Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹9.1 LAccepted-AOC AT PO TALBANI CITY PASCHIM MEDINIPUR STATE WEST BENGAL PIN 721156 | PASCHIM MEDINIPUR | PASCHIM MEDINIPUR | WEST BENGAL | 721156 | ₹9.1 L Quoted ₹7.8 L | L-1 | Accepted-AOC BEING L-1 |
| 2 | L-2₹9.9 LRejected-Finance AT BALINGA BANKIBAHAL BANKIBAHAL BASUNDHARA AREA DIST SUNDERGARH PIN 770076 | SUNDARGARH | ODISHA | 770076 | ₹9.9 L | L-2 | Rejected-Finance NOT BEING L-1 |
Updated dates
Tender Value
₹12.9 L
EMD Value
₹16,100
Closing Date
10 Apr 2026, 5:00 pmClosed
PROJECT ENGINEER CIVIL GARJANBAHAL OCP BASUNDHARA
PROJECT OFFICER PO OFFICE, GARJANBAHAL OCP, BASUND
Temporary extension of conference hall at MTK Office premises under GOCP of Basundhara Area
2026_MCL_357531_1
MCL/BA/PO/GOCP/Civil/E-Tender/ 25-26/39 dtd 25/03/2026
Open Tender
Civil Works - Others
45 days
PROJECT OFFICER PO OFFICE, GARJANBAHAL OCP, BASUND
AS PER NIT
3 documents required · 3 mandatory
₹16,100
14 May 2026
26 Mar 2026
13 Apr 2026
26 Mar 2026
10 Apr 2026
26 Mar 2026
26 Mar 2026 - 30 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge.In cement mortar | - | cum | - | - | BI01010001010000000000000515BI0100001119 | |
Dismantling tile work in floors and roofs laid in cement mortar including stacking material within 50 metres lead.For thickness of tiles 10 mm to 25 mm | - | sqm | - | - | BI01010001010000000000000515BI0100001120 | |
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.:All kinds of soil. | - | cum | - | - | BI01010001010000000000000515BI0100001121 | |
Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete. | - | cum | - | - | BI01010001010000000000000515BI0100001122 | |
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources). | - | cum | - | - | BI01010001010000000000000515BI0100001123 | |
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources: 6 graded stone aggregate 40 mm nominal size derived from natural sources). | - | cum | - | - | BI01010001010000000000000515BI0100001124 | |
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, ifnishing and reinforcement- All work up to plinth level :1:1.5:3 (1 cement: 1.5 coarse sand (zone-III) derived from natural sources: 3 graded stone aggregate 20 mm nominal size derived from natural sources). | - | cum | - | - | BI01010001010000000000000515BI0100001125 | |
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.Thermo-Mechanically Treated bars of grade Fe-500D or more. | - | kg | - | - | BI01010001010000000000000515BI0100001126 | |
Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources). | - | cum | - | - | BI01010001010000000000000515BI0100001127 | |
Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement, with 1:1.5:3 (1 cement: 1.5 coarse sand (zone-III)derived from natural sources: 3 graded stone aggregate 20 mm nominal size derived from natural sources). | - | cum | - | - | BI01010001010000000000000515BI0100001128 |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.99 MB
Tendernotice_2.pdf
PDF • 2.36 MB
Tendernotice_3.pdf
PDF • 1.53 MB
BOQ_370395.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid