Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical 101 VRAJ APARTMENT OPP POLICE HEAD QUARTERS SARU SECTION ROAD JAMNAGAR 381008 | JAMNAGAR | 381008 | Admitted-Fee/PreQual/Technical |
| 2 | Admitted-Fee/PreQual/Technical B 403 BHARTI VIHAR S NO 78 BHARTI VIDYAPITH CAMPUS KATRAJ PUNE PUNE MAHARASHTRA 411046 | PUNE | MAHARASHTRA | 411046 | Admitted-Fee/PreQual/Technical |
| 3 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 4 | Admitted-Fee/PreQual/Technical 46 TIT ROAD TIT ROAD RATLAM MADHYA PRADESH 457001 | RATLAM | MADHYA PRADESH | 457001 | Admitted-Fee/PreQual/Technical |
Tender Value
₹6 L
EMD Value
₹12,000
Closing Date
2 May 2026, 6:00 pmClosed
GE (AF) Chiloda
GE (AF) Chiloda, LekawadaPatia, PO CRPF Campus, Gandhinagar (Gujarat)-382042
PERIODICAL ENERGY AUDIT OF POWER SUPPLY AT AREA A ,C AND AREA B AT AF STN WADSAR
2026_MES_751309_3
8377/25-26/E8
Open Tender
Electrical and Maintenance Works
Item Rate
120 days
WADSAR
As per Tender Documents
7 documents required · 7 mandatory
₹500
GE (AF) CHILODA
₹12,000
Yes
27 Apr 2026
11 Apr 2026
4 May 2026
11 Apr 2026
2 May 2026
19 Apr 2026
11 Apr 2026 - 18 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| - | Deployment of man power, instrument, tools and all connected accessories for carry out load survey for a period of 24 hrs at the MRS/incoming panels/VCBs/RMUs at various electrical installation at Area 'A' & 'C' to carry out electrical analysis of HT and LT of Transformer. This incl checking the efficiency of transformer, its loading pattern, PF, THD, best efficiency point of existing losses in the system. Providing suggestions to achieve energy efficiency and energy saving of system this incl all distribution Transformers of Stn complete all as specified and directed by Engr-in-Charge.
(a) Tranformer - 14 No's
(b) DG Set - 10 No's
(c) Voltage stabilizer - 08 No's
(d) APFC Panel - 07 No's
(e) Water Supply Instalation - 03 No's
(f) Pump & Motor - 08 No's
(g) RMU - 09 No's
(h) VCB - 03 No's | - | Each Job | - | - |
| - | Deployment of man power, instrument, tools and all connected accessories for carry out load survey for a period of 24 hrs at the MRS/incoming panels/VCBs/RMUs at various electrical installation at Area 'B' to carry out electrical analysis of HT and LT of Transformer. This incl checking the efficiency of transformer, its loading pattern, PF, THD, best efficiency point of existing losses in the system. Providing suggestions to achieve energy efficiency and energy saving of system this incl all distribution Transformers of Stn complete all as specified and directed by Engr-in-Charge.
(a) Tranformer - 7 No's
(b) DG Set - 6 No's
(c) Voltage stabilizer - 05 No's
(d) APFC Panel - 05 No's
(e) Water Supply Instalation - 01 No's
(f) Pump & Motor - 06 No's
(g) RMU - 05 No's
(h) VCB - 02 No's
Notes for Item Ser No 1 & 2 above : Contractor is advised to visit the stn before quoting the tender to get a proper idea about the prevailing site condition and to get a proper idea of scope pf work. It is requested to go through the PS Clause at page No 86 to 94 | - | Each Job | - | - |
stage.html
html • 0.02 MB
tech_bid_open.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.40 MB
BOQ_851396.xls
BOQ • 0.48 MB
Retender.pdf
Tender Documents • 0.97 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .