Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹98.1 LAdmitted-Finance | -23.77% | ₹98.1 L | L1 | Admitted-Finance |
| 2 | L2₹1.0 Cr+₹6.0 L (6.13%)Admitted-Finance | -19.10% | ₹1.0 Cr+₹6.0 L (6.13%) | L2 | Admitted-Finance |
| 3 | L3₹1.1 Cr+₹14.2 L (14.5%)Admitted-Finance | -12.75% | ₹1.1 Cr+₹14.2 L (14.5%) | L3 | Admitted-Finance |
| 4 | L4₹1.1 Cr+₹14.5 L (14.8%)Admitted-Finance | -12.50% | ₹1.1 Cr+₹14.5 L (14.8%) | L4 | Admitted-Finance |
| 5 | L5₹1.2 Cr+₹24.0 L (24.5%)Admitted-Finance | -5.11% | ₹1.2 Cr+₹24.0 L (24.5%) | L5 | Admitted-Finance |
Tender Value
₹1.3 Cr
EMD Value
₹2.6 L
Closing Date
12 Jun 2026, 4:00 pmClosed
Executive Engineer PHE Division Baramulla
Executive Engineer PHE Division Baramulla
WSS Augmentation Pattan Town under UT Capex
2026_PHE_311385_1
ENIT 02 of 06/2026
Open Tender
Civil Works
Percentage
60 days
PHE Division Baramulla
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
Executive Engineer PHE Division Baramulla
₹2.6 L
17 Jun 2026
2 Jun 2026
13 Jun 2026
2 Jun 2026
12 Jun 2026
2 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed.All kinds of soil | |||||
| 2 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres:.: All kinds of soil : | 1 | cum | - | - |
| 3Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m. | |||||
| 4Providing and fixing G.I. pipes complete with G.I. fittings excluding trenching and refilling etc. (external work) (Light) | |||||
| 4.1 | 80mmdia.nominal bore | - | mtr | - | - |
| 4.2 | 65mmdia nominal bore | - | mtr | - | - |
| 4.3 | 50mm dia nominal bore | - | mtr | 1 | - |
| 4.4 | 40mm dia nominal bore | - | mtr | 1 | - |
| 4.5 | 25mm dia nominal bore | - | mtr | 1 | - |
| 4.6 | 20mm dia nominal bore | - | mtr | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.60 MB
BOQ_1008290.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .