| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹32.0 LAccepted-AOC | L1 | Accepted-AOC L1 Quoted | |
| 2 | L2₹42.0 L+₹10.0 L (31.2%)Rejected-Finance | L2 | Rejected-Finance L2 Quoted |
Tender Value
₹34.2 L
Closing Date
8 Dec 2017, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
CHIEF EXECUTIVE OFFICER
CYBERPARK, PARK CENTRE, KSITIL SEZ, NELLIKODE P O, KOZHIKODE, KERALA
TENDER FOR DESIGN, SUPPLY, INSTALLATION AND TESTING OF SEMI-UNITIZED STRIP WINDOW WORKS FOR SAHYA BUILDING, CYBERPARK KOZHIKODE
2017_CP_162877_1
CP/SAHYA/GLAZING/CLT/2017/09
Open Tender
Civil Works - Others
Item Rate
90 days
CYBERPARK KOZHIKODE KERALA
AS PER NIT
8 documents required · 8 mandatory
₹2,950
online
Exempted
PARK CENTRE CYBERPARK KOZHIKODE
9 Feb 2024
30 Oct 2017
13 Dec 2017
30 Oct 2017
8 Dec 2017
30 Oct 2017
10 Nov 2017
Amount
Semi unitized Structurally Glazed System
Scope: Designing the Semi unitized structural glazing system as per design intent and as per approved drawings, preparation of shop drawings, supply, fabricate the panel with the specified glass on the child frame at factory, erect the system on erected extruded main frame & Transom fixed on supporting system at site as per approved shop drawings at all floor levels and for all heights. Designing, providing and fixing frame supporting system, the framing system (i.e. Main & Child frame) to support Vision panels / openable Top hung window panels/ punched / strip windows to any shape & profile, flashing including gaskets, sealants necessary accessories, as part of the system supported between the Structural faming system as detailed below and as per the specification for external facade system.
Design the split framing semi unitized glazing system in case of Punched windows with vision panel proposed with either Insulated/Monolithic Glass as specified maintaining groove width shall not be more than 16 mm both in horizontal and vertical. Conducting the test for the materials involved in the system, field test on the erected system at site as per the test criteria set out in the specification of External Facade system. Submission of methodology for the Materials and assembly (Mock up & field test) supported by the copy of relevant codes & Standards and the same shall be got approved by the Employer / PMC / Architect prior to testing. Protection of the System and Materials till handing over to the Employer / PMC / Architect, removal of the unwanted materials, broken glass, Screws, bolts, Nuts, Packing Materials, debris etc, regularly and keeping the premises neat and clean at all times.
Coordinate the details of the façade cleaning system during the preparation of shop drawing and incorporate such details in the shop drawing submitted for approval of Employer / PMC / Architect. Maintaining the system by means of periodical inspection at site (bi-monthly) and checking the system and Materials involved in the system during Defects liability period (this will not relieve the contractor from the condition laid down in the contract under defects liability period) to ensure that the system and all materials are free from any defects during this period. Providing the Guarantee for the entire External Façade system to the specified period in an approved format supported with Back to back guarantee from the specialized Material supplier like Glass, Gasket, Sealant, Hardware etc. complete as directed by Employer / PMC / Architect.
I.DESIGN: a. Design: Design pre-assembled aluminium Semi unitized Structurally glazed windows with continuous framed panels / Strip window / Punched window system with split mullion to any shape and profile to satisfy the structural design criteria (Minimum wind pressure shall be 150 Kg/Sqm) as per IS code or relevant international code) (Test pressure shall be 1.5 times of the design wind pressure) and fixed at horizontally / vertically / sloped / curved position etc as shown in the approved drawings by using Aluminium extrusions, Glass, Spacer tape, Gasket, Sealant etc. as specified.
Contractor shall be responsible to determine the maximum design wind pressure and lateral forces, moments, stresses etc. applicable for the system. Negative / suction pressures if determined as per IS 875 and Lateral forces as per code IS 1893 shall make allowances as described in the code for corner effects on the system. System shall be designed with Air Pressure equalization chamber and concealed continuous gutter vertically and horizontally at all levels as self drainage barrier to achieve water tightness besides providing EPDM Gaskets on the frame and EPDM Gasket / Sealant on the external groove as air and water barrier.
b. System: System shall be designed to satisfy the structural design criteria specified in the technical specification with self-bearing modular elements supported between floors (Supporting span of bracket for mullion is inth range of 2.0 to 2.50 meter with top & bottom transom connection on each mullion) in the case of structural glazing and mullion supported between RC Members, EPDM Gaskets on the frame and Gasket/sealant on the groove to prevent the system from Air & water penetration ,double adhesive spacer tape, backer rod, sealant, supporting brackets (Resistance to design wind pressure), Separator Gaskets for Bi-Metallic Corrosion, Pressure equalization chamber in the system, built-in continuous internal drainage gutter for collection and facility at lowest floor level to drain out penetrated water, in built adjustability to accommodate thermal expansion, thermal movement and movement due to any other forces etc.
System shall be designed with Gasket/Sealant on the external groove with colour anodized aluminium holder alround the panel to the required width and thickness as per design as Dead load support to the Glass panel. Non Staining sealant between glass & aluminium holder alround the panel shall be provided. Glazing the panel with child frame shall be done only at factory at the controlled atmosphere to erect the panel on erected extruded aluminium main member and transom with supporting system at site fixed on the RC surface. The Mullion and Transom flush on inside of the facade. Intermediate transoms shall be provided keeping 2 to 3mm recessed from the inner face of the mullion. Joints between mullion and transom shall be filled with weather sealant on the inside. All transoms shall have uniform in depth as same as mullion.
Full size mullion shall only be used in all cases including peripheral members, peripheral members shall have sub frame (sash) on both sides in such way to hold the glass on one side and flashing / peripheral flashing on the other side. Vertical in-situ glazing shall not be carried out during construction/erection stage. System shall be designed in such a way that the outer surface of insulated glass unit, monolithic glass unit and any type of metal panel shall be in the same plane or as per approved drawing. Aluminium shim shall be used for level adjustment of bracket but more than 20 mm is not acceptable. If more than 20 mm bracket shall be designed according to site condition. Aluminium cleat shall be used for fixing the glazing shall be minimum size of 50 mm long and spaced at 450 mm as maximum and each cleat shall have minimum 2 SS screws and the screws shall be soaked with weather sealant.
c. Movement: System shall be designed to accommodate movement due to any force including lateral/dynamic pressure movement, horizontal & vertical building movement panels and on the framing system with support brackets, gaskets and fastening devices. System shall be designed to accommodate the size and shape of the glass panel as per the approved drawings including approved modifications as may be required during execution as well as all other incidental forces and stresses likely to be experienced under service conditions, i.e. Lateral force, Dead weight and Thermal expansion due to building movement both vertical and horizontal etc.
The supporting system shall consists of Brackets / Clamps, fastening straps, nuts, bolts, rivets, washers and other fastening materials etc. Extruded sections shall be designed to accommodate Insulated Glass Unit (IGU) / Monolithic (Single) Glass as per the approved shop drawings. Extruded aluminium sections shall be 63400 (H9) grade conforming to IS 8147, finished with AC25 grade Architectural quality electrolytic colour anodic coating of approved colour conforming to IS 1868.
d. Glass: Supply of glass either Insulated glass, Double or Monolithic glass as per the options given in Schedule of quantities to the respective place to fix the glass on the system. Fixing the glass shall form part of the system cost quoted under respective items. Spacer for Insulated glazing unit shall be aluminium extruded profile and finished with AC 25 grade electrolytic colour anodic coating of black colour conforming to IS 1868 and filled with dry desiccant. Primary sealant shall be Poly-isobutylene (PIB) and Secondary seal shall be structural silicon sealant of DC 995 (one part) or DC 983 (two parts) of Dow corning or approved equivalent. Make and thickness of Inner pane glass shall be the same make as outer pane glass of IGU/DGU. However all the glass panes are shall be heat strengthened and the protection of glass as specified shall be responsible of the Bidder/Processor.
Processing of Glass: Details of the processor and their facilities should be submitted to the Employer/PMC/Architect for approval. Insulated glazing unit shall be processed only by the approved Processor. All glass panes used in the glazing shall be heat strengthened conforming to ASTM C 1048. No tong marks shall be allowed in the processed glass. Necessary test certificate shall be produced by the processor to confirm the adherence of the parameters set out in the codes and standards. New substrate glass shall only be used for coating and to ensure the same, a certificate shall be produced by the contractor. Making necessary arrangement to inspect the Glass processor by the representative of Employer, PMC and Architect (one representative from each as minimum) during the progress of glass processing.
Glass Manufacturer shall ensure that only new substrate glass is used for coating and necessary inspection procedure shall be adopted to eliminate the incidence of Nickel sulphate (NIS) inclusion on the float glass used for coating and to ensure the same, a certificate from glass Manufacturer shall be obtained by the contractor and submit the same to Engineer-in-charge. Contractor shall arrange for obtaining necessary clearance from the processor for the inspections of the glass processing plant during the progress of glass processing and to carry out the random test (Minimum 3 nos) at the glass processor lab by Engineer-in-Charge. It shall be the responsibility of the contractor to make sure that the glass shall be processed as per specification and it shall be conforming to the criteria of the respective codes and standards. The contractor shall have to submit certificate from the glass processor that the glass processing has been done as per specification and codal provisions has been observed and such copy of codes shall be made available for verification of Employer / PMC / Architect.
Processor shall provide removable Safety clips on each corner of glass and provide self adhesive plastic sheet to the required thickness on the external surface of the glass as a safety measure prior to packing to avoid breakage of glass in the corners during transit, free from scratches and this safety clip shall be retained till the glass is taken for Glazing in to the frame at factory and plastic sheet shall be retained till handing over the project. Glazed panel with broken or Chipped off glass at the edges and with any scratch on the surface of the glass shall not be allowed to use in the Facade and found any such damages in the glazed panel even after glazing / erected in place shall be rejected and shall be replaced with new one after the approval of installation methodology by Employer / PMC / Architect
Mode of Measurement: Length and breadth of the superficial area of the finished work shall be measured centre to centre of the grooves on the external surface viewed externally correct to a centimeter under the respective items. Areas shall be calculated in a square meter correct to two places of decimal.
e. Gaskets: Providing and fixing weather barrier to ensure the air & water tightness at minimum 3 stages and to ensure that the system is thermally broken systems in addition to the Non staining weather sealant on the exposed screws. The first barrier exposed to weather condition shall be Elastomer silicon synthetic rubber manufacture by oven process at different stages conforming to BS or equivalent IS. The properties of Elastomer silicon synthetic rubber such as hardness, tensile strength elongation compression test & ozone resistance shall be in accordance with BS 903 & BS 903A minimum hardness (shore A) of Elastomer silicon synthetic rubber shall be 65 to 75 Deg and the weather strip with in the system for unexposed shall be Elastomer EPDM (Ethylene Propylene Dinine Monomer) synthetic rubber and its properties like hardness, expanded density (Specific gravity) compressive set, water absorption, skin surface, cell structure, ozone resistance, low temperature includes work shall be in accordance with ASTM D – 1056 and minimum hardness ( Shore A ) shall be 61/71 Grade.
f. Sealing: Design bite and thickness of structural sealant to withstand 3 times of the stress caused by the design wind pressure specified above and to ensure the same, the design calculation of sealant manufacturer shall be submitted along with shop drawing. Necessary materials as proposed in the shop drawing such as Extruded member with finish, glass and any other material required by the Sealant manufacturer shall be supplied to them to carryout the test as per relevant codes & standards in order to validate the bite and thickness designed by them. Contractor shall obtain the test certificate from Sealant manufacturer and submit the same along with shop drawing and supported by the copy of relevant codes and standards. Contractor shall ensure that the bite and thickness of sealant as designed & determined by calculation, verified and tested by Manufacture's is followed in the shop drawing and the same shall be adopted for the glazing at factory after the approval of shop drawing. Field test shall be conducted for adhesion of sealant with in the quoted rate.
Supplying and fixing the Sealant as per specification and Double Adhesive spacer tapes for glazing the panel at factory. Spacer tape shall be open cell of code no. V 2200 of Nortan Grind well make or approved equivalent, Jointing / Sealing of the glazed panel at factory shall be done with Non structural (weather) sealant / Non staining sealant of DC 991 HP of Dow corning make or approved equivalent with Polyurethane baker rods of Supreme make or approved equivalent. Acetoxy sealant shall not be used for Structural Glazing application. In general, providing and fixing the Structural and non Structural (weather) sealant shall be as follows:
Shop / Factory Sealants:i) Structural sealant shall be DC 995 (one part) or DC 983 (Two part) of Dow corning make or approved equivalent.ii) Non-Structural (weather) sealant shall be DC 991 HP of Dow corning make or approved equivalent.
Field Sealants:i) Structural Sealant shall be DC 995 (one part) of Dow corning make approved equivalent.ii) Non-Structural (weather) sealant shall be DC 991 HP of Dow corning make or approved equivalent.
g. System Supports : Providing and fixing the supporting system with Brackets / Clamps including fastening straps, nuts, bolts, rivets, washers etc. as per design requirement and as per approved shop drawing. Brackets / Clamps shall be of hot dip galvanized steel and fastening materials shall be Non - magnetic Stainless steel 300 series - 316 grade of Hilti make or approved equivalent. Galvanizing thickness shall be in accordance with IS 2629 and 4759. Providing and fixing serrated plates or serrated washer wherever required as per the system requirement and as shown in the approved shop drawing. Shim thickness beyond 20mm is not permitted. Shims shall be similar material, preferably with aluminium, not more than 20mm thick and if the variation is beyond 20 mm, the bracket shall be designed accordingly with fastener.
h. Flashing (If required) : Providing and fixing flashing on the unexposed area at required levels including peripheral of glazing and window as part of the system (applicable only for continuous structural glazing portion) made to profile (both horizontal & vertical) as shown in the approved drawings and the profile shall be made out of hot dip galvanized sheet 1.2 mm thick and galvanizing coating thickness shall be in accordance with IS 2629 & 4759 and all exposed flashing shall be 1.2 mm thick aluminium anodized / powder coated sheet shall be considered. In general, the flashing shall be provided to the entire length of Curtain wall / structural glazing portion horizontally at all floor levels, vertically and at terrace level with a overlap of 100 to 125 mm in plan and the joints shall be sealed with weather silicon sealant and with recessing anchoring system soaked and SS fastening devices in sealant of Hilti make or approved equivalent.Also, the flashing shall be provided at parapet top below the coping to drain the water during any seepage through the sealant joints with overlap of 100 to 125 mm in plan with sealant at joints to make sure that no water leakage through coping / flashing joints.
j. Top hung Openable window Hardwares: Providing and fixing the hardwares for the shutter with heavy duty self balancing stainless steel friction hinges, corner transmission, detachable restrictor stay assembly and Multi point locking with heavy duty mechanism (minimum 9 points including corner locking point), handle with key at centre of the transom having a ceremony. Handle / cremony shall be made out of aluminium die cast with powder coat finish - 65 microns, matching to the transom profile colour. Rate shall include the shutter frame as designed to accommodate the Hinge, stay arm and multi point lock, EPDM gaskets, fastening materials including all other necessary materials etc. Hinge shall have thermoplastic asymmetric end cap to ensure weather tight sealing at the ends.
Rate shall exclude cost of Glass and main frame, but include cost of sub frame for shutter and the frame to be designed to fix all the hardwares specified like heavy duty self balancing stainless steel friction hinges of Model no SPT 26, Corner Transmission Model no 9312, corner locking point model no 9313 and restrictor stay arm assembly model no SRD 8 with release key of model no R 7437 of Securestyle (UK) make or pre approved equivalent make and Multi point lock (minimum 9 point) and handle / cremone size of 110 x 27mm with key of Model no 610 K of Alualpha make or pre approved equivalent make. Shutter will have a provision for hold open option and to restrict the opening not more than 200 mm and to keep the vent weather tight while closing the shutter. Compressible Gaskets shall be designed to ensure the air and water tight including noise control while the shutter is closed in position and the gasket shall be silicon synthetic rubber of required strength. Rate shall include for providing master key - 3 sets (floor wise) & Grand master key - 3 sets (building wise) for openable with necessary coding engraved on the keys etc, complete..
k. Visual mock up: Providing and fixing full scale visual mock-up with minimum 3 bays with openable window, ACP cladding, smoke seal and other special architectural features etc, to establish the actual system design prior to proceeding with full scale production of the materials involved in the system. Conduct a water test on the installed visual mock up system, (only water using hose real to the specified pressure in the technical specification) and submit the test result of the system for review. Rate shall include for any improvements required on the system based on the test result by the Glazing contractor.
l. Field Test: Conduct Field test at site on the installed glazing system as per the criteria set out in the specification of the external facade system and as per the Methodology described in ASTM 501-2. Test shall be carried out in the presence of Employer/PMC/Architect. Methodology for carrying out the test shall be submitted to Architect for approval prior to testing. The results shall be recorded and the reports shall be submitted to the Engineer in charge for approval. If Field test fails, contractor shall submit the rectification methodology to correct the defects as per the performance data set out in the Specification of external facade system and as per the methodology described in the relevant code for the approval of PMC/Architect .Defects, if any noticed shall be rectified to the satisfaction of Employer / PMC / Architect.
m. General : System design in total, including Aluminium extruded frames, type & thickness of Glass pane, Aluminium sleeves at connections, inserts, EPDM Gaskets / Silicon rubber, Adhesive tapes, Sealant, Supporting system / bracket including fastening and anchoring system & Materials specified in the schedule and the system details as shown in the tender drawing are only tentative and is meant to set out a general outline of the Proprietary system and minimum requirements/ properties of the system and component parts.
The general guidelines governing the system design and performance parameters as set out in the Specification relating to External Façade System and the contents therein. Since the External Façade system in terms of Design, materials, all fixing details, methodology of execution are proprietary in nature, the onus of the design and Performance requirements, shop drawing, execution etc satisfying the design intent and specification of external facade system including conducting the site survey prior to and after preparation of shop drawing and accommodating the site conditions in the system at appropriate levels etc lies solely with the Contractor.
n. Mode of Measurement: Length and breadth of the superficial area of the finished work shall be measured centre to centre of the grooves on the external surface viewed externally correct to a centimeter under the respective items. Areas shall be calculated in a square meter correct to two places of decimal.
p. Rate. Quoted rate shall include the cost of all materials and labour involved in all the operations as specified above, specified in the external facade system, to execute the work as per approved drawings / shop drawings including, scaffolding, infrastructure facility, tools and plants etc. necessary for execution of the respective item for all height and for all floor levels, Item measurable in sqm. Rate shall include the cost of field test, visual mock up, supplying & fixing of glass, fixing of window hardware, but rate shall exclude the cost of Insulation on spandrel, supply of doors, supply of hardware for top hung window which will be measured separately and paid under respective item given below.
Semi unitized Structurally glazed Strip window / Punched window (System with Glass): Quote rate for complete system designing, providing and fixing Semi Unitized structurally glazed punched / strip window structurally held in position by Structural sealant and factory fabricated with Aluminium adaptor of suitable size in order to satisfy the structural design criteria specified in the Technical specification. In general, the system comprising Aluminium anodized extruded frames & Adapters supported on the brackets spanning in the range of 2.0 to 2.50 M, Toggle cleats, aluminium anodizing coated 'L' angle 50 x 25 - 2.30 mm thick around the punched / strip window, HDG concealed shoe brackets & SS anchors and bolts etc with Insulated Glass of 24 mm thick having 6 mm thick Reflective coated glass on # 2 surface - ET 725/125 of Saint Gobain make as outer pane and 12 mm airgap and 6 mm thick uncoated clear glass as inner pane of same make. Both panes are heat strengthened.
Rate shall exclude the cost of supply of top hung window hardwares, which will be measured and paid separately under the respective item below. Rate shall include the cost of supplying & fixing of glass, fixing of Top hung window hardwares, visual mock up and field water test. Sizes of windows are listed below. a. 7250 (7 equal panel) x 2150 mm - 1 No b. 7500 (7 equal panel) x 2150 mm - 16 No c. 7625 (7 equal panel) x 2150 mm - 2 No d. 5650 (5 equal panel) x 2150 mm - 1 No e. 4950 (5 equal panel) x 2150 mm - 1 No
Hardware for top hung window: Quote extra rate over & above the glazing / window item for designing, supplying of hardwares for top hung open able outward shutter having Heavy duty Multi point lock with required points based on the window panel size and handle with or without key with detachable handle of Model no 610 K / 670 of Alualpha make, SS friction hinges of Model no SPT 26, Corner Transmission Model no 9312, corner locking point model no 9313 and restrictor stay arm assembly model no SR 8 with release key of model no R 7437 of Securestyle (UK) make or approved equivalent make and as per particular specification. Rate shall exclude cost for supplying and fixing of glass and main frame, but include cost of hardwares and sub frame for shutter. System to be designed to with stand design wind pressure and other load parameters specified.
Gefab Facade Solutions Pvt ltd.
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .