Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹3.5 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹3.5 L+₹699.99 (0.20%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | ||
| 3 | Not Admitted-Fee/PreQual/Technical/Finance | - | Not Admitted-Fee/PreQual/Technical/Finance Others-(Invalid Affidavit) |
Tender Value
₹3.5 L
EMD Value
₹7,000
Closing Date
24 Aug 2026, 6:00 pmClosed
EXEN REW BARAMULLA
EXEN REW BARAMULLA
C/o p wall and improvement of playground in high secondry school sultandaki under ADP(DDC) 2026-27 pyt halqa Sultandaki Block Parenpeelan
2026_RDPR_319161_2
178/Xen/Rew/Bla/2026-27 Dated 03/08/2026
Open Tender
Civil Works
Percentage
30 days
BARAMULLA
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
Rural Development and Panchayati Raj
₹7,000
3 Sept 2026
3 Aug 2026
25 Aug 2026
3 Aug 2026
24 Aug 2026
3 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil | 52.36 | cum | 1 | ₹52.31 |
| 2 | random Rubble masonary using hard stones in cement concrete 1:6:12 with hard stone in foundation and plinth including leveling up & curing. | 19.66 | cum | - | - |
| 3 | Random Rubble masonary in dry using hard stones in foundation and plinth including leveling up & curing | 33.66 | cum | - | - |
| 4 | P/L damp proof course in 1:2:4 mix | 25.65 | sqm | 1 | ₹25.62 |
| 5 | P/L dry stone soling h/p | 15.5 | cum | - | - |
| 6 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level | 14.53 | cum | - | - |
| 7 | chequrred precast cement concrete tiles 22mm thick im footpath and courtyard joined with neet cement slury mixed with pigment to match the shade of the tile including rubbing, cleaning and curing complete on 20mm thick bed of cement mortr 1:4 | 72.49 | sqm | - | - |
| 8 | carriage of sand bajri by MT 65 KM and H/L | 4.49 | cum | - | - |
| 9 | photographs & signboard | - | Job | - | - |
stage.html
html • 0.02 MB
finance_1055985.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.14 MB
BOQ_1055985.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .