| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹58.9 LAdmitted-Finance KHASRA NO 399 MANGLOR KUMRADI ROORKEE HARIDWAR | HARIDWAR | UTTARAKHAND | 247656 | -0.21% | ₹58.9 L | L1 | Admitted-Finance |
| 2 | L2₹59.1 LAdmitted-Finance 01 VIDYA VIHAR PHASE I KARGI ROAD DEHRADUN | DEHRADUN | UTTARAKHAND | 248001 | +0.01% | ₹59.1 L | L2 | Admitted-Finance |
| 3 | L3₹59.4 LAdmitted-Finance 0 TAWOR ROAD GALI NO 3 NDC MURADNAGAR GHAZIABAD UTTAR PRADESH 201206 | GHAZIABAD | UTTAR PRADESH | 201206 | +0.50% | ₹59.4 L | L3 | Admitted-Finance |
| 4 | L4₹59.7 LAdmitted-Finance | +1.00% | ₹59.7 L | L4 | Admitted-Finance |
Tender Value
₹59.1 L
EMD Value
₹1.2 L
Closing Date
8 May 2026, 2:00 pmClosed
Superintending Engineer
Electricity Civil Circle (Dehradun)
Construction of Boundary wall and Land Development Works at 33/11 KV S/S Kaniya, Ramnagar.
2026_UPCL8_94956_1
ECC-08/2026-27
Open Tender
Civil Works
180 days
As per Tender
Please refer Tender documents.
3 documents required · 3 mandatory
₹5,900
E.E, ECCD Dehradun
₹1.2 L
8 May 2026
2 May 2026
8 May 2026
2 May 2026
8 May 2026
3 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1CIVIL WORKS | |||||
| 0.999 | Earth work in excavation by mechanical means (Hydraulic excavator ) manual means in foundation tranches (not exceeding 1.5m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift up to 1.5m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50m. (All kinds of soil). | 558.87 | cum | 253.27 | ₹1,41,545 |
| 0.000 | Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth upto 30 cm measured at a height of 1m above ground level and removal of rubbish upto a distance of 50 m outside the periphery of the area cleared | 588 | sqm | 17.12 | ₹10,066.56 |
| 0.999 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:1½:3 (1 Cement: 1½ coarse sand (zone-III) : 3 graded stone aggregate 20 mm nominal size) | 2 | cum | 8,115.65 | ₹16,231.3 |
| 0.000 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering -All work up to plinth level:1:4 :8 (1 Cement :4 coarse sand: 8 graded stone aggregate 40 mm nominal size) | 39.7 | cum | 6,628.08 | ₹2,63,134.78 |
| 0.999 | Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centering, shuttering, finishing and reinforcement- All work up to plinth level:1:1.5:3 (1 cement : 1.5 coarse sand (zone-III): 3 graded stone aggregate 20 mm nominal size) | 95.26 | cum | 8,801.51 | ₹8,38,431.84 |
| 0.000 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, Columns, pillars, piers, abutments, posts and struts etc. up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement : 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) | 26.77 | cum | 10,559.92 | ₹2,82,657.38 |
| 0.999 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mm nominal size). | 10.64 | cum | 11,194.85 | ₹1,19,113.2 |
| 0.000 | Centering and shuttering including strutting propping etc. and removal of form for: Lintels, beams, plinth beams girders, bressumers and cantilevers, | 170 | sqm | 716.52 | ₹1,21,808.4 |
| 0.999 | Centering and shuttering including strutting propping etc. and removal of form for:. Columns, Pillars, Piers, Abutments, Posts and Struts. | 308.95 | sqm | 935.34 | ₹2,88,973.29 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.22 MB
TC.pdf
Tender Documents • 0.28 MB
BOQ_112311.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid