Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹13.6 LAccepted-AOC KERALA KL KERALA | L1 | Accepted-AOC L1 | |
| 2 | L2₹13.7 L+₹12,451.62 (0.92%)Rejected-AOC KERALA KL KERALA | L2 | Rejected-AOC L2 | |
| 3 | L3₹14.7 L+₹1.1 L (8.41%)Rejected-AOC ARUNODAYAM H KAYANNA BAZAR PO 673525 | KOZHIKODE | KERALA | 673525 | L3 | Rejected-AOC L3 | |
| 4 | L4₹15.6 L+₹2.0 L (14.9%)Rejected-AOC | L4 | Rejected-AOC L4 |
Tender Value
₹17.8 L
EMD Value
₹44,437
Closing Date
25 Apr 2023, 6:55 pmClosed
Executive Engineer,KyIP Division,Perambra
Executive Engineer,KyIP Division,Perambra
Rectification of canal
2023_Irrig_571590_1
EE/KyIP/03/2023-24
Open Tender
Civil Works - Canal
Item Rate
180 days
Palliyath
7 documents required · 7 mandatory
₹2,760
Yes
₹44,437
Yes
15 Jun 2023
12 Apr 2023
27 Apr 2023
12 Apr 2023
25 Apr 2023
12 Apr 2023
12 Apr 2023 - 25 Apr 2023
Amount
CANAL LINING
2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size)
4.3.2:Centering and shuttering including strutting, propping etc. and removal of form work for:Retaining walls, return walls, (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc.
4.1.5:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)
4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size)
13.16.1:6 mm cement plaster of mix:1:3 ( 1 cement : 3 fine sand)
2.25:Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m.
JOSEPH SEBASTIAN
CHANDRAN.C.H
Sakthi Labour Contract Co-operative Society Limited
Bidder Name
VK BALAN
CHANDRAN.C.H
Sakthi Labour Contract Co-operative Society Limited
JOSEPH SEBASTIAN
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_843810.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .