Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.0 CrAccepted-AOC VILL UPPER NATHANPUR PO NEHRUGRAM NR AMBIWALA GURUDWARA DEHRADUN | DEHRADUN | UTTARAKHAND | 248001 | ₹1.0 Cr | L1 | Accepted-AOC ok |
| 2 | L2₹1.1 Cr+₹4.1 L (4.03%)Rejected-Finance POLICE LINE ROAD KUMOUR PITHORAGARH | ₹1.1 Cr+₹4.1 L (4.03%) | L2 | Rejected-Finance not qualified |
| 3 | L3₹1.1 Cr+₹8.6 L (8.52%)Rejected-Finance 2 FRIENDS ENCLAVE SHAH NAGAR DEHRADUN | ₹1.1 Cr+₹8.6 L (8.52%) | L3 | Rejected-Finance not qualified |
Tender Value
₹89.7 L
EMD Value
₹1.4 L
Closing Date
25 Feb 2020, 5:00 pmClosed
SE
EDC SRINAGAR GARHWAL
Conversion of LT overhead line by XLPE AB cable in different villages of Kot Pauri Block under EDD Srinagar
2020_UPCL4_22768_1
56/EDCS/2019-20
Open Tender
Electrical Works
Turn-key
90 days
WORK
Conversion of LT overhead line by XLPE AB cable in different villages of Kot Pauri Block under EDD Srinagar
3 documents required · 3 mandatory
₹5,900
Yes
SE EDC SRINAGAR GARHWAL
₹1.4 L
Yes
22 Sept 2023
18 Feb 2020
26 Feb 2020
18 Feb 2020
25 Feb 2020
19 Feb 2020
Electrical Items :
LT XLPE AB cable 3C×25+25mm2
LT PVC Cable 2×6 mm2
ST pole SP-21 ( Hot Galvanized)
Stay rod 16×1800 mm2
Stay wire 7/10 SWG
Decentralized Item
Dead end claps with eye hook ( Insulate) SP-21 with clamp & N&B
Suspension clamps with Eye hook ( insulated) with clamp & N&B
LT insulation piercing connectiors 25 mm
Mid span jointing sleeves
LT distribution box on LT pole with clamp and N&B
Stay clamp for SP-21 with nut and bolt
Safe carriage of following stock material from Srinagar store site of work approx distance upto 30 Km
ST pole SP-21
Small line material
Head load cartage of following material from road site to work site Avg. Distance upt- 0-01 Km.
ST pole SP-21
Small line material
Dismentling of existing 1 phase 2 wire LT line
Dismentling of existing 3 phase 4 wire LT line
Digging of pit size 0.9×0.6×1/6 of full length of pole for pole in all type of soil.
Errection of LT pole SP-21 including fitting of all accessories
Muffing of pole size 0.45×0.6 cm with CC 1:3:6 block size 45 cm height from ground level including cost of cement stone and sand et.
Digging of pit size 0.6×0.6×1.2 mtr. In all type of soil of full length of pole for pole in all type of soil
Errection of LT stay rod along with all accessories
Re- nozelling and tightening of old stay set.
Laying and sagging of LT XLPE AB cable along wih fitting of all accessories such as clamp, jointing sleeve etc.
Fixing of LT distribution box along with connection, petty item such as clamp, nut and bolt will be provided by contractor
Restrainghtening of tilted ST pole SP-21 after opening both side LT span
Disconnection of LT service cable and reconnection it through distribution box after commissioning of ABC line
Route clerance of LT line by looping chooping of tree branch along LT line
Back H/L cartage of following material from work site to road side ( Avg. Dist. 0-1 km.)
Conductotor scrap
Safe back cartage of following material from road side to store center Srinagar
Conductotor scrap
Saun Engineering and Construction Co P Ltd
UTTARANCHAL FORGINGS INDUSTRY
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .