Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.4 LAdmitted-Finance MANDI DIVISION NO II HP PWD MANDI | MANDI | HIMACHAL PRADESH | 175001 | ₹9.4 L | L1 | Admitted-Finance |
| 2 | L2₹9.9 L+₹45,332.09 (4.80%)Admitted-Finance HIMACHAL PRADESH HP | KANGRA | HIMACHAL PRADESH | 176204 | ₹9.9 L+₹45,332.09 (4.80%) | L2 | Admitted-Finance |
| 3 | L3₹10.5 L+₹1.1 L (11.6%)Admitted-Finance GROUND FLOOR THAKUR COMPLEX BASANTPUR | BASANTPUR | SHIMLA | HIMACHAL PRADESH | 171018 | ₹10.5 L+₹1.1 L (11.6%) | L3 | Admitted-Finance |
| 4 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Others-Tender Form not submitted physically, Earnest money not submitted physically |
| Sl No | Description | Qty | Unit | RAKESH KUMAR L3 | DESH RAJ L1 | Lekh Raj L2 |
|---|---|---|---|---|---|---|
| 1.00 | Excavation work by mechanical means (Hydraulic excavator)/ manual means in foundation, trenches, drains (Any width or square metre on plan), including dressing of sides and ramming of bottoms, lift upto any height, including getting out the excavated soil and disposal of surplus excavated soil as directed in all kinds of classification, of soils such as pick work, jumper work, blasting work saturated soils including chiseling or any other mixed variety of soils, dewatering and / or removal of slush and other incidentals within all leads and lifts complete in all respect as per direction and satisfaction of Engineer-in-Charge. Any loss to the public or private property during the course of excavation shall be the sole responsibility of the contractor which shall have to be duly compensated by him at his own cost in all cases. | 30.76 | cum | 270 ₹8,305.2 | 170 ₹5,229.2 | 165 ₹5,075.4 Lowest |
| 2.00 | Providing and laying, mechanically mixed and vibrated cement concrete 1:5:10 (one cement : Five sand : Ten graded crushed stone aggregate 40 mm (forty millimeter) nominal size) including curing complete excluding the cost of form work in foundation and plinth including carriage of material within all leads lifts and other incidentals complete in all respect as per direction and to the entire satisfaction of Engineer-in-Charge. | 9.1 | cum | 4,900 ₹44,590 | 4,400 ₹40,040 Lowest | 4,500 ₹40,950 |
| 3.00 | Random rubble masonry with hard stone of approved quailty in foundation and plinth including levelling up with cement concrete 1:6:12 (one cement : six coarse sand : twelve graded stone aggregate 20 mm nominal size) upto plinth level with Cement mortar 1:6 (1 cement : 6 coarse sand) including curing complete and carriage of materials with in all leads, lifts and other incidentals. | 11.83 | cum | 5,500 ₹65,065 | 4,500 ₹53,235 | 4,450 ₹52,643.5 Lowest |
| 4.00Providing form work with steel plates 3.15 mm ( three point fifteen millimetre ) thick welded with angle iron in frame 30x30x5 mm (Thirty millimetre x Thirty millimetre x five millimetre) so as to give a fair finish including centering, shuttering, strutting and propping etc. with wooden battens and ballies in any height of propping and centering below supporting floor to ceiling upto floor all level and removal of the same for in-situ reinforced concrete and plain concrete work including carriage of materials with in all leads, lifts and other incidentals. | ||||||
| 4.01 | Foundations, footings, bases of columns, etc. for mass concrete | 12.16 | sqm | 217 ₹2,638.72 | 200 ₹2,432 Lowest | 200 ₹2,432 Lowest |
| 4.02 | Columns, pillars, posts and struts square, rectangular or polygonal in plan as required. | 19.08 | sqm | 520 ₹9,921.6 | 480 ₹9,158.4 | 400 ₹7,632 Lowest |
| 4.03 | Lintels, beams, plinth beams, girders, bressumers and cantilevers. | 42.73 | sqm | 390 ₹16,664.7 | 350 ₹14,955.5 | 320 ₹13,673.6 Lowest |
| 5.00 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) mechanically mixed, vibrated and curing complete as required including carriage of materials with in all leads, lifts and other incidentals. | 9.34 | cum | 7,000 ₹65,380 | 6,200 ₹57,908 Lowest | 6,200 ₹57,908 Lowest |
| 6.00 | Reinforced cement concrete work in walls any thickness including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor all level excluding the cost of centering, shuttering, finishing and reinforcement in secified grade of reinforced cement concrete 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) mechanically mixed, vibrated and curing complete as required including carriage of materials with in all leads, lifts and other incidentals. | 1.62 | cum | 7,800 ₹12,636 | 7,400 ₹11,988 | 7,000 ₹11,340 Lowest |
| 7.00 | Reinforced cement concrete work in Beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor all levels excluding the cost of centering, shuttering, finishing and reinforcement, with 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) mechanically mixed, vibrated and curing complete including carriage of materials with in all leads, lifts and other incidentals. | 5.16 | cum | 8,000 ₹41,280 | 7,400 ₹38,184 | 7,000 ₹36,120 Lowest |
Tender Value
₹10.0 L
EMD Value
₹20,000
Closing Date
17 Jul 2026, 5:00 pmClosed
XEN RDD MANDI
XEN OFFICE 2ND FLOOR IN NEW BDO BUILDING AT BHIULI DISTT MANDI HP
Construction of Shed for RLC Sadyana Development Block Sadar Mandi District Mandi HP
2026_DRDPR_138652_1
832-837
Open Tender
Civil Works - Buildings
Item Rate
180 days
Sadhyana Mandi
Please refer Tender documents.
7 documents required · 7 mandatory
₹500
XEN RDD
₹20,000
26 Jul 2026
9 Jul 2026
18 Jul 2026
9 Jul 2026
17 Jul 2026
9 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation work by mechanical means (Hydraulic excavator)/ manual means in foundation, trenches, drains (Any width or square metre on plan), including dressing of sides and ramming of bottoms, lift upto any height, including getting out the excavated soil and disposal of surplus excavated soil as directed in all kinds of classification, of soils such as pick work, jumper work, blasting work saturated soils including chiseling or any other mixed variety of soils, dewatering and / or removal of slush and other incidentals within all leads and lifts complete in all respect as per direction and satisfaction of Engineer-in-Charge. Any loss to the public or private property during the course of excavation shall be the sole responsibility of the contractor which shall have to be duly compensated by him at his own cost in all cases. | 30.76 | cum | - | - |
| 2 | Providing and laying, mechanically mixed and vibrated cement concrete 1:5:10 (one cement : Five sand : Ten graded crushed stone aggregate 40 mm (forty millimeter) nominal size) including curing complete excluding the cost of form work in foundation and plinth including carriage of material within all leads lifts and other incidentals complete in all respect as per direction and to the entire satisfaction of Engineer-in-Charge. | 9.1 | cum | - | - |
| 3 | Random rubble masonry with hard stone of approved quailty in foundation and plinth including levelling up with cement concrete 1:6:12 (one cement : six coarse sand : twelve graded stone aggregate 20 mm nominal size) upto plinth level with Cement mortar 1:6 (1 cement : 6 coarse sand) including curing complete and carriage of materials with in all leads, lifts and other incidentals. | 11.83 | cum | - | - |
| 4Providing form work with steel plates 3.15 mm ( three point fifteen millimetre ) thick welded with angle iron in frame 30x30x5 mm (Thirty millimetre x Thirty millimetre x five millimetre) so as to give a fair finish including centering, shuttering, strutting and propping etc. with wooden battens and ballies in any height of propping and centering below supporting floor to ceiling upto floor all level and removal of the same for in-situ reinforced concrete and plain concrete work including carriage of materials with in all leads, lifts and other incidentals. | |||||
| 4.01 | Foundations, footings, bases of columns, etc. for mass concrete | 12.16 | sqm | - | - |
| 4.02 | Columns, pillars, posts and struts square, rectangular or polygonal in plan as required. | 19.08 | sqm | - | - |
| 4.03 | Lintels, beams, plinth beams, girders, bressumers and cantilevers. | 42.73 | sqm | - | - |
| 5 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) mechanically mixed, vibrated and curing complete as required including carriage of materials with in all leads, lifts and other incidentals. | 9.34 | cum | - | - |
| 6 | Reinforced cement concrete work in walls any thickness including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor all level excluding the cost of centering, shuttering, finishing and reinforcement in secified grade of reinforced cement concrete 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) mechanically mixed, vibrated and curing complete as required including carriage of materials with in all leads, lifts and other incidentals. | 1.62 | cum | - | - |
| 7 | Reinforced cement concrete work in Beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor all levels excluding the cost of centering, shuttering, finishing and reinforcement, with 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) mechanically mixed, vibrated and curing complete including carriage of materials with in all leads, lifts and other incidentals. | 5.16 | cum | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.67 MB
SBDRLCSadyana.pdf
Tender Documents • 4.63 MB
BOQ_205380.xls
BOQ • 0.36 MB
termsandconditions10feb2026.pdf
Additional Documents • 3.95 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .