| 1 | L-1₹20.8 LAccepted-AOC WARD NO 3 OLD BANGALI COLONY KICHHA U S NAGAR | L-1 | Accepted-AOC Work awarded | |
| 2 | L-2₹21.0 L+₹14,643.14 (0.70%)Rejected-Finance CC 1 BOOTH NO 8 JANTA BHAWAN ROAD SIRSA SIRSA HARYANA 125055 | SIRSA | HARYANA | 125055 | L-2 | Rejected-Finance Due to higher rate | |
| 3 | L-3₹21.8 L+₹1.0 L (4.84%)Rejected-Finance NEAR EAST WEST PUBLIC SCHOOL SHAHABAD GATE RAMPUR U P | L-3 | Rejected-Finance Due to higher rate |
Tender Value
Refer Docs
EMD Value
₹66,000
Closing Date
20 Jun 2023, 11:00 amClosed
Superintending Engineer
Electricity Distribution Circle, Rudrapur
Erection of New Pole in Longer Span of 33 KV, 11 KV line and Replacement of damage/rusted pole at 33/11 KV S/s Sector-07, SIDCUL, Pantnagar under EDD, Rudrapur-I
2023_UPCL3_59228_1
EDC(USN)24/2023-24
Open Tender
Electrical Works
Item Rate
90 days
Rudrapur
Pl. refer tender document
3 documents required · 3 mandatory
₹1,180
EE ETD Rudrapur
₹66,000
23 Aug 2023
2 Jun 2023
21 Jun 2023
2 Jun 2023
20 Jun 2023
2 Jun 2023
Amount
Annexure -A ( Works )
Cartage of STP SP-55 Pole including Loading /Unloading safely from store centre at Rudrapur to work site (Distance 0 to 10 KM).
Cartage of small material with conductor including Loading /Unloading safely from sstore centre at Rudrapur to work site (Distance 0 to 10 KM).
Head load cartage of STP SP-55 Pole from road side to work site charges of cable and other materilas
Head load cartage of small material road side to work site charges of cable and other materilas
Charges of Excavation of Earth for Pole Pit size 0.9x0.6x1/6 of pole length for erection of ST SP-55 Pole (22 Nos.) in all type of soil as per direction of Engineer in charge.
Charges of Lopping & Chopping of tree branches near by the line as per direction of Engineer in charge.
Charges of Errection of Single Pole structure on SP-55 Pole after digging of pits in size 0.9*0.6*1/6 of pole length and grouting by CC Mixure of ratio 1:4:8 including fixing & fitting of all required accessories on poles complete in all respect as per RESPO Spn. & instruction of Engineer In Charge.
Charges of Errection of Double Pole structure on SP-55 Pole after digging of pits in size 0.9*0.6*1/6 of pole length and grouting by CC Mixure of ratio 1:4:8 including fixing & fitting of all required accessories on poles complete in all respect as per RESPO Spn. & instruction of Engineer In Charge.
Charges of fitting and fixing of triangular bracket at 33 KV/11 KV with cutting, drilling holes and fabrication charges as required by Engineer in charge for proper completion
Charges of restraightening of tilted support of 11 KV line after welding of angle of three side and grouting, muffing complete as per directon of Engineer in charge.
Charges of Fabrication & Fixing of M.S. Channel 100x50 mm & MS angle 65x65x6 mm (supplied by the department) with cutting, drilling holes and fabrication charges as required by Engineer in charge for proper completion.
Charges of Muffing of STP Poles with CC 1:2:4 block and 45 cm height from ground level including cost of required material as ballast, cement, sand etc complete in all respect as per direction of work incharge.
Charges of resagging of 11 KV line after erection of pole on ACSR Dog conductor as per direction of Engineer in charge.
Charges of painting of poles after removing of Rust by embry paper 2 coat of primer & 1 coat of al. paint as per direction of Engineer in charge.
Charges of Erection of MS earthing rod 20x2500 mm by earth, electrod, connection with support by means of earth wire 6 swg with nut & bolts in all complete work as per direction of Engineer in charge
Charges of Erection of stay set 16x1800mm. pit size 0.6x0.9x1.2 Mtr. as per specifications including 7/10 SWG stay wire, binding, nozzling of stay with bcking filling of pit with CC 1:4:8 in bottom to pitcomplete work stay set will be provided by UPCL as per RESPO specification & as per direction of Engineer in charge.
Charges of Grouting of stay in CC 1:4:8 of size 0.6x0.6x0.3 mtr including cost of cement compete work as per direction of Engineer in charge.
Annexure - B ( Supply )
Supply of X-arm Clamps for S.P.-55 made of M.S. flat of size 65x6 mm. with 65x16mm Bolt, Nut & washer duly painted by red oxide primer. The clamp should be free from any crack, welding & burns complete in all respect as per UPCL Specification.
Supply of Double Pole Clamps for S.P.-55 made of M.S. flat of size 65x6 mm. with 65x16mm Bolt, Nut & washer duly painted by red oxide primer. The clamp should be free from any crack, welding & burns complete in all respect as per UPCL Specification.
Supply of Stay Clamps for S.P.-55 made of M.S. flat of size 65x6 mm. with 65x16mm Bolt, Nut & washer duly painted by red oxide primer. The clamp should be free from any crack, welding & burns complete in all respect as per UPCL Specification.
Supply of Earth Wire Clamps made of M.S. flat of size 50x6 mm. with 65x16mm Bolt, Nut & washer duly painted by red oxide primer. The clamp should be free from any crack, welding & burns complete in all respect as per UPCL Specification.
Supply of Nut and Bolt Offsize
ASHOK KUMAR AND CO
TNK Electricals
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .