3 Nos, 6 mm dia main bars tied with 3 mm M.S stirrups placed @ 200 mm CC nad 6 numbers high strength polymer blocks of required size for fixing hinges including providing 6 no specially designed M.S galvanised sleeves for accomodating 6 mm dia fully threaded bolts for fixing hold fast on vertical members, providing suitable arrangement for receiving sliding door bolts and tower bolt etc all complete, as per the direction of Engineer in charge. (The cost of hold fast and cc block of 1:3:6 mix is also included in the item.) The frame shall be measured in running meter correct to two places of decimal.Door frame 100 mm x 60 mm. | 46.5 | metre | 711.6 ₹33,089.40 | 681.2 ₹31,675.80 |
Tender Value
₹6.6 L
EMD Value
₹16,498
Closing Date
20 Sept 2025, 10:00 amClosed
ALEN BOBAN
Office of the Assistant Engineer, LIDEW Subdivision ,Kondotty
Annual Plan-2025-26-Kondotty BP -Construction of women empower centre for Monniyoorkunnu anganavadi building -Pulikkal GP-37/26-General Civil Work
2025_LSGD_796313_3
02/2025-26AE/LIDEW/KTY
Open Tender
Civil Works - Buildings
180 days
LID EW Subdivision, Kondotty B.P
Please refer Tender documents.
7 documents required · 7 mandatory
₹1,455
Yes
₹16,498
Yes
17 Feb 2026
12 Sept 2025
22 Sept 2025
12 Sept 2025
20 Sept 2025
12 Sept 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid