Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Tender Updates
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.7 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹1.7 L+₹4,300 (2.55%)Rejected-AOC MOHALLA DESHNAGAR PILIBHIT | PILIBHIT | PILIBHIT | UTTAR PRADESH | L2 | Rejected-AOC L2 | |
| 3 | L3₹1.8 L+₹8,475 (5.03%)Rejected-AOC | L3 | Rejected-AOC L3 |
Tender Value
₹1.9 L
EMD Value
₹1,850
Closing Date
23 Aug 2023, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE EUDC
35-B RAMPUR GARDEN BAREILLY
DEPOSIT WORK UNDER EUDD-III BAREILLY
2023_MVVNL_824083_3
T-68/EUDCB/2023-24
Open Tender
Electrical Works
Item Rate
30 days
EE EUDD-III BAREILLY
AS PER TENDER FORM
3 documents required · 3 mandatory
₹1,180
SE EUDC
₹1,850
23 Sept 2023
16 Aug 2023
24 Aug 2023
16 Aug 2023
23 Aug 2023
16 Aug 2023
Amount
For the work of Load Extenstion from 40 HP to 66 HP of Shri Gaurav Agarwal S/o Subash Kumar Agarwal ,235 Gopal Udyhog Madhowari under full deposit fund 2023-24 under EUDD-III, Bareilly.
Safe Carriage of Following materials from Central C.B. Ganj to work site including loading & unloading.
ST Pole 11 meter Long
11 KV XLPE Cable (3x70 sqmm)
Cable Jointing Kits O/D (3X70 sqmm)
New 100 KVA T/F
other associated materials
Erection Work
Erection of ST D/P including digging of pit & grouting work complete and fitting of all accessories complete.
Laying of 11 KV XLPE Vable (3x70 sqmm)
Hoisting of. 60 meter 11 KV XLPE Cable on D/Poles situated at both side of road including cost of 12 meter 6 inch dia G.I Pipe (Material will be supplied by Contractor).
Fixing of Cable Jointing KitsO/D (3X70 SQMM)
Earthing of Pole by MS Earthing rod (20x2500mm) and 6 swg earthing wire
Erection of Stay Set Complete .
Chemical Erathing of 100 KVA T/F Body & Neutral
Mounting of 100 KVA T/F along with making all connections.
Fixing of associated Items i.e. 11 KV Pin Insulator with Pin-063,Nos, Top Channel-02, S/s Base Angle-02, Etc
For the Work of Giving New 54 KVA To Shri Mayank Kumar Agarwal , S/o Shri Vitrendra Kumar Agarwal , B-14 Rajendra Nagar , Bareilly full deposit fund 2023-24 under EUDD-III, Bareilly.
Safe Carriage of Following materials from Central C.B. Ganj to work site including loading & unloading
ST Pole 11 meter Long
New 63 KVA T/F
11 KV XLPE Cable (3x70 sqmm)
Cable Jointing Kits O/D (3X70 sqmm)
other associated materials
Erection Work
Erection of ST D/P including digging of pit & grouting work complete and fitting of all accessories complete.
Laying of 11 KV XLPE Vable (3x70 sqmm)
Hoisting of. 60 meter 11 KV XLPE Cable on D/Poles situated at both side
Earthing of Pole by MS Earthing rod (20x2500mm) and 6 swg earthing wire
Fixing of Cable Jointing KitsO/D (3X70 SQMM)
Mounting of 63 KVA T/F along with making all connections.
Fixing of associated Items i.e. 11 KV Pin Insulator with Pin-06,Nos, Top Channel-02, S/s Base Angle -02 No.s.. Etc
POWER AND POWER CONSULTANTS
JOSHI ELECTRICALS
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .