Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Tender Value
Refer Docs
Closing Date
12 Sept 2024, 5:30 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Barrackpore Division
HINDUSTAN AERONAUTICS LIMITED Barrackpore Division Barrackpore Post Parganas (N) , Dist. 24 W. Bengal - 700 120 Phone : 2592-0157/2592-0163 Fax No : 91-033-2592-2379
SURFACE TREATMENT OF SPARE PARTS 6 TYPES
9333
HAL/BKP/SC/2024-25/98221365/3
Works
Helicopter Complex -Barrackpore Divn
₹0
Exempted
12 Sept 2024
22 Aug 2024
22 Aug 2024
12 Sept 2024
Name of Sub-Contractor:
Tender No. : HAL/BKP/SC/2024-25/98221365/3
Quotation No. : Date(DD-MM-YYYY)
Sl. No. Part No. Part Description Remarks Qty. (Nos.) Unit Rate (in Rs.) Total Value (in Rs.)
1 3130-28-01-031-P COVER STRIP 1-5 micron as per HPS 201 TYPE 1 FINISH 1 - HOT WATER SEAL TO BE CARRIED OUT AS PER ATTACHED DRAWING AND MPS 80 0.00
2 3130-73-17-102-P PIN 8-13 micron ( upto 25 micron) as per HPS 201 TYPE 2 PREFERABLY FINISH 1 -HOT WATER SEAL TO BE CARRIED OUT AS PER ATTACHED DRAWING AND MPS 100 0.00
3 3130-28-02-031-P COVER STRIP 1-5 micron as per HPS 201 TYPE 1 FINISH 1 - HOT WATER SEAL TO BE CARRIED OUT AS PER ATTACHED DRAWING AND MPS 80 0.00
4 11224CE0002-P PRESSURE CONNECTOR 1-5 micron as per HPS 201 TYPE 1 FINISH 1 - HOT WATER SEAL TO BE CARRIED OUT AS PER ATTACHED DRAWING AND MPS 150 0.00
5 11224KB0001-P PRESSURE CONNECTOR 8-13 micron ( upto 25 micron) as per HPS 201 TYPE 2 HOT WATER SEAL TO BE CARRIED OUT AS PER ATTACHED DRAWING AND MPS 105 0.00
6 3130-25-04-402-P SHIM 8-13 micron ( upto 25 micron) as per HPS 201 TYPE 2 PREFERABLY FINISH 1-HOT WATER SEAL TO BE CARRIED OUT AS PER ATTACHED DRAWING AND MPS 150 0.00
Total value in Words (Rs):
Packing & Forwarding if any (%)
HSN/SAC Code as applicable
GST as applicable (%)
Others (to be specified below) (%)
Supplier to send a bank details duly verified by bank. If it is submitted earlier, then only bank details to be mentioned. BANK DETAILS (Name & address of the Bank, Account No., IFSC code & type of A/c)
Additional Clause (If any):
Note: 1. Surface Treatment operations as per Drawings & Master Process Sheet (MPS) to be carried out on machined parts supplied by HAL Barrackpore. 2. Subcontractors are required to fill the fields in the Yellow coloured cells only in the price bid format. Columns containing Sl.no., Part No.,Part Description,Remarks & Qty. are not to be altered/corrected. 3. Price bid is to be uploaded strictly in the Price bid format as per the above EXCEL sheet. Offer made deviating the price bid format will be liable for rejection. 4. In case additional conditions are required, the same will be enclosed separately.
ACCEPTANCE OF TERMS & CONDITIONS
Name of Sub-Contractor:
Tender No. HAL/BKP/SC/2024-25/98221365/3
Sl. No Parameters GENERAL TERMS AND CONDITIONS Acceptable Yes / No If No, Reason for Non acceptance
1 Price a) Quotation should be on F.O.R. basis to H.A.L. Barrackpore Division, Barrackpore including Packing & forwarding/ Freight up to delivery to Barrackpore Division stores.
b) Sub-contractor has to quote for protective finishing operations like chromic acid anodising and sulphuric acid anodising mentioned in Master Process Sheet / Drawings to be carried out on fabricated spares. The quotation submitted should be considering cost of consumables, labour, transportation, special tool etc. required to carry out the protective finishing operations.
c) Prices quoted should be inclusive of all taxes and statuary duties.Taxes, Duties OR any other Government levies should be clearly indicated separately. We do not issue Form ‘C’ / Form ‘D’ / Form 37, Bidder should invariably indicate the rate at which these are payable otherwise price quoted shall be considered to be inclusive of all the above elements. Any claim on the above by bidder subsequent to placement of order will not be entertained. If these elements appear in the quotation and there is revision in statutory levies, the same will be honored with respect to acknowledged delivery schedule.
2 First Article Inspection (FAI) First article inspection requirement is to be met as per AFQMS, issue - II/AS9100D standard/CQAG 9002/AS9102 requirements. The requirements are as follows: 1) First article inspection shall be carried out by the subcontractor on the first production run of a part to verify that the production processes, production documentation and tooling are capable of producing parts that meet requirements. The process shall be repeated when changes occur that invalidate the original results (e.g. engineering changes, process changes, change of location, tooling changes). 2) The subcontractor shall maintain a first article inspection file for each part surface treated and the file shall contain the following: (i) Balloon marked identification (KPI) for each characteristics specified in the drawing. (ii) Dimensional inspection report as per Annexure – VII of CQAG 9002.
3 Delivery Schedule This is our two years requirement. Items will be given to Sub-contractor based on PO placed on staggered basis as per HAL Barrackpore requirement. After Protective finishing, Items to be returned by the Sub-contractor within 4 weeks from the date of receipt of items on which protective finishing to be done on their end. The batch sizes will be depending on HAL production plan.
4 Payment term 100% payment on acceptance of components & finalization of Receiving Report at HAL BKP Stores.
5 Validity of offer The offers should be kept valid for our acceptance in all respects for a minimum period of 120 days from the date of opening of Tenders.
6 Issue of items without protective finishing Items without protective finishing will be issued by HAL Barrackpore Division Stores as Free Issue Material (FIM). It will be issued after submission of Indemnity Bond by the Sub-Contractor.
7 Packing, Forwarding and Transportation a) All parts (finished/Semifinished) should be properly packed in separate bubble sheet / shock proof packaging and to be forwarded to HAL in a reliable transport mode to avoid damage during transit.
b) Sending Items without protective finishing to Sub-Contractor is HAL responsibility at HAL cost whereas sending finished items after protective finishing to HAL will be Sub-Contractor's responsibility at their own cost by Air/Courier/personel mode.
8 Consumables Price to be quoted inclusive of the cost of all type of consumable, required for protective finishing operations like chromic acid anodising and sulphuric aid anodising as per Process Sheet.
9 Technical requirements & process approval The protective finishing operations like chromic acid anodising and sulphuric acid anodising as per Process Sheet, must be approved by HAL or DGAQA (Director General of Airworthiness Quality Assurance) or NADCAP for chemical processing and confirm the same in your Quotation, failing which your quotation may liable for rejection. In cases , where facilities for the designated special processes as per tender are available with the vendor but without any approval, the faclities will be vetted by HAL Barrackpore QC dept in the technical evaluation stage and accorded approval prior to placement of order.
10 Undertaking with supplies Sub-Contractor has to submit an undertaking along with all supplies stating that "Item Part No .........................., Part Name ................, Qty..........., protective finishing done on the items supplied by HAL Barrackpore division vide DA No ........... Dated ...............If any failure/discrepancy occurs in future due to mismatch of material / failue in protective finishing, we will be fully responsible for that and HAL will have full discretion/authority to take any appropriate action against us".
11 Preservation of HAL items & drawings a) All material received from HAL shall be properly identified with the order number, specification and quantity. These shall be protected from misuse, loss, damages and deterioration, properly stored with preservative at suitably identified and marked place.
b) HAL supplied material, drawings, process Sheets and other documents are sole property of Barrackpore Division and needs to be preserved till the completion of purchase order and to be returned to HAL Barrackpore Division after completion of order.
12 Quality / Inspection a) Barrackpore components are all airborne items that involve life critical/flight safety components.Airworthiness of these parts are utmost important and hence Sub-Contractor should have quality assurance system procedure in line with HAL QA.
b) Sub-Contractor shall carry out detailed inspection on all these parts and offer to HAL inspection for clearance and acceptance. Sub-Contractor must submit work done report, process sheet endorsed with all columns filled with complete details along with the item.
c) Sub-Contractor shall submit duly filled and signed Process Sheet along with each supplies. The Process sheet has to be prepared in accordance with HAL provided MPS by the Sub-Contractor and approved by HAL-Methods Engineering department.
d) Pre-dispatch inspection will be done by HAL QA inside Sub-Contractor's premises if required. The report furnished by HAL Barrackpore Division Inspector will be final and binding on Sub-Contractor. The Sub-Contractor shall provide inspection facilities free of charge. The intimation regarding readiness of items should be given by the Sub-Contractor in writing seven days in advance in order to enable HAL Barrackpore Division to depute inspector to carry out inspection. Final inspection & acceptance of components will be carried out in HAL’s premises.
13 Rejection allowance The permissible rejection allowance is 5% (or rounded to next higher whole number) of the PO quantity. HAL shall recover the cost of material rejected in case the rejection exceeds the permissible limit. All rejections are to be supplied back to HAL without fail. In case of return of supplied items back to Sub-Contractors due to deviation, to and fro charges to be borne by Sub-Contractor.
14 Liquidated damages Liquidated damages will be applicable in case of delayed supplies @ 0.5% per week (or part thereof) of the value of items so delayed subject to maximum of 5% of such delayed supplies.
15 Indemnity Bond Indemnity Bond equivalent to the cost of raw materials lying at any point of time at Sub-Contractor’s premises need to be submitted within 30 days after receipt of Order. The indemnity bond shall be provided in stamp paper and which shall be valid till completion of supplies plus 60 days against the concerned PO . The format will be furnished by HAL Barrackpore division in the event of placement of order.
16 Risk purchase In the event of the Sub-Contractor failing or regretting to execute the order, within one month after the expiry of the delivery date indicated in the orders or any extension granted thereof specially by HAL Barrackpore Division, HAL Barrackpore Division at its discretion in addition to levying liquidated damages as per liquidated damage clause above, will also have the right to initiate risk purchase and get such items, which remain undelivered, carried out protective finishing operations from alternate sources and recover the extra cost thus incurred by HAL Barrackpore Division from the Sub-Contractor.
17 Confidentiality agreement a) HAL Barrackpore Division will provide drawings (hard/soft copy) to Sub-Contractor for protective finishing of these parts. All the documents issued to Sub-Contractor are strictly confidential. Sub-Contractor should keep them in safe custody. The information contained in the documents should neither be divulged to any other person by Sub-Contractor nor copied. Sub-Contractor is solely responsible to prevent any possible pilferage of these documents.
b) The models modified/developed by the Sub-Contractor on HAL’s instructions/technical inputs will be the property of HAL and supplied back to HAL on completion of the order.
18 Parallel agreement / contract Nothing in this agreement / contract precludes HAL Barrackpore Division from entering now or hereinafter into any agreement / contract with others for protective finishing operations and supply of same or similar goods.
19 Termination of contract In the event of HAL being not satisfied with the performance of the Sub-Contractor at any point of time, in terms of either quality of job or care of our material or delivery, also in case the Sub-Contractor indulges in malpractices, fraud, cheating etc., HAL Barrackpore Division shall be entitled to terminate the contract, after giving 30 days notice in writing to the Sub-Contractor by registered post/courier/fax/email and under this condition HAL Barrackpore Division will not be liable to pay any compensation whatsoever to the Sub-Contractor.
20 Jurisdiction The court at Kolkata (West Bengal) only shall have jurisdiction to deal with and decide any legal matter whatsoever arising out of this contract.
21 Counter terms and conditions When counter terms and conditions of the business are offered by the bidder, HAL shall not be deemed to be governed by such terms & conditions unless written acceptance thereof has been given by HAL. No conditions & terms, notice of which has not been given in the tender by bidders submitting quotations will be considered by HAL, if put forward in subsequent correspondence and after placement of order.
22 Sub-contracting / Sub-letting In the event of an order by HAL, Sub-Contractor shall not further sub-let to it’s sub-contractors in executing the order without prior approval from HAL subcontract department. If Sub-Contractor is going to use the facilities from their sub-Sub-Contractor, the details of such sub-Sub-Contractors, their facilities and approval of facilities etc are to be submitted to HAL and prior approval for use of their facilities may be obtained from HAL, Barrackpore division.
23 Modification & Improvements/ Drawing changes a) Sub-Contractor shall implement minor Process/drawing changes as and if advised during protective finishing operations and compliance of Project slips/deviation slips/repair schemes related to individual drawings at no additional cost.
b) Sub-Contractor should notify HAL, incase of chage in product and/or process definition and, where required shall obtain approval from HAL.
24 Warranty The supplies shall be free from any defects/workmanship and shall be guaranteed for quality/satisfactory performance for a period of 12 months from the date of acceptance. Any defects because of faulty workmanship noticed during the guarantee period shall be rectified by the Sub-Contractor free of cost. In case, where full checking is initially not possible and the final inspection will be done at the time of actual production, the defects if any noticed at that time will be reported immediately to the Sub-Contractor. In case the Sub-Contractor fails to rectify within 30 days from date of notification, the cost of raw materials and the other charges paid Sub-Contractor will be recovered from pending bills/BG/Security deposit of the Sub-Contractor.
25 Appropriation Whenever any sum of money is recoverable from sum of money payable by the bidder, HAL shall be entitled to recover such sum by appropriating in part or whole by deducting any sum then due or which at any time thereafter may become due to the bidder in this or any other contract entered by HAL AS A WHOLE ITS Divisions and Branch offices etc., held by him alone or in partnership with others. Should this sum be not sufficient to cover the full amount recoverable, the bidder shall pay to HAL on demand the remaining balance due.
26 Applicable Law This contract shall be governed by and subject to and interpreted and construed in accordance with the Laws of Republic of India, as may be in force from time to time.
27 Arbitration All disputes or differences whatsoever arising between the parties out of or relating to the construction meaning and operating or effect of this contract or the breach thereof shall be settled by arbitration in accordance with the rules of arbitration of the. Indian Council of Arbitration and the award made in pursuance thereof shall be binding on the parties.
28 Work & Payment During Arbitration Work under the contract shall if reasonably possible continue by mutual agreement during the arbitration proceedings and no payment due to or payable by HAL will be withheld without reasonable cause and merely on account of the tendency of such proceedings unless the same is subject of arbitration.
29 Fall Clause The price quoted shall be in no event exceed the lowest price at which you sell the stores or offer to sell stores of identical description to any person(s) / organization including the purchases by any department of the Govt. of India, the State Govt. or any statutory undertaking of Govt. of India / State Govt., as the case may be during the period till the completion of the performance of the order placed and during currency of the order.
If at any time during the said period, the Seller reduces the sales price, sells or offer to sell such stores to any person(s) organization including the purchaser or any department of Govt. of India or State Govt. and any statutory undertaking of the Govt. of India / State Govt. as the case may be, at a price lower than the price chargeable in the order, Seller shall henceforth notify such reduction / sales or offer to sale to Hindustan Aeronautics Ltd., and the price payable in the order for the stores supplies after date of coming into force such reduction or sale or offer to sale shall stand correspondingly reduced.
30 Response/Regret Please send your Regret Reply in case the subject item is not covered in your range of products or you are not willing to submit proposal.
31 Applicability of terms & conditions Any order resulting from this enquiry, shall be governed by the General Terms & conditions of contract of HAL, and the same will be printed on overleaf of Purchase order.
32 Despatch Documents Sub-Contractor to provide below mentioned documents along with the supplies: 1. Delivery Challan 2. Invoice 3. Undertaking for Material Consumption as per Sl.No. 10 mentioned above 4. Signed Process Sheet as per Sl.No. 12(d) mentioned above 5. Detail Inspection Report / Work done Report Consignment not accompanying any of the above documents will be returned back to the sub-contrator.
33 In the event the values in figures and in words do not match, the values in words would be considered as final.
34 HAL, Barrackpore Division reserves the right to reject, partially or fully, offers received. HAL, Barrackpore Division also reserves the right to modify (by adding or deleting)/relax any of the tender condition/give some time for compliance after opening of Technical bid if feel necessary for competitative offer or for smoothness of execution of order without asserting any reason to any contractor.
35 Late / Delayed Offers Will Not Be Considered.
36 If purchase order is not placed on you, you should positively return back the drawings/technical specifications provided to you by HAL Barrackpore division.
37 The participating MSEs in a tender, quoting price within the band of L1 + 15% may also be allowed to supply a portion of the requirement by bringing down their price to the L1 price, in a situation where L1 price from someone other than MSE. Such MSEs may be allowed to supply upto 20% of the total tendered value. In case of more than one such eligible MSE, the supply will be shared equally.
38 Please mention about the status of your firm or company whether: (A) MSE (B) Small Scale Industries (SSI) (C) Ancillary Unit (D) Large / Small (E) Agent (F) Stockiest (G) General order Supplier (Please indicate your Registration Number).
39 In case of MSME Sub-Contractor, pl mention whether SC/ST or not? If yes, suitable certificate to be enclosed.
40 All other general terms and conditions as per Annexure-III are acceptable. However, terms & conditions mentioned in Annexure-II will supersede the same mentioned in Annexure-III.
Technical Terms & Conditions
Name of Sub-contractor:
Tender No.: HAL/BKP/SC/2024-25/98221365/3
Sl. No. Description Essential/ Desirable Complied (Yes/No)
1 Protective finishing on the fabricated items supplied by HAL, Barrackpore to be carried out as per drawing and process sheet supplied by HAL Barrackpore Division. Essential
2 Each inventory part no. is having suffix -P which signifies external operation to be carried out as per Drawing & MPS provided by HAL, Barrackpore. Desirable
3 Any alternative technology/methodology may be used on the part only after prior approval of HAL process planning/methods. Any minor amendment/notifications in the parts as issued by HAL process planning/design/methods departments at later date will be incorporated by supplier at no additional cost. Essential
4 Items may be given to supplier based on P.O. placed for protective finishing on staggered basis as per HAL, BKP requirement. After protective finishing, items to be returned by the supplier within 4 weeks from the date of receipt of items on which protective finishing to be done at their end. Essential
5 For any technical clarification or understanding the job, supplier may visit HAL, BKP before submitting the quotation. Desirable
6 Inspection & acceptance of component will be carried out in HAL premises and acceptance will be certified by HAL, Inspection Department. Essential
7 Supplier has to certify that they have used same item which was supplied by HAL for protective finishing to them. Essential
8 Supplier has to declare that they will be held responsible if any failure/discrepancy occurs due to failure in protective finshing in future and HAL will have full authority to take any appropriate action against them. Essential
9 Supplier must ensure availability of relevant HPS (which is mentioned in the connected MPS) during submission of quotation. If not availaible, Supplier should collect the HPS from HAL, Barrackpore before submission of quotation. Essential
10 Supplier must maintain the thickness of plating as per HPS provided if not specifically mentioned in MPS. Supplier has to submit report mentioning thickness of the plating. Essential
11 Supplier must submit work done report, process sheet endorsed with all columns filled with complete details along with the item. Essential
12 Process Validation for special process to be carried out as per requirement of AFQMS / AS 9100 D, wherever required. The actual validation process is to be carried out at vendor’s premises with all arrangement (to be made) by vendor. HAL QC personnel will witness the same and coordinate the process validation record. Essential
13 Supplier is to submit approval copy of DGAQA or NADCAP for chemical processing job at the time of submission of their offer. Desirable
14 In cases , where facilities for the designated special processes as per tender are available with the vendor but without HAL or DGAQA or NADCAP approval, those unapproved facilities will be vetted by HAL Barrackpore QC dept and or DGAQA in the technical evaluation stage and accorded approval for acceptance of offer." Essential
JOB WORK DETAILS SUMMARY
Name of Sub-Contractor:
Tender No. : HAL/BKP/SC/2024-25/98221365/3
SL no MSR Sl. No. Part No Part Name Job Work Description QTY UOM Vendor's Compliance
1 6 3130-28-01-031-P COVER STRIP 1-5 micron as per HPS 201 TYPE 1 FINISH 1 - HOT WATER SEAL TO BE CARRIED OUT AS PER ATTACHED DRAWING AND MPS 80 NO.
2 19 3130-73-17-102-P PIN 8-13 micron ( upto 25 micron) as per HPS 201 TYPE 2 PREFERABLY FINISH 1 -HOT WATER SEAL TO BE CARRIED OUT AS PER ATTACHED DRAWING AND MPS 100 NO.
3 24 3130-28-02-031-P COVER STRIP 1-5 micron as per HPS 201 TYPE 1 FINISH 1 - HOT WATER SEAL TO BE CARRIED OUT AS PER ATTACHED DRAWING AND MPS 80 NO.
4 31 11224CE0002-P PRESSURE CONNECTOR 1-5 micron as per HPS 201 TYPE 1 FINISH 1 - HOT WATER SEAL TO BE CARRIED OUT AS PER ATTACHED DRAWING AND MPS 150 NO.
5 32 11224KB0001-P PRESSURE CONNECTOR 8-13 micron ( upto 25 micron) as per HPS 201 TYPE 2 HOT WATER SEAL TO BE CARRIED OUT AS PER ATTACHED DRAWING AND MPS 105 NO.
6 66 3130-25-04-402-P SHIM 8-13 micron ( upto 25 micron) as per HPS 201 TYPE 2 PREFERABLY FINISH 1-HOT WATER SEAL TO BE CARRIED OUT AS PER ATTACHED DRAWING AND MPS 150 NO.
NOTE: Disclosure of Price in Technical bid in any form will be liable for rejection of bid.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
raw.json
RAW_JSON
RFQ98221365_3.pdf
TENDER_DOCUMENT • 0.30 MB
HPS-201.pdf
TENDER_DOCUMENT • 1.46 MB
DRAWINGS.pdf
TENDER_DOCUMENT • 0.62 MB
ANNEXUREI_PRICE_BID_98221365_3.xlsm
TENDER_DOCUMENT • 0.01 MB
ANNEXUREII_98221365_3.xlsm
TENDER_DOCUMENT • 0.02 MB
AnnexureIII_GeneralTC_98221365_3.pdf
TENDER_DOCUMENT • 0.18 MB
AnnexureIVBATCHVALUECOST98221365_3.pdf
TENDER_DOCUMENT • 0.41 MB
OmnibusNDA-Outsourcing-FORMAT.pdf
TENDER_DOCUMENT • 0.21 MB
AnnexureA_98221365_TechnicalTC_3_Revised.xlsm
TENDER_DOCUMENT • 0.01 MB
MPS.pdf
TENDER_DOCUMENT • 1.29 MB
ANNEXUREV_JobWorkDetailsSummary_98221365_3.xlsm
TENDER_DOCUMENT • 0.01 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .