Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹20.9 LAdmitted-Fee/PreQual/Technical/Finance | -14.99% | ₹20.9 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹24.6 L
EMD Value
₹24,600
Closing Date
17 Sept 2026, 5:00 pmClosed
ADDITIONAL CHIEF ENGINEER PH DIVISION ANGUL
ANGUL PH DIVISION ANGUL PH No 06764296431
Construction of water Kiosk at Bhuban NAC under State Plan 2025-26
2026_PHEO_140260_1
11 OF 2026-27
Open Tender
Civil Works - Water Works
Percentage
90 days
DHENKANAL
Please refer Tender documents.
2 documents required · 2 mandatory
₹6,000
₹24,600
Yes
18 Sept 2026
9 Sept 2026
18 Sept 2026
9 Sept 2026
17 Sept 2026
9 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Construction of pump house and other ancillary works. | |||||
| 1.01 | Supplying all labour and T&P for earthwork in excavation of foundation/ in trenches for pipes including dressing and levelling the bed and depositing the soil within initial lead and lift in all kind soil etc. as per specification and direction of EIC. | 44.8 | cum | 299.53 | ₹13,418.94 |
| 1.02 | Supplying all materials, labour and T&P for filling foundation and plinth with sand well watered and rammed etc. as per specification and direction of EIC. | 7.86 | cum | 874.52 | ₹6,873.73 |
| 1.03 | Supplying all materials, labour and T&P for Cement concrete (1:3:6) using 40 mm size CBHG metal in foundation and floor, watering and curring etc as per specification and direction of EIC. | 8.28 | cum | 6,293.28 | ₹52,108.36 |
| 1.04 | Supplying all materials, labour and T&P for RCC work of M-25 grade with 20 mm and down grade black CBHG chips, watering and curring etc as per specification and direction of EIC. | 16.44 | cum | 6,715.35 | ₹1,10,400.35 |
| 1.05 | Supplying all materials, labour and T&P for Cutting, bending and binding of M.S rods for RCC works including cost of M.S rods and binding wire etc. | 16.44 | Qntl | 8,325.85 | ₹1,36,876.97 |
| 1.06 | Supplying all materials, labour and T&P for 2.50 cm thick grading concrete with C.C (1:2:2) using 6 mm size CBHG chips, watering and curring etc. as per specification and direction of EIC. | 26.88 | sqm | 396.81 | ₹10,666.25 |
| 1.07 | Supplying all materials, labour and T&P for rigid smooth centering and shuttering for RCC works including false work and dismantling then after casting etc. | - | - | - | - |
| 1.08 | Foundation PCC | 92.54 | sqm | 248.67 | ₹23,011.92 |
| 1.09 | Roof slab & Chajja | 41.68 | sqm | 762.1 | ₹31,764.33 |
stage.html
html • 0.01 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.17 MB
KISOK_BHUBAN.pdf
Tender Documents • 2.36 MB
BOQ_608271.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .