Tender Value
₹10.2 Cr
EMD Value
₹5 L
Closing Date
5 Nov 2022, 3:00 pmClosed
SUPERINTENDING ENGINEER
PH CIRCLE, KWA, MALAPPURAM
KIIFB - WRD-10-05-Special Investment Package - WSS to Tanur Municipality and adjoining GPs in Malappuram District - PHASE - I - PACKAGE - V - Construction of 56 LL Capacity OHSR at Kunnumpuram in Tanur Municipality
2022_KWA_518817_1
SE/PHC/MPM/59/2022-23
Open Tender
Civil Works - Water Works
Percentage
455 days
Tanur
Refer tender documents
8 documents required · 8 mandatory
₹16,540
₹5 L
PH CIRCLE, KWA, MALAPPURAM
30 Dec 2022
21 Oct 2022
8 Nov 2022
21 Oct 2022
5 Nov 2022
26 Oct 2022
21 Oct 2022 - 25 Oct 2022
25 Oct 2022
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1APPENDIX - A - Construction of GLSR/OHSR -Working Charges | |||||
| 1.001 | Clearing grass and removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared. | 1,214.1 | sqm | 7.57 | ₹9,190.74 |
| 1.002 | Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil | 1,941 | cum | 215.37 | ₹4,18,032.95 |
| 1.003 | Excavation work by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soils as directed, within a lead of 50 m.Ordinary rock | 855.51 | cum | 530.82 | ₹4,54,121.82 |
| 1.004 | Providing steel sheet shoring to the sides of the trenches to depths of above 4.00 m but not exceeding 6.00m using 6 mm M.S. sheet 0.50 M wide stiffen on edges with 50 mm x 50mm x 6 mm M.S. angles driving down vertically on either side one after another in lines and levels with suitable pile driving equipments and accessories to a maximum depth of 0.50 M below the bottom of the proposed excavation 0.5 M above ground level suitably braced by horizontal walling pieces at 75 x 150 mm x 8 mm angles on either side at intervals not exceeding 1.50M and horizontal screw jack type struts at 1.50M intervals and maintaining the shoring till the pipes are laid and works are completed, dismantling, cleaning and restacking for reuse including all labour, hire charges and conveyance for equipments, tools and plants and sundries etc. complete. | 154 | sqm | 753.83 | ₹1,16,089.82 |
| 1.005 | Carriage of excess earth to to the embankment location within all lifts and lead upto 5KM including loading unloading and transportation as required. Contractor shall obtain the necessary pass for the transportation from the concerned authorities, The Authority will provide all documentary assistance for obtaining the licences and statutory payment of fees as applicable | 1,900 | cum | 220.62 | ₹4,19,178 |
| 1.006 | Providing, driving and installing driven cast-in-situ reinforced cement concrete piles of grade M-25 of specified diameter and length below the pile cap, to carry safe working load not less than specified, excluding the cost of steel reinforcement but including the cost of shoe and the length of pile to be embedded in the pile cap etc. all complete. (Length of pile for payment shall be measured from top of shoe to the bottom of pile cap): 700 mm dia piles Data based on item No 20.1.5 | 1,760 | metre | 6,533.01 | ₹1,14,98,097.6 |
| 1.007 | Vertical load testing of piles in accordance with IS 2911( Part IV) including installation of loading platform and preparation of pile head or construction of test cap and dismantling of test cap after test etc. complete as per specification & the direction of engineer -in-Charge.Single pile above 50 tonne and upto 100 tonne capacityInitial test | 11 | per test | 71,313.78 | ₹7,84,451.58 |
| 1.008 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m.Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m. | 861.87 | cum | 260.19 | ₹2,24,250.74 |
| 1.009 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | 88.23 | cum | 8,040.95 | ₹7,09,436.94 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
MERGEDNIT11111111.pdf
Tender Notice • 7.84 MB
BOQ_744873.xls
BOQ Document • 0.57 MB
107453084.pdf
Tender Document • 0.69 MB
SCOPE1111111111.pdf
Tender Document • 0.42 MB
q1toq8new.pdf
Tender Document • 0.26 MB
107453086.html
Tender Document • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .