Loading…
Loading…
Tender Value
₹86.0 L
EMD Value
₹1.7 L
Closing Date
12 Oct 2026, 6:00 pm
O/O the Regional Director SF Department Jammu
O/O the Regional Director SF Department Jammu
01 Construction of Mesh Wire Chain link Fencing 1822 Rft 02 Construction of Main gate 03 Formation of nursery beds 04 Automated mist chamber house 05 Construction of naturally ventilated poly green house 06 Genset room 07 Construction of mali hu
2026_FD_325607_1
E-NIT 03 of 2026-27 Dated 22.09.2026
Open Tender
Agricultural or Forestry
Percentage
120 days
Office of Social Forestry Division Poonc
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
Yes
Director SFD JK UT Civil Secretariat JK
₹1.7 L
Yes
22 Sept 2026
22 Sept 2026
13 Oct 2026
22 Sept 2026
12 Oct 2026
22 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | (CHAINLING FENCING) Clearing jungle including uprooting of rank vegetation,grass,brush wood,trees and saplings upto girth of 30 cms measured at aheight of 1 m above ground level and removal of rubbish upto a distance of 50m outside the periphery of area cleared. | 203.2 | sqm | 12.49 | ₹2,537.97 |
| 2 | Excavation work in excavation by manual means for foundations, drains, pipes, cables etc. (not exceeding 1.5m in width) and for shafts wells cesspits and the like not exceeding 10 sqm on plan, depth upto 1.5 M including the disposal of excavated earth upto 1 M from the cutting edge, disposed earth to be levelled and neatly dressed in all kinds of soil. | 73.03 | Cum | 479.3 | ₹35,003.28 |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering- All work upto plinth level. 1:5:10 (1 cement: 5 coarse sand :10 graded stone aggregate 40mm nominal size) Crushed | 13.63 | Cum | 4,286.5 | ₹58,425 |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering- All work upto plinth level. 1:2:4 (1 cement: 2 coarse sand :4 graded stone aggregate 40mm nominal size) Crushed | 45 | Cum | 6,591.25 | ₹2,96,606.25 |
| 5 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering- All work upto plinth level. 1:3:6 (1 cement: 2 coarse sand :4 graded stone aggregate 20mm nominal size) Crushed | 52.97 | Cum | 5,733.6 | ₹3,03,708.79 |
| 6 | Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns | 758.92 | Sqm | 286.3 | ₹2,17,278.8 |
| 7 | Structural steel work in built up sections, trusses and framed work,
including cutting, hoisting, fixing in position and applying a priming coat of
approved steel primer all complete.
Welded | 6,666.74 | Kgs | 138.2 | ₹9,21,343.47 |
| 8 | Providing and fixing G.I chain link Fabric Fencing of required width in mesh size 50x50mm including strength with 2mm dia wire or nut, bolts and washers as required on angle iron complete as per direction of engineer -in - charge made of G.I wire of dia 4mm | 1,012.64 | Sqm | 903.25 | ₹9,14,667.08 |
| 9 | Painting with ready mixed synthetic enamel paint of approved brand and manufacture in all shades to give an even shade on new steel works. | 384.8 | Sqm | 131.85 | ₹50,735.88 |
| 10 | carriage of material Sand M.T 30km HL 100M | 50.22 | cum | 764.7 | ₹38,403.23 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.22 MB
BOQ_1100640.xls
BOQ • 0.53 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .