| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹1.4 LAccepted-Finance | ₹1.4 L | L-1 | Accepted-Finance Lowest-1 |
| 2 | L-2₹1.4 L+₹5,333.68 (3.95%)Rejected-Finance | ₹1.4 L+₹5,333.68 (3.95%) | L-2 | Rejected-Finance Lowest-2 |
| 3 | L-3₹1.4 L+₹9,494.36 (7.03%)Rejected-Finance NOT AVAILABLE | ₹1.4 L+₹9,494.36 (7.03%) | L-3 | Rejected-Finance Lowest-3 |
| Sl No | Description | Qty | Unit | RAMESH KUMAR L3 | Lekh Ram L1 | KIRAN L2 |
|---|---|---|---|---|---|---|
| 1.00 | Excavation in foundation and trenches etc. in earth work in all kind of soils such as pick work jumper work, saturated soil including blasting soft/hard rock, chiseling soft/hard rock where blasting is prohibited in all lifts including trimming and dressing of sides, levelling of bed, stacking the excavated soil clear from the edge of excavation and then returning the excavated soil in 15cm. layers when required into plinths, side of foundations etc including consolidating each deposited layer by ramming, watering and then disposing of all surplus excavated soil as directed in all leads/lifts and shoring strutting, timbering where ever required as per direction & best satisfaction of the Engineer-in-Charge. | 73.58 | Cum | 455 ₹33,478.9 | 425 ₹31,271.5 Lowest | 450 ₹33,111 |
| 2.00 | Providing and laying cement concrete 1:4:8 (1 cement:4 sand: 8 graded stone aggregate 40mm nominal size) and curing complete excluding cost of form work in foundation and plinth complete in all respect with in all leads and lifts as per direction of the Engineer-in-Charge. | 0.27 | Cum | 6,950 ₹1,876.5 | 6,700 ₹1,809 Lowest | 6,900 ₹1,863 |
| 3.00Providing form work with steel plates 3.15mm thick welded with angle iron 30x30x5mm so as to give a fair finish including centring, shuttering, strutting and propping etc. with wooden batten and ballies, height of propping and centering below supporting floor to ceiling not exceeding 4 metres and removal of the same for insitu reinforced concrete & plain conrete work in. | ||||||
| 3.01 | Vertical surfaces such as walls (any thickness) partition and the like including attached pillasters, buttresses, plinth and string courses and the like complete job in all respect with in all leads and lifts as per direction of the Engineer-in-Charge. | 14.22 | Sqm | 385 ₹5,474.7 | 375 ₹5,332.5 Lowest | 380 ₹5,403.6 |
| 4.00Providing and laying cement concrete work 1:2:4 (1 cement: 2 sand : 4 graded stone aggregate 20mm nominal size) and curing complete excluding cost of form work and reinforcement for reinforced concrete work in: | ||||||
| 4.01 | In foundation and plinth including carriage of material with in all leads and lifts as per the direction and satisfaction of Engineer-in-Charge. | 0.27 | Cum | 8,800 ₹2,376 | 8,100 ₹2,187 Lowest | 8,700 ₹2,349 |
| 4.02 | Walls (any thickness but not less than 0.10 m thickness) including attached butteresses, pillaster plinth and string courses etc. from top of foundation level upto floor two level with in all leads and lifts as per the direction and satisfaction of Engineer-in-Charge. | 0.93 | Cum | 8,800 ₹8,184 | 8,100 ₹7,533 Lowest | 8,700 ₹8,091 |
| 5.00 | Providing Mild steel/Tor steel reinforcement for RCC work including bending, binding and placing in position complete up to floor two level with in all leads and lifts as per the direction and satisfaction of Engineer-in-Charge. | 48.18 | Kg. | 97 ₹4,673.46 | 90 ₹4,336.2 Lowest | 96 ₹4,625.28 |
| 6.00Providing, laying .jointing and carriage of precast concrete plain end pipe of NP2 with re-inforcement duly ISI marked as per 458-2003 precast concrete pipes with and without re- inforcement 3rd revision amendment No3 and with latest amendment if any in following dia meter | ||||||
| 6.01 | 250mm dia | 118 | Rmt | 750 ₹88,500 | 700 ₹82,600 Lowest | 720 ₹84,960 |
Tender Value
₹1.5 L
EMD Value
₹3,100
Closing Date
6 May 2026, 10:00 amClosed
EE
Executive Engineer JS Division Baggi Distt. Mandi H.P.
as per BOQ
2026_HPIPH_135203_1
EE-JSD-BGI/2026- 2274-2324 dt. 25/04/2026
Open Tender
Civil Works
Item Rate
90 days
Baggi
as per NIT
6 documents required · 6 mandatory
₹350
₹3,100
18 Jul 2026
28 Apr 2026
6 May 2026
28 Apr 2026
6 May 2026
28 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation in foundation and trenches etc. in earth work in all kind of soils such as pick work jumper work, saturated soil including blasting soft/hard rock, chiseling soft/hard rock where blasting is prohibited in all lifts including trimming and dressing of sides, levelling of bed, stacking the excavated soil clear from the edge of excavation and then returning the excavated soil in 15cm. layers when required into plinths, side of foundations etc including consolidating each deposited layer by ramming, watering and then disposing of all surplus excavated soil as directed in all leads/lifts and shoring strutting, timbering where ever required as per direction & best satisfaction of the Engineer-in-Charge. | 73.58 | Cum | - | - |
| 2 | Providing and laying cement concrete 1:4:8 (1 cement:4 sand: 8 graded stone aggregate 40mm nominal size) and curing complete excluding cost of form work in foundation and plinth complete in all respect with in all leads and lifts as per direction of the Engineer-in-Charge. | 0.27 | Cum | - | - |
| 3Providing form work with steel plates 3.15mm thick welded with angle iron 30x30x5mm so as to give a fair finish including centring, shuttering, strutting and propping etc. with wooden batten and ballies, height of propping and centering below supporting floor to ceiling not exceeding 4 metres and removal of the same for insitu reinforced concrete & plain conrete work in. | |||||
| 3.01 | Vertical surfaces such as walls (any thickness) partition and the like including attached pillasters, buttresses, plinth and string courses and the like complete job in all respect with in all leads and lifts as per direction of the Engineer-in-Charge. | 14.22 | Sqm | - | - |
| 4Providing and laying cement concrete work 1:2:4 (1 cement: 2 sand : 4 graded stone aggregate 20mm nominal size) and curing complete excluding cost of form work and reinforcement for reinforced concrete work in: | |||||
| 4.01 | In foundation and plinth including carriage of material with in all leads and lifts as per the direction and satisfaction of Engineer-in-Charge. | 0.27 | Cum | - | - |
| 4.02 | Walls (any thickness but not less than 0.10 m thickness) including attached butteresses, pillaster plinth and string courses etc. from top of foundation level upto floor two level with in all leads and lifts as per the direction and satisfaction of Engineer-in-Charge. | 0.93 | Cum | - | - |
| 5 | Providing Mild steel/Tor steel reinforcement for RCC work including bending, binding and placing in position complete up to floor two level with in all leads and lifts as per the direction and satisfaction of Engineer-in-Charge. | 48.18 | Kg. | - | - |
| 6Providing, laying .jointing and carriage of precast concrete plain end pipe of NP2 with re-inforcement duly ISI marked as per 458-2003 precast concrete pipes with and without re- inforcement 3rd revision amendment No3 and with latest amendment if any in following dia meter | |||||
| 6.01 | 250mm dia | 118 | Rmt | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.47 MB
BOQ_200247.xls
BOQ • 2.98 MB
FORM6_23.pdf
Tender Documents • 0.45 MB
TC.pdf
Tender Documents • 0.14 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .