Tender Value
₹62.9 L
EMD Value
₹1.3 L
Closing Date
29 Sept 2026, 3:00 pm2d left
Executive Engineer,PWD(R and B),Kamalpur Division
O/o. EE, PWD(R and B), Kamalpur Division
Renovation of Kamalpur Sub-Jail Quarters, Kamalpur, Dhalai, Tripura during the year 2024-25.
2026_CEPWD_77064_1
41/DNIT/SE-V/AMB/2026-27
Open Tender
Civil Works - Building
Percentage
Kamalpur
Please refer Tender documents.
5 documents required · 5 mandatory
₹4,000
₹1.3 L
Yes
22 Sept 2026
22 Sept 2026
29 Sept 2026
22 Sept 2026
29 Sept 2026
23 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolishing cement concrete manually / by mechanical means including disposal of material with all lifts and upto 50 m lead etc. complete as per direction of the Engineer- in-charge:-
Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix) | 286.4 | Cum | 1,436 | ₹4,11,270.4 |
| 2 | Demolishing brick work including stacking of
serviceable materials and disposal of unserviceable materials with all lifts and upto a lead of 50m etc. complete as per direction of the Engineer- in-charge:-
In cement mortar. | 10 | Cum | 1,145.4 | ₹11,454 |
| 3 | Dismantling doors, windows and clerestory windows (steel or wood) shutter including chowkhats, architrave, holdfasts etc. complete and stacking within 50 metres lead
Of area beyond 3 sqm.. | 72 | Each | 293.7 | ₹21,146.4 |
| 4 | Taking out doors, windows and clerestory window shutters (steel or wood) including stacking within 50 metres lead :
Of area beyond 3 sqm. | 72 | Each | 112.9 | ₹8,128.8 |
| 5 | Dismantling steel work in built up section in
channels, angles, tees, flats including all gusset plates, bolts, nuts, cutting rivets, welding including dismembering and stacking of serviceable materials and unserviceable materials separately with all lifts and upto a lead of 50 m etc. complete as per direction of the Engineer- in-charge. | 100 | Kg | 3.1 | ₹310 |
| 6 | Dismantling old plaster or pointing, raking out joints, cleaning and preparing the surface for re-plastering or re-pointing including disposal of rubbish to the dumping ground with all leads and lifts etc.complete as per direction of the Engineer- in-charge. | 2,047.5 | Sqm | 30.1 | ₹61,629.87 |
| 7 | Dismantling of flushing cistern of all types
(C.I./PVC/Vitrious China) including stacking of
useful materials near the site and disposal of
unserviceable materials within 50 metres lead. | 8 | Each | 474 | ₹3,792 |
| 8Dismantling G.I. pipes (external work) including excavation and refilling trenches after taking out the pipes, manually/ by mechanical means including stacking of pipes within 50 metres lead as per direction of Engineer-in-charge : | |||||
| 8.1 | 15 mm to 40 mm nominal bore | 320 | Metre | 75.6 | ₹24,192 |
| 8.2 | Above 40 mm nominal bore | 160 | Metre | 91.7 | ₹14,672 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.26 MB
BOQ_78444.xls
BOQ • 0.41 MB
tenderdocument.pdf
Tender Documents • 2.19 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .