| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.5 LAccepted-Finance 131 NILMONI BHATTACHARJEE LANE KADAL BERHAMPORE MURSHIDABAD W B PIN 742102 | BERHAMPORE | MURSHIDABAD | WEST BENGAL | 742102 | L1 | Accepted-Finance L1 | |
| 2 | L2₹8.8 L+₹36,000 (4.26%)Rejected-Finance | L2 | Rejected-Finance L2 | |
| 3 | L3₹9.4 L+₹90,000 (10.6%)Rejected-Finance | L3 | Rejected-Finance L3 |
| Sl No | Description | Qty | Unit | SANJIB GHOSH L1 | SRIDAM MONDAL L2 | S K CONSTRUCTION L3 |
|---|---|---|---|---|---|---|
| 1.00 | Charges for providing 03 no semi skilled lift attendant for 1(one) No Lift (3 shift, i.e 8AM to 4 PM, 4 PM to 12 AM & 12 AM to 8 AM) as per given "Terms & Conditions" at main Building, Murshidabad Medical College & Hospital, Murshidabad( Charges for overhead, Supervision administrative cost, bonus,ESI &PF etc). | 3 | Shift | 23,500 ₹8,46,000 Lowest | 24,500 ₹8,82,000 | 26,000 ₹9,36,000 |
| 2.00N.B: Rate inclusive of all Taxes | ||||||
| 3.00TERMS & CONDITIONS | ||||||
| 3.011. The contractor has to depute 02 No. Lift Operator (Semi-Skilled ) cum attendant in 01 Shift for 2 Nos. Lifts for 8 hours from 9:00 a.m. to 5:00 p.m. The contractor has to provide suitable substitutes for those on leave and as & when required as per requirement of the authority & timing of functioning of the authority throughout the year having a sound knowledge for operation functioning of the list satisfactory with Valid Lift Attendant’s Authorisation duly issued by the Licenceing Board, Government of West Bengal. | ||||||
| 3.022. The Agency will have to submit the list of working Lift operator with reliever /substitutes to be engaged for the ensuring proper functioning /operation of lift installation mentioning their name & contact number No. category along with valid Authorisation Letter duly issued by the Licensing Board & identity proof and all these information with supporting documents are to be submitted in written to the concerned Junior Engineer (Electrical), Assistant Engineer (Electrical) & Executive Engineer (Electrical) prior to take up the work. This should be treated as mandatory. | ||||||
| 3.033. The Lift Operator/Attendant should be dutiful and polite to all he has to keep watch on the lift for any difficulties. | ||||||
| 3.044. The report is to be submitted periodically about the condition of the lift & all of its accessories with safety devices to the concerned Assistant Engineer (Electrical) & Junior Engineer (Electrical) with copy to the Executive Engineer (Electrical). | ||||||
| 3.055. The Lift enclosure should be kept clean regularly by the Lift Operator | ||||||
| 3.066. Penalty maybe imposed for non-operation of the lift in time as well as for absence of the operational staff the decision of the Executive Engineer (Electrical) will be final in this respect. | ||||||
| 3.077. The agency should be responsible for any damage to the lift due to mishandling/ mal-operation done by his staff and shall be liable for the compensation for the same which would be recovered from the bill as per assessment & direction of E.I.C and the accused staff should be replaced immediately | ||||||
Tender Value
Refer Docs
EMD Value
₹16,929
Closing Date
10 Aug 2026, 12:00 pmClosed
EXECUTIVE ENGINEER
GOVERNMENT OF WEST BENGALOFFICE OF THE EXECUTIVE ENGINEER, MURSHIDABAD ELECTRICAL DIVISION, PWD184, C. R. DAS ROAD,BERHAMPORE, MURSHIDABAD, W.B-742101
Engagement of Lift attendent for 01 (one) No Lift near ICU at Main Building of Murshidabad Medical College and Hospital.
2026_WBPWD_5017718_1
WBPWD/EE/MsdED/86/e-Q OF 2026-27
Open Tender
Miscellaneous Works
Item Rate
365 days
Murshidabad
Please refer Tender documents.
5 documents required · 5 mandatory
₹16,929
22 Aug 2026
31 Jul 2026
12 Aug 2026
31 Jul 2026
10 Aug 2026
3 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Charges for providing 03 no semi skilled lift attendant for 1(one) No Lift (3 shift, i.e 8AM to 4 PM, 4 PM to 12 AM & 12 AM to 8 AM) as per given "Terms & Conditions" at main Building, Murshidabad Medical College & Hospital, Murshidabad( Charges for overhead, Supervision administrative cost, bonus,ESI &PF etc). | 3 | Shift | - | - |
| 2N.B: Rate inclusive of all Taxes | |||||
| 3TERMS & CONDITIONS | |||||
| 3.01 | 1. The contractor has to depute 02 No. Lift Operator (Semi-Skilled ) cum attendant in 01 Shift for 2 Nos. Lifts for 8 hours from 9:00 a.m. to 5:00 p.m. The contractor has to provide suitable substitutes for those on leave and as & when required as per requirement of the authority & timing of functioning of the authority throughout the year having a sound knowledge for operation functioning of the list satisfactory with Valid Lift Attendant’s Authorisation duly issued by the Licenceing Board, Government of West Bengal. | - | - | - | - |
| 3.02 | 2. The Agency will have to submit the list of working Lift operator with reliever /substitutes to be engaged for the ensuring proper functioning /operation of lift installation mentioning their name & contact number No. category along with valid Authorisation Letter duly issued by the Licensing Board & identity proof and all these information with supporting documents are to be submitted in written to the concerned Junior Engineer (Electrical), Assistant Engineer (Electrical) & Executive Engineer (Electrical) prior to take up the work. This should be treated as mandatory. | - | - | - | - |
| 3.03 | 3. The Lift Operator/Attendant should be dutiful and polite to all he has to keep watch on the lift for any difficulties. | - | - | - | - |
| 3.04 | 4. The report is to be submitted periodically about the condition of the lift & all of its accessories with safety devices to the concerned Assistant Engineer (Electrical) & Junior Engineer (Electrical) with copy to the Executive Engineer (Electrical). | - | - | - | - |
| 3.05 | 5. The Lift enclosure should be kept clean regularly by the Lift Operator | - | - | - | - |
| 3.06 | 6. Penalty maybe imposed for non-operation of the lift in time as well as for absence of the operational staff the decision of the Executive Engineer (Electrical) will be final in this respect. | - | - | - | - |
| 3.07 | 7. The agency should be responsible for any damage to the lift due to mishandling/ mal-operation done by his staff and shall be liable for the compensation for the same which would be recovered from the bill as per assessment & direction of E.I.C and the accused staff should be replaced immediately | - | - | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.24 MB
Tendernotice_2.pdf
PDF • 0.55 MB
BOQ_5088085.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .