Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.3 LAccepted-AOC | ₹2.3 L | L1 | Accepted-AOC L1 |
| 2 | L2₹2.5 LRejected-Finance | ₹2.5 L | L2 | Rejected-Finance L2 |
| 3 | L3₹2.6 LRejected-Finance | ₹2.6 L | L3 | Rejected-Finance L3 |
| Sl No | Description | Qty | Unit | IDDINKUNHI ALIAS KHALID A.K L2 | MOHAMMAD MANSAD M L3 | prakash a L1 |
|---|---|---|---|---|---|---|
| 1.00Retarring | ||||||
| 1.00 | 5.5.B.2a:Modified Penetration Macadam 75 mm thick using Bitumen S-65 Construction of penetration macadam over prepared base by providing a layer of compacted crushed coarse aggregate using chips spreader with alternate applications of bituminous binder and key aggregates and rolling with a three wheel 80-100 kN static roller to achieve the desired degree of compaction as per Technical Specification Clause 506. (B) 75 mm thick :- (II) Bitumen (S-65) | 5.24 | sqm | 386.59 ₹2,025.73 | 400 ₹2,096 | 370 ₹1,938.80 |
| 1.00 | 5.2.1a:Tack Coat Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.20 to 0.25 kg per sqm on the prepared bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503. | 859.5 | sqm | 13.86 ₹11,912.67 | 15 ₹12,892.50 | 13 ₹11,173.50 |
| 1.00 | 5.11.1.A.2a:Mix Seal Surfacing - Manual Means - Type A - Bitumen S-65 Providing, laying and rolling of close-graded premix surfacing material of 20 mm thickness composed of 11.2 mm to 0.9 mm (Type-A) or 13.2 mm to 0.9 mm (Type-B) aggregates using penetration grade bitumen to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 8-10 kN static roller and finishing to required level and grades as per Technical Specification Clause 509 By Manual Means :- Type A (II) Bitumen (S-65) | 859.5 | sqm | 276.78 ₹2.4 L | 280 ₹2.4 L | 250 ₹2.1 L |
| 1.00 | 3.14:Construction of Subgrade and Earthen Shoulders Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1. | 3.86 | cum | 614 ₹2,367.58 | 614 ₹2,367.58 | 600 ₹2,313.60 |
Tender Value
₹2.5 L
EMD Value
₹6,355
Closing Date
3 Feb 2026, 5:00 pmClosed
AKHILA_C_V
OFFICE OF ASSISTANT ENGINEER VORKADY
Annual plan 2025 26 VORKADY GP PRO 371 2025 26 KVK PHC Road Maintenance Ward 13 General Civil Work
2026_LSGD_830548_10
62/AE/VKD/2025-26
Open Tender
Civil Works - Roads
VORKADY_GP
Please refer Tender documents.
8 documents required · 8 mandatory
₹565
₹6,355
24 Mar 2026
27 Jan 2026
5 Feb 2026
27 Jan 2026
3 Feb 2026
27 Jan 2026
Retarring
5.5.B.2a:Modified Penetration Macadam 75 mm thick using Bitumen S-65 Construction of penetration macadam over prepared base by providing a layer of compacted crushed coarse aggregate using chips spreader with alternate applications of bituminous binder and key aggregates and rolling with a three wheel 80-100 kN static roller to achieve the desired degree of compaction as per Technical Specification Clause 506. (B) 75 mm thick :- (II) Bitumen (S-65)
5.2.1a:Tack Coat Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.20 to 0.25 kg per sqm on the prepared bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503.
5.11.1.A.2a:Mix Seal Surfacing - Manual Means - Type A - Bitumen S-65 Providing, laying and rolling of close-graded premix surfacing material of 20 mm thickness composed of 11.2 mm to 0.9 mm (Type-A) or 13.2 mm to 0.9 mm (Type-B) aggregates using penetration grade bitumen to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 8-10 kN static roller and finishing to required level and grades as per Technical Specification Clause 509 By Manual Means :- Type A (II) Bitumen (S-65)
3.14:Construction of Subgrade and Earthen Shoulders Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1.
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1395980.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.23 MB
Tendernotice_2.pdf
PDF • 0.02 MB
Tendernotice_3.pdf
PDF • 0.03 MB
SBD.pdf
Tender Documents • 1.03 MB
BOQ_1395980.xls
BOQ • 0.30 MB
FOT.pdf
Tender Documents • 0.01 MB
PA.pdf
Tender Documents • 0.11 MB
AFFIDAVIT.pdf
Tender Documents • 0.10 MB
Download all tender documents and submit your bid