| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹20.7 LAccepted-AOC | ₹20.7 L Quoted ₹22.2 L | L1 | Accepted-AOC Lowest quoted |
| 2 | L2₹22.6 L+₹40,670.12 (1.83%)Rejected-AOC | ₹22.6 L+₹40,670.12 (1.83%) | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | Devasia Sebastian L1 | SOJANFRANCIS L2 |
|---|---|---|---|---|---|
| 1.00Protection Work | |||||
| 1.00 | 2.31:Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared | 100 | sqm | 19.83 ₹1,983 Lowest | 20.19 ₹2,019 |
| 1.00 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 130.78 | cum | 280.82 ₹36,725.36 Lowest | 285.97 ₹37,398.87 |
| 1.00 | 60.7.3:DISMANTLING DR - Dismanling , clearing away and carefully stacking materials useful for reuse for any thickness of walls in DR masonry including disposal of debris within a distance of 150m. | 3.15 | cum | 825.7 ₹2,600.96 Lowest | 840.85 ₹2,648.68 |
| 1.00 | 60.7.8:DR with Departmental. Stone - DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course using departmental rubble including packing to compactness to lines and levels, labour charges etc. complete as per direction of Departmental officers at site | 1.89 | cum | 1,870.31 ₹3,534.89 Lowest | 1,904.63 ₹3,599.75 |
| 1.00 | 60.64.1:Coconut Pile - Supplying and stacking well matured straight coconut post for driving down throug various strata bellow bed level including cost coveyance labour charges etc complete. | 472 | metre | 156.07 ₹73,665.04 Lowest | 158.93 ₹75,014.96 |
| 1.01 | OD50109/2025-2026:Coconut Pile - Driving down coconut pile to lines and levels through soft to medium clay soil strata including all hire charges and labour and all other appliances necessary for pile driving down after pointing the bottom end, where no accesibility to hydraulic excavator through land and water Body having width 10 Metre or above. Details for one post of 6m long 10 numbers per day 6X10=60m Details for 60m length. | 354 | metre | 366.12 ₹1,29,606.48 Lowest | 372.84 ₹1,31,985.36 |
| 1.01 | 60.64.2:Coconut Pile - Supplying and stacking well matured 1/2 split and straight coconut post for driving down throug various strata bellow bed level including cost coveyance labour charges etc complete. | 220.5 | metre | 148.2 ₹32,678.1 Lowest | 150.92 ₹33,277.86 |
| 1.01 | OD50111/2025-2026:Conveying stacked half split wailing pieces for tying in position with coir yarn already driven full size coconut post etc. complete | 220.5 | metre | 76.7 ₹16,912.35 Lowest | 78.11 ₹17,223.26 |
| 1.01 | 60.7.6:Supplying and stacking granite stone 20 to 45 dm3 for dumping works- Supplying at site of work granite stone 20 to 45 dm3 in size (60% 45m3,30%30 to 40dm3 and 10% 20 to 30dm3 stones) for measurement ( deducting not less than 15% for voids as fixed by the departmental officer at site) including all cost, conveyance, loading and unloading charges all other incidental charges all leads and lifts etc. complete as per the direction of the departmental officers at site. | 154.88 | cum | 2,509.81 ₹3,88,706.82 Lowest | 2,555.86 ₹3,95,838.82 |
Tender Value
₹20.3 L
EMD Value
₹50,000
Closing Date
13 Mar 2026, 5:00 pmClosed
Executive Engineer Irrigation Division Kottayam
O/O Executive Engineer Irrigation Division Kottayam
GENERAL-Protecing the right bank ofMeenachil river near Madappattumali Kadayapparambu bhagom in ward no8 of Thiruvarppu Panchayath in Ettumanoor ConstituencyGeneral Civil Work
2026_Irrig_844459_1
IRR/IA/TR/3671/2023_5_1_1/1
Open Tender
Civil Works - Others
Item Rate
180 days
ward no.8 of Thiruvarppu Panchayath
9 documents required · 9 mandatory
₹2,760
Yes
₹50,000
Yes
18 Jul 2026
6 Mar 2026
16 Mar 2026
6 Mar 2026
13 Mar 2026
6 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Protection Work | |||||
| 1.001 | 2.31:Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared | - | sqm | - | - |
| 1.002 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 0.6 | cum | - | - |
| 1.003 | 60.7.3:DISMANTLING DR - Dismanling , clearing away and carefully stacking materials useful for reuse for any thickness of walls in DR masonry including disposal of debris within a distance of 150m. | 1 | cum | - | - |
| 1.004 | 60.7.8:DR with Departmental. Stone - DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course using departmental rubble including packing to compactness to lines and levels, labour charges etc. complete as per direction of Departmental officers at site | 1 | cum | - | - |
| 1.005 | 60.64.1:Coconut Pile - Supplying and stacking well matured straight coconut post for driving down throug various strata bellow bed level including cost coveyance labour charges etc complete. | - | metre | - | - |
| 1.006 | OD50109/2025-2026:Coconut Pile - Driving down coconut pile to lines and levels through soft to medium clay soil strata including all hire charges and labour and all other appliances necessary for pile driving down after pointing the bottom end, where no accesibility to hydraulic excavator through land and water Body having width 10 Metre or above. Details for one post of 6m long 10 numbers per day 6X10=60m Details for 60m length. | - | metre | - | - |
| 1.007 | 60.64.2:Coconut Pile - Supplying and stacking well matured 1/2 split and straight coconut post for driving down throug various strata bellow bed level including cost coveyance labour charges etc complete. | - | metre | - | - |
| 1.008 | OD50111/2025-2026:Conveying stacked half split wailing pieces for tying in position with coir yarn already driven full size coconut post etc. complete | - | metre | - | - |
| 1.009 | 60.7.6:Supplying and stacking granite stone 20 to 45 dm3 for dumping works- Supplying at site of work granite stone 20 to 45 dm3 in size (60% 45m3,30%30 to 40dm3 and 10% 20 to 30dm3 stones) for measurement ( deducting not less than 15% for voids as fixed by the departmental officer at site) including all cost, conveyance, loading and unloading charges all other incidental charges all leads and lifts etc. complete as per the direction of the departmental officers at site. | - | cum | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1425731.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.05 MB
viewsbd.pdf
Tender Documents • 2.81 MB
viewnit.pdf
Tender Documents • 0.03 MB
BOQ_1425731.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .